Issuu on Google+

ALL OY

LIVE WORK


ALLOY :

a mixture of two different materials that are combined under an intensive heated process to yield a better and stronger result


two spatial typologies are fused together in order to enhance creativity and efficiency of a live work environment


TECH SHOP PERSPECTIVE


PROGRAM:

a three part program, including offices, an apartment complex, and a tech shop. these three elements are linked together by a highly colaborative and dynamic inventor’s gallery


HVAC

KITCHENETTE

RESTROOM

RECEPTION

LOBBY

TECH SHOP

GROUP WORK

CONFERENCE

OFFICE

RK O W

WOR K S BY ICES B LO ERV C S VA S H OOM R T S RE HENETTE KITC GALLERY

ST UD IO

CH

TE

2 BEDROOM

W O R K RK WO

OP SH

1 BEDROOM

LIVE

1 BEDROOM

LIV E

OM RO ED 2B

primary adjacencies secondary adjacencies teriary adjacencies

OFFICE CON F E R ENC GR E OU

STUDIO

RT O P P U

LIVE

E LIV

RK

GALLERY

PW O

WORK FLOW

[LIVE]+[WORK]= 61410 SQ FT

LIV E


MASSING:

in essence, the program consists of a work component, a living component, and how these two spaces meet will determine how the building beings to interact with the site


MASSING INTERACTION STUDY


MASSING MODELS


INVENTOR’S GALLERY, UPPER LEVEL


SITE:

GREENVILLE, SC


the site selection and building placement were based on connection to the greater city of greenville, communal and industrial ties adjacent to the site, and making the building a destination spot along the swamp rabbit trail


SITE DESIGN STUDIES


CREATE URBAN HABITAT

use of native plants that have significant coverage promote a natural urban habitat for species which live close to or within the city. adjacency to the swamp rabbit trail makes this particularly important, and this type of environment is crucial to aviary populations


ENHANCE CONNECTIVITY

analysis of primary and secondary pathways traveling through the central courtyard creates a hierarchy of travel as well as a solid void relationship to inform landscaping design, creating strong connections through the space.


DESIGN FOR NATURAL DRAINAGE

the low elevation, proximity to the reedy river, and close flood plain make drainage considerations crucial to the site. designing landscaping to allow for natural drainage, while including a water feature (something which is common in greenville) will help manage the water on the site when paired with formal drainage construction


1.

Crab Apple Trees

2.

Hairy Awn Muhly Grass

3.

Red MapleTrees

4.

White-Top Star Grass

5.

Dog Wood Trees

6.

White Awn Muhly Grass

7.

Black Eyed Susan

8.

Existing Oak Trees

1

2

3

4

5


INVENTOR’S GALLERY & COURTYARD

6

7

8


COURTYARD APPROACH


FLOOR PLANS:


FIRE WALLS

10 0’

0’ 16

2 00

100

EGRESS UP

GALLERY HIGHLIGHT


2B

ED

1B

ED

ED

2B

1B

DIO STU D E

1B ED UP

DN

LEVEL 3

LEVEL 2

DN

UP

LEVEL 1

UP

UP

UP

C ME L

ICA

N HA

LEVEL O


2B

ED

1B

2B

ED

ED

2B

ED

1B

DIO STU D E

DIO STU ED 2B

1B

ED

LEVEL 5

2B

ED

1B

2B

ED

ED

2B

ED

1B

DIO STU D E

1B

ED

LEVEL 4

LIVING UNIT


ELEVATIONS:

brick & metal panel exterior


NORTH ELEVATION

NORTH

SOUTH ELEVATION


VEHICULAR APPROACH


PEDESTRIAN APPROACH


MECHANICAL

WORK | single package units LIVE | all water system with fan coil units


chimney

TECH SHOP single package unit

cooling tower

LIVE all water system localized with fan coil units

ZONE

air return

air supply

ZONE

air supply

air return

WORK single package unit

3

3

ZONE 4

ZONE 1

2

ZONE 1

boiler

cold water supply + return (dual pipes)

ZONE

2

hot water supply + return (dual pipes)

ZO N E

water chiller


STRUCTURAL

steel frame system


LOAD FROM STRUCTURE ABOVE

M OR

DS LOA

A

(DE

LIV D+

E)

IF UN

BEA

ST JOI

D LOA

ML OAD

BEA

ML OAD

LOAD PATH TO FOOTING


INVENTOR’S GALLERY, LOWER LEVEL


1

2

3

4

5

6


FLASHING

1

SEALANT & RIVET

CLEAT

WOOD BLOCK

FASTENER

FLASHING

RIVET

FASTENER

CONTINUOUS SEALANT

1/4” THICK SHIM FOR WEEPING

SUBGIRT

WATERPROOFING ROOFING MEMBRANE

WATER PROOFING MEMBRANE

5/8” DENS GLASS SHEATHING

SHEATHING

1/2” COVERBOARD DENS GLASS SHEATHING 2 LAYERS OF 2” ROOFING INSULATION

INSULATED METAL PANELS

C DECKING BATT INSULATION STEEL JOIST DROP CEILING (3/4” & 1 1/2” TRACKING SYSTEM)

FLASHING [STAGGER JOINTS] FLASHING FASTENER WEATHER SEALANT FOLDING SUN SHADES

2 FOLDING SUN SHADES

BATT INSULATION

WEATHER SEAL

STRUCTURAL STEEL STUDS

SEALANT & RIVET

SHEATHING

FLASHING

FAN COIL UNIT

SUBGIRT

FINISHED FLOORING

SUBGIRT FASTENER

1/2 PLYWOOD SUBFLOORING

VENTILATION GRATE

C DECKING WITH CONCRETE FILL

WEATHER & AIR BARRIER

SPRAY IN INSULATION

SHEATHING

STRUCTURAL JOIST

INSULATED METAL PANELS

HOT AND COLD WATER SUPPLY AND RETURN

PANEL FASTENER

BATT INSULATION

SUBGIRT

STRUCTURAL C CHANNELS

SEALANT & FASTENER FLASHING PANEL FASTENER

SHEATHING WEATHER & AIR BARRIER SUBGIRT FASTENER INSULATED PANELS


3

FLASHING CLEAT FASTENER RIVET CONTINUOUS SEALANT

1

SEALANT & RIVET WOOD BLOCK

SUBGIRT WATER PROOFING MEMBRANE SHEATHING

FLASHING FASTENER

2

1/4” THICK SHIM FOR WEEPING

INSULATED METAL PANELS

1/4” TILED FLOORING (SLOPED) WATERPROOFING MEMBRANE 1/2” COVER BOARD DENS GLASS SHEATHING 2” INSULATION C DECKING WITH CONCRETE FILL

3

BATT INSULATION

4

STEEL JOIST DROP CEILING (3/4” & 1 1/2” TRACKING SYSTEM)

5 FLASHING [STAGGER JOINTS] FLASHING FASTENER

6

WEATHER SEALANT FOLDING SUN SHADES

4

EXTERIOR STOREFRONT GLAZING WEATHER SEAL FLASHING METAL GLAZING CAP

1/4” TILED FLOORING (SLOPED)

FINISHED TILED FLOORING

WATERPROOFING MEMBRANE

C DECKING WITH CONCRETE FILL

1/2” COVER BOARD DENS GLASS SHEATHING

BATT INSULATION

2” INSULATION

STEEL JOIST

C DECKING WITH CONCRETE FILL

DROP CEILING (3/4” & 1 1/12” TRACKING SYSTEM)

BATT INSULATION STEEL JOIST DROP CEILING (3/4” & 1 1/2” TRACKING SYSTEM) INTERIOR PARTITION WALL WITH 6” STEEL STUDS, 3/8” 2 HR GYPSUM BOARD, INSULATION FOR SOUND & CLIMATE


DROP CEILING (3/4” & 1 1/12” TRACKING SYSTEM)

C DECKING WITH CONCRETE FILL BATT INSULATION STEEL JOIST DROP CEILING (3/4” & 1 1/2” TRACKING SYSTEM) INTERIOR PARTITION WALL WITH 6” STEEL STUDS, 3/8” 2 HR GYPSUM BOARD, INSULATION FOR SOUND & CLIMATE

METAL GLAZING CAP

5

EXTERIOR STOREFRONT GLAZING

METAL WATER DRAINAGE GRATE

FINISHED TILED FLOORING

FLASHING

C DECKING WITH CONCRETE FILL

WATER PROOFING MEMBRANE

WATER STOP

COURSE AGGREGATE

CONDITIONED SPACE

FILTER FABRIC RIGID INSULATION WATER PROOFING MEMBRANE

6

CONDITIONED SPACE

COURSE AGGREGATE

1/2” CONCRETE EXPANSION JOINT

FILTER FABRIC

WATER STOP

RIGID INSULATION

WATER PROOFING MEMBRANE

WATER PROOFING MEMBRANE

RIGID INSULATION

CONCRETE CANT

FILTER FABRIC

STRUCTURAL REBAR REINCOREMENT

COURSE AGGREGATE

DRAINAGE PIPE



ALLOY | Live + Work