Portfolio_YIHUAN_XU_Architecture Design programme

Page 1

ARCHITECTURAL DESIGN PORTFOLIO Selected Work 2018-2021

Yihuan Xu/Joseph Kahn


TABLE OF CONTENTS

PRELIMINARY RESEARCH·································25

PROJECT INTRODUCTION··························12

PROJECT 1 :

RENOVATION DESIGN OF XINHUA BOOKSTORE

PRELIMINARY RESEARCH········13 GENERAL LAYOUT····················14 SPATIAL LAYOUT WAY AND STREAMLINE ANALYSIS···········15

PROJECT 3 : DAZU CREATIVE PARK----EXHIBITION HALL

PERSPECTIVE····························17

In my own opinion, my composition as an author is equal to that as an architect. Building is a risk accurately. ------------------- Rem Koolhaas

PROJECT INTRODUCTION·············04 PRELIMINARY RESEARCH····················05 DESIGN CONCEPT AND DESIGN STRATEGY·····················06 FUNCTION AND STREAMLINE·················09 CROWD ACTIVITY ANALYSIS AND CROSS-SECTIONAL PERSPECTIVE···············10

PROJECT 2 : DAZU ARTIST TOWN

HISTORICAL EVOLUTION,STATUS ANALYSIS AND DESIGN THEME··························26 PLAN OF EACH FLOOR AND DESIGN VISION···························29

PROJECT 5 : FLOWING LUOWAN TOWER

OPERATION POSITION·············30

PRELIMINARY RESEARCH·····················19 GENERAL LAYOUT········20 DESIGN CONCEPT, FUNCTION AND STREAMLINE··················21 MATERIAL ANALYSIS AND PLAN OF EACH LAYER·····························22 NODE PERSPECTIVE················23

PROJECT 4 : SUINING MEDIA CENTER

PROJECT INTRODUCTION··············32 PRELIMINARY RESEARCH·····················33 ANALYSIS OF URBAN SKYLINE BLOCK,CONCEPTION GENERATION·················34 CROSSSECTIONAL····················37 NODE PERSPECTIVE················38


PROJECT 1 : RENOVATION DESIGN OF XINHUA BOOKSTORE PROJECT LOCATION :

BUSINESS DISTRICT, NORTHEAST CORNER, HONGQIAO DISTRICT, TIANJIN

COMPLETION TIME : JUNE 1, 2021

This project came from the Revit cup architectural design competition in 2021, which was also my graduation project. It aimed to solved the contradiction between increment and stocked in the city while creatively transforming the traditional Xinhua Bookstore, and endowed it with new enterprise value, public value and cultural and artistic value. Whether it was the time translation of network marketing strategy, or the extension of traditional customs and group memory; It should highlight a prominent theme of sustainable development and reflected people's understanding of low-carbon cities and green buildings.


Refurbishing DaHutong DaHutong Market Dragon Tower

LOCATION OF THE STATUS ANALYSIS:

Tianjin Eye Ferris Wheel

Northbound East Square Residential Area

Li Shutong Memorial Hall

Strip Mall

Emperor Crossing The River Site Park

DESIGN STRATEGY:

N

Children's reading area

+ +

+

Original construction area: 6000m2

=

Total construction area: 12798.96m2 14.4% 5.3%

9.1%

4.8%

33.5%

4.2%

4.2%

6.6%

3.9%

4.5%

10.4%

7.5%

Diminishing publicity

Increasing noise level

BLOCK GENERATION: Old main entrance

The Main Building Texture

OLD BOOKSTIRE REMOVABLE BUILDING

Secondary Building Texture

6% Gray Space: 768.37m2

Social Space: 1335.86m2

Public Transport And Ancillary Housing: 686.79m2

Dining Room And Kitchen: 575.19m2

Coffe Shop: 498.25m2

Living Room And Ancillary Room: 1162.21m2

Children's Reading Area: 543.81m2

Electronic Reading Area: 538.08m2

Reading Area: 4283.03m2

Exhibition Area : 611.91m2

Living Room And Ancillary Rooms: 1162.21m2

Bedroom: 1162.21m2

Nearby parking lot

38.9%

46.7%

ORIGINAL BUILDING COLUMN GRID

ADDITIONAL FLOOR SPACE AND COLUMN GRID

AN ELEVATED PART OF THE SPACE

HaIhe River Green space Base On The Terrain The Main Road

Book Excibition Area

Radiation Range Of Landscape Nodes

67.1m

66m

82.8m

The old Xinhua Bookstore was located in the northeast corner of Nankai District, Tianjin, with convenient transportation. There was an Ancient Culture Sstreet scenic spot in the northeast corner of the bookstore.

HISTORICAL EVOLUTION:

THREE ENTRANCES AND EXITS

Line Of Sight Node

50.7m

Stomatological Hospital

Haihe Residence

Bus Station

Xin Hua Bookstore

Officer Of Bank

Ancient Tianjin Old Zhongshan Park Ancient City Museum Culture Street Culture Street

The current situation of the site was that the old bookstore would be renovated next to the multi-storey podium that would be demolished.

Remove the facade of the old bookstore and retained its beams, columns and other load-bearing structures.

B&B

On the basis of the original building, a new building volume and column net structure were added.

THE ARCGITECTURAL FORM THATGRADUALLY TAKED SHAPE

RESTAURANT BOOKSTORE

The first floor of the building had three entrances , exits, and the ground floor was partially returned to the urban space on stilts.

PART OF THE VOLUME THAT HAS BEEN ELIMINATED PATIO

1716 1946

1940

1951

On January 31, 1949, Tianjin was liberated, and the department store building before liberation was renovated.

IIn February 1950, Wangfujing branch of Xinhua Bookstore in Beiping opened opened.

1949

1987

On January 15, 1987, the old department store was replaced by the new Northeast Corner Xinhua Bookstore until today.

1950

In October 1951, Xinhua Bookstore, Fuzhou Road, Shanghai was established.

1948 In October 1948, the second branch of Northeast Bookstore opened.

1947 In October 1948, the Jinan branch of East China Xinhua Bookstore opened.

The northeast branch was established in Jiamusi.

1942 On May 1, 1942, the Shaanxi Gansu Ningxia border branch of Xinhua Bookstore opened in Nanguan new market, Yan'an.

Xinhua Bookstore was established in Yan 'an.

With the demolition of the North Pass, the northeast corner of the old site was transformed into a department store, where shops have sprun up like mushrooms.

1937

In April , the first branch of Xinhua Bookstore opened in Xingxian county, Shanxi Province.

1920S

In the 1930s, Guan Yin became the name of the northeast corner, and at the same time, it became the gathering place of dignitaries in old Tianjin.

Beidaguan, the earliest predecessor of Xinhua Bookstore in the northeast corner, was the place where the Qing government levied taxes.

In 1949, Chairman MAO announced the founding of new China, Xinhua Bookstores from liberated areas to all parts of the country.

1930S

CAFE&BAR

ADMINISTRATIVE OFFICE

We rezoned the old Xinhua bookstore and added new functions.

We furthered subdivided the current functional blocks of the building.

COMPLETED BUILDING BLOCK

Used the subtraction method of the block to cut the architectural form completely.

A patio was cut out to complete the final design.


N

5F

3F

6F 4F

1st FLOOR PLAN

5F

2nd FLOOR PLAN

3rd FLOOR PLAN

6F

0

5

10

20

Economic and technical indicators: Total construction area: 12,798.96m2 Original construction area: 6000m2 Expanded construction area: 6798.96m2 Total site area: 4973.02m2 Building base area: 3121.44m2 FAR: 2.6 Building density: 33.7%

4th FLOOR PLAN

5th FLOOR PLAN

6th FLOOR PLAN


CROSS-SECTIONAL: CHILD

00.00

01.00

02.00

03.00

WORKER

B&B

BOOKSTORE

PERSPECTIVE

04.00

05.00

06.00

07.00

STAFF

08.00

09.00

10.00

STUDENT

SENIOR CITIZEN

MIDDLE-AGED PEOPLE

YOUTH

11.00

12.00

13.00

FUNDER

14.00

15.00

16.00

READER

17.00

18.00

19.00

20.00

RESIDENT

21.00

22.00

23.00

GUEST

CAFE AND OFFICE MEETING SPACE

WORKING SPACE

READING SPACE

REST SPACE

AFTERNOON TEA SPACE

SELF-STUDY SPACE

24.00


AERIAL VIEW

PROJECT 2: DAZU ARTIST TOWN PROJECT LOCATION :

SANQU TOWN,DAZU DISTRICT,CHONGQING

NODE PERSPECTIVE 1

NODE PERSPECTIVE 2

NODE PERSPECTIVE 3

COMPLETION TIME : SEPTEMBER 5,2017

This project was completed in the summer of the first year of my work. In this project, I mainly assisted the main architect to worked out the creative schemed of plane and elevation, as well as the drawed of analysis drawing, the deepening of digital model and the layout of scheme text. I was responsible for the construction of Building 1 in detail. Sanqu town where the project was located had simple folk customs. Although there were some exquisite ancient buildings of more than hundred years, most of the buildings were dilapidated and needed to be rebuilt. With the support of national policies, there were industrial parks expanding outward. Our project was near the industrial park. Due to the influence of the surrounding environment and in response to the government's called for regional local architectural design, we decided to learned from the design language of Chinese classical architecture and surrounding local architecture to guided the design. This design provides me with valuable experience for a deep understanding of regional architecture. The total construction area of the project was 14142.13m2, the construction land area was 1520638m2, the plot ratio was 0.93 and the green space rate was 17.03%.


LOCATION OF THE STATUS ANALYSIS:

N

N GOVERMENT BUILDING

STONE GRAVES

CHONGQING THE HIGHWAY

MIDDLE SCHOOL

SITE

BRANCH

RAPE FIELDS AROUND TOWN

5KM

STONE GRAVES OF SHIZHUAN MOUNTAIN

10KM

THE EXICIBITION HALL OF THE FUTURE

CAVE RIVER

A CONCENTRATED AREA OF THE TWON OF SANDRIVE

CAVE RIVER

DAZU

AD AIN RO THE M YUECHI BRIDGE IN SANQU TOWN

BASE POSITIONING ANALYSIS:

BASE

1KM

3KM

Sanqu town, Dazu District, surrounded by mountains, was pierced by the Cave River, near the Stone graves of Shizhuan Mountain, convenient transportation was a good place for DANEI EXPRESSWAY vacation and leisure. HISTORICAL EVOLUTION: N


SPATIAL LAYOUT WAY:

SEQUENCE

STREAMLINE ANALYSIS:

INTERWEAVE

SPREAD

FACADE STYLE::

FUSE O PEN

The extract was refined design elements, integration, the formation of new layouts: sequence, interleaving, distribute, integration, the new layout would be applied to the design, to created a reasonable space layout , to created a modern, minimalist, art landscape space environment.

ENCLOSED SPACE

P RIVATE

ENCLOSED SPACE

s TREET

NARROW

LANE TRAFFICE

TRAFFIC

LANDSCAPE ANALYSIS:

S ECONDARY STREET

WHITE WALI

+

ENCLOSE PRIVATE SPACE SEMI-ENCLOSED SPACE

STONE FACING

+

OPEN UP THE PUBULIC SPACE

BASAL RELATIONSHIP:

SPATIAL DIVERSITY ANALYSIS: OUTSIDE THE STREET SPACE: RIVER LANSCAPE:

SHOW OFF

GREEN TILE ROOF

OUTSIDE

l ANSCAPE NODE

l ANDSCAPE AXIS

PLAN OF EACH FLOOR:

GALLERY

FUNCTIONAL ANALYSIS: IN THE STREET SPACE:

SHOW OFF INSIDE LEISURE

LOCAL ANALYSIS:

THE COURTYARD SPACE:

SERVE REST BUSINESS

c REATIVE

ACTIVITY SPACE

PUBLIC

INTERACTION SPACE

1#1st FLOOR PLAN

1#2nd FLOOR PLAN

2#1st FLOOR PLAN

2#2nd FLOOR PLAN

3#2nd FLOOR PLAN


AERIAL VIEW

PROJECT 3 : DAZU CREATIVE PARK-----EXHIBITION HALL PROJECT LOCATION :

SANQU TOWN,DAZU DISTRICT, CHONGQING NODE PERSPECTIVE 1

NODE PERSPECTIVE 3

COMPLETION TIME : NOVEMBER 16, 2017

This project was another entity project after the art town. It was separated from the art town by an old town of Sanqu town. In this project, I participated in the drawing of floor plan, posted design and typesetting, construction drawing, rendering with Enscape and creative deliberation of architectural form. Considering the rainy summer in Sanqu Town, which was easy to cause floods, and the relatively backward medical conditions, we decided to design the exhibition hall with one room for multiple purposes, and could be transformed into a shelter and shelter hospital if necessary. The overall form of the building was occluded and interspersed, so as to achieve rich levels of indoor and outdoor space. The facade adopts local rubble combined with local traditional carving technology to echo the local culture and environment. At the same time, we also used the concept of planting roof to reduce building energy consumption. The construction land area was 12333.03m2, the total building area was 36475m2, the plot ratio was 1.98 < 2, the building density was 55%, and the green space rate was 35%.


LOCATION OF THE STATUS ANALYSIS:

N

N

0

THE HIGHWAY

CHONGQING

ART TOWN

BASE

DAZU

BRAN

CH

SERVICE FACILITIES AROUND THE BASE:

SITE

CAVE RIVER

A CONCENTRATED AREA OF THE TWON OF SANDRIVE

STONE CARVINGS OF SHIZHUAN MOUNTAIN FACTORY

CULTURAL INDUSTRIALl PARK

COMMERICAL STREET

HOSPITAL

5KM

DAZU NO. 3 MIDDLE SCHOOL TH

EM

OLD STREET

STONE CARVNG STRAW MAT STUDIO INDUSTRIAL PARK

LAND LAYOUT PLAN:

SURROUNDING LOCAL BUILFDINGS

PRIMARY SCHOOL

AIN

10KM RO

AD

The exhibition hall is closed to the art town. It was the second phase construction project in the creative park. It was surrounded by Sanqu town and Nongtian, with beautiful and pleasant scenery.

POSITIONING ANALYSIS:

N

INDUSTRY ANALYSIS:

INDUSTRIAL PARK SITE

FARMLAND 1KM 3KM PARKING LOT

SCOPE OF INDUSTRIAL PARK SCOPE OF THE BASE

N

5

10

20


INSPIRATION SOURCE:

FUNCTION STREAMLINE::

To the stone shrine worship culture, to write light and shadow

Design highlights:

VERTICAL TRAFFIC HORIZONAL TRAFFIC

Inspired by grottoes and niches, the building showed the traditional culture of Dazu and paid tribute to the traditional culture.

PLANTING ROOF EXHIBITION AND HIGHSPACE

[building blocks scattered] Through the technique of cutting and space displacement, the building volume with dialogue relationship is formed.

[Stone Mosaic]

1st FLOOR PLAN

Embodies the dazu stone carving characteristics of the tradition.

DESIGN CONCEPT: 2nd FLOOR PLAN

[SPATIAL VARIATION ] Spaces of different sizes were formed without interrupting the continuity of the interior. Through the inner courtyard and the corridor, people could walked through the whole building. Space was seen by the smallest.

ENTITY

[LIGHT PENETRATION]

COURTYARD

NEST

3rd FLOOR PLAN

The courtyard and inner courtyard made the light fade and shine, creating the beauty of light and shadow. VEGETATION COVERAGE AREA

[ THE BEAUTY OF NATURE ] The harmonious relationship between stone carvings and the natural environment was imitated, and greening was planted on the roof to made the building communicate with the natural environment.

EXIHIBIT PLACEMENT AREA

4th FLOOR PLAN

[ THE BEAUTY OF THE DISPLAY ] Inspired by stone niches, the exhibits were displayed in the building and also played a decorative role, complementing the building.

5th FLOOR PLAN


ENTRANCE PERSPECTIVE 1

ENTRANCE PERSPECTIVE 2

PERSPECTIVE

PROJECT 4 : SUINING MEDIA CENTER PROJECT LOCATION :

SUINING CITY,SICHUAN PROVINCE

COMPLETION TIME : JULY 30, 2018

This project was the first architectural project designed by BIM after I worked. This project taught me how to use rhino to make this complex curved shape. I participated in the model creation, analysis drawing, plane drawing of each layer and post text production of this project. The project was located in the center of Suining, adjacent to Fujiang River in the East, closed to mountains and rivers, with a beautiful environment. The construction land area was 44156.26m2, the total construction area was 107224.6m2, the building density was 35%, the plot ratio was 1.79 < 1.80, and the green space ratio was 40.12% > 40%.


LOCATION STATUS AND LANSCAPE ANALYSIS:

N V

MOUNTAIN

1

According to the location of the project site, from the line of sight, green space, waterscape and other aspects of analysis, judge that the southwest direction of the project landscape was excellent.

AY

Now we need a new landmark to represent our city.

ON

AL

FINANCIAL CENTER

EN

ATI

We were salt picker in the period of the Republic of China. Suining was very backward at that time.

CITY CULTURAL CENTER

It was a miracle that Guangde Temple in Song Dynasty can be preserved to this day.

Let's see Huanwen's Northern Expedition liberated Suining. By the way, let's enjoy Chen Ziang's poetry reading.

SITE

CHINA

Green space Water space The main road

2

1KM WETLAND PARK

Important building The secondary road

3

TongDE Bridge

4

FU RIVER

Suining city was located in the central part of Sichuan Basin, equidistant triangle with Chengdu and Chongqing. In history, Suining became the political, economic and cultural center of Central Sichuan due to its profound cultural deposits, beautiful mountains and clear waters, and developed agriculture and commerce, especially famous for its textile and food industry.

I'm Chen Ziang, I was born in Suining in the Tang Dynasty.

THE SUINING GOVERNMENT

SUINING CIVIC CENTRE 2KM

SICHUAN

I have witnessed the development of Suining from poverty to prosperity.

HW HIG

2

LIN

4

NIE

3

EAST LAKE

FU RIVER

The great Guanyin of Linquan temple have a new place to visit.

G31 8

1

乐山

DESIGN THEME:

HISTORICAL EVOLUTION:

WETLAND PARK

TH E

OR TH EA ST

RO AD

+

I'm Huan Wen, the hero of Suining liberation!

STATUS ANALYSIS: MOUNTAIN

SAIL

RIVER

Our design concept comed from the poem of Zhang Wentao, a famous poet and painter in the Qing Dynasty:Ten thousand trickled of water converge in the Fu River, and thousands of sails competed to flowed to the East. PERIPHERAL ANALYSIS

N FE

IN

IB

AD

A UC

RO

W

G

N PI

NG

DO

Suining Cultural Center is the first cultural landmark building in Suining. The project covers an area of 117 mu, with a total construction area of 121,600 square meters and a total investment of about 1.43 billion yuan. It consists of nine museums, one palace and one center, namely: Urban and rural planning exhibition hall, Green development experience hall, science and technology Hall, museum, library, Party history and Party construction Hall, culture hall, archives, geology Hall, youth Palace and intangible cultural Heritage Center. 1

AD

RO

SITE SHENGZHO

NG ROAD

0.5KM

N Foreground: Fujiang + Green Island

+

Medium Shot: Building

3

Jinke Jimei Jiayue

1

Residential area, the real estate for Jinke Jimei Jiayue, China Railway Lampo Jiangchen, Poly River and Villa. 3

City Cultural Center 3

SITE

Perspective: Mountains

=

2

Jinke Jimei Jiayue

+

4

China Railway LAN Po Jiang Chen

D

FANGZHOU ROA

N ROAD

XIANGLI

ROAD

OAD

DONG PING R

EAST FLAT

THE ORTH

N ROAD

BINFE

WUCAI

It is near the city cultural Center in the north, Jingzhong Road in the south, Colorful Road in the west and Deshui North Road in the east, covering an area of 66.15 mu with a total construction area of about 80,000 square meters. 2

Land for cultural facilities Mixed-use commercial and residential land TONGDE BRIDGE

+

SCENIC SPOT FL AT

SAINT LOTUS SQUARE

N

SUINING

The poetry seminar began!

SUINING SPORTS CENTRE

TRAFFIC ANALYSIS

1KM

How exciting!

5

Poly River and Villa

Mountain Line

Project Site

Residential Area

The South side of the project site formed a better skyline, high and low scattered. The northern skyline, on the other hand, was flattered and less varied.

Taking the sailing boat as the architectural symbol, the design was carried out through the rhythmic change of the symbol.


FORMAT ANALYSIS:

N

[

VIRTUAL VERSUS REAL

5

10

MOVEMENT AND STILLNESS

[

] GUIDENCE AND CONTROL ROOM

Static Cultural Exhibition

0

+

CAREER + INDUSTRY DRESSING ROOM

]

ANIMATION GAME STUDIO

NETWORK TECHNOLOGY

InteractiveCultural Communication Experience FILM AND TELEVISION PERFORMANCE STUDIO

20

TELEVISION STUDIO

DESIGN STUDIO

FILM STUDIO

BUILDING VOLUME GENERATION:

RADIO AND TELEVISION MEDIA BUSINESS DISTRICT

[

NOW + FUTURE

]

Architectural space Can be opened or closed Architectural space diversity Architectural space variability

While meeting the current needed, it also leaved room for future upgrading and transformation.

MEDIA CULTURE INDUSTRIUAL PARK

THE TOWER TREATED LAYERS OF BACK SETS CENTER SUBSIDENCE BIG AREA VIEW

SINKING SQUARE

SIGHT ANALYSIS:

Multiple experiences of sight: VISION: Riverside green space and Fujiang

MIDDLE SHOT: Square atrium landscape

CLOSE UP: Viewing platform landscape

The view is unobstructed:

RIVERSIDE GREEN

FU RIVER


PLAN OF EACH FLOOR:

OPERATION POSITION:

DESIGN VISION:

ENTERPEISE HEADQUARTERS ANIMATION GAME DESIGN STUDIO

OFFICE NEWS EDITOR

EMERGING MEDIA STUDIO

CULTUR ALEXICIBITION HALL

FILM AND TELEVISION PERFORMANCE

TELEVISION STUDIO

nd

2 FLOOR COMBINED PLAN

MEDIA BOOK PUBLISHING

OFFICE CONFERENCE ROOM

ADMINISTRATIVE OFFICE PUBLIC ACTIVITY CENTER

SPECIAL CENCERT HALL

st

1 FLOOR PLAN

EXECUTIVE CONFERENCE CENTER

BIG SPACE OFFICE

5th FLOOR PLAN

[

MODERN TIMES

+ TRADITION ]

Deduce traditional cultural elements with modern flexible curve.

NEW MEDIA COMPANY

PRESS CONFERENCE HALL

HOTEL

RECORDING STUDIO

ADMINISTRATIVE OFFICE

CULTURAL EXHIBITION AREA

EDUCATION AND TRAINING

TEVEVISION STUDIO

6th FLOOR PLAN

[ LOCAL + GLOBAL ]

+

2nd FLOOR PLAN

+

=

LOGISTICS SERVICE CENTER Supporting business

COLUMNLESS CONFERENCE ROOM

SPECIAL THEME CATERING

STAFF RESTRUANT

PUBLIC ACTIVITY CENTER

SUPPORTING BUSINESS

RECREATION & ENTERTAINMENT

GREEN ECO CITY: PLANTING ROOF

4# ADMINISTRATION BUILDING STANDARD FLOOR PLAN

MUNIVIPAL CULTURAL CENTER

rd

3 FLOOR PLAN

5# ADMINISTRATION BUILDING STANDARD FLOOR PLAN

CULTURAL + MEDIA CENTER = STRONG ATMOSPHERE This project was combined with riverside green space to built a green city.

FLOATING GARDEN

AERIAL VIEW


PERSPECTIVE

PROJECT 5 : FLOWING LUOWAN TOWER PROJECT LOCATION : TIANJIN BINHAI NEW AREA

NODE PERSPECTIVE 1

NODE PERSPECTIVE 2

NODE PERSPECTIVE 3

COMPLETION TIME : JUNE 25, 2020

This project came from the design course in the second semester of the fourth year of our university. The project was located in Xiangluowan business district, the core business area in Tianjin Binhai New Area. Xiangluowan has been established and developed for 10 years. So far, there was still great development potential and space, and the living service facilities need to be further improved, The location of the project was a block that needs to further improve these infrastructure. In addition to the office space, the high-rise building I designed also had commercial space that enriches everyone's life such as catering, retail and leisure activities, as well as a series of cultural spaces to improve their spiritual life such as galleries and coffee bookstores. The total land area of the project was 23065.8m2, the total building area was 77632.3m2, the aboveground building area was 50724.48m2, the building height was 257.4m, the building density was 36.07%, the plot ratio was 3.65 and the green space rate was 33.56%.


LOCATION OF THE STATUS ANALYSIS:

EDUCATION

600m

400m HAIHE RIVER

BLOCK GENERATION:

TIANJIN GLOBAL FINANCIAL CENTER H=336.9m

300m

BUILDING 9, TIANJIN JINWAN PLAZA H=300m 74FLOOR

TIANJIN BAOLONG INTERNATIONAL CENTER H=289.9m

200m

OAD T IGH ES P A SC LAN

SITE

HOSPITAL

ANYANG ROAD

100m

TIANJIN 117 BUILDING H=596.5m 117FLOOR

FULI GUANGDONG BUILDING H=480m 91FLOOR

TIANJIN MODERN CITY PHASE II H=339.6m

The land red line area is a trapezoid with an area of 11735.4m2,with four entrances and exits, adjacent to the main road in the East and south.

The West and South entrances of the building were the main entrances, and the East and North entrances were the secondary entrances. The streamline of the business area on the groundfloor was arranged through four entrances.

We used subtraction to carved out the outline of the building and made the architectural courtyard and patio.

Then we added the tower on the basis of the original ground business and divided the business type of the whole building.

TIANJIN YUJIABAO NORD FINANCIAL CENTER H=300m

TIANJIN PING AN TEDA INTERNATIONAL FINANCIAL Center H=313m

XIANGLUO BAY SKYLINE TEXTURE :

BISHUI MANOR

GREENING VEGETATION

TIANJIN RADIO AND TELEVISION TOWER H=415.2m 6th HIGHEST IN ASIA

500m

WANSHUN R

COUNTT Y GARDE N TYIANYU GARDEN

WA NN IAN QIA ON OR TH RO AD

TIANJIN

STATION

TIANJIN CHOW TAI FOOK FINABCIAL CENTER H=530m 103FLOOR

OPENING BRIDGE

CHINA

ARCHITECTURAL TEXTURE

ANALYSIS OF URBAN SKYLINE IN TIANJIN AREA AND BINHAI NEW AREA : 700m

QINGSH ENG R OAD

PATTERN OF ROAD DISTRIBUTION

GUEST-M EETING AVENUE

N

TIANJIN AVENUE 5KM

CULTURAL TOURISM

BINHAI NEW AREA WATER AREA

SURROUNDING ENVIRONMENT,RELATIONSHIP BETWEEN POPULATION AND BASE : I lived in Bishui manor. There was an open space in the north of our house. I hoped a high-rise commercial comprehensive office building could be built there, so that I could change jobs to worked near my home without worrying about the rush hour traffic jam in the morning and evening, and I didn't have to worry about going to the company late.

The base was located in Xiangluowan Business District of Binhai New Area, with developed transportation. It faced the main road in the east of Henan. The surrounding supporting facilities were complete, but it was sparsely populated and lacked buildings for cultural and recreational activities.

10KM

CONCEPT GENERATION: SING SONG

COMMERICAL COMPLEX

WORED WITH COLLEAGUES

It could be seen from the above figure that the storey height of the top ten high-rise buildings in Tianjin was higher than that in Binhai New Area; At present, the maximum storey height of the high-rise buildings in Binhai New Area was close to 200m. According to the comparison of various parties, the high-rise buildings I designed should be the 11th high-rise building in Tianjin and the first high-rise building in Xiangluo Bay, with a storey height of more than 200m.

TASKEDASSIGNED BY THE BOSS

I hoped there was a high-rise commercial complex near my home, so it was much more convenient for me to buy vegetables and cook after work, and I could go shopping on weekends.

MEET CUSTOMERS

WENT TO WORK IN COMPANY

HAVE AFTERNOON TEA

TOOK THE CHILD TO INTEREST CLASSES PICK UP CHILDREN TO INTEREST CLASSES

SOCIAL ENGAGEMENT

WENT TO THE BAR I moved here five years ago. Ten years ago, when Xiangluowan economic zone was just established, it was still a large wasteland. Within five years, high-rise buildings have sprung up. However, there is still huge room for development.

+

=

TOOK DANCE LESSONS SHOPPING

TOOK A REST

+ ADAPTION TO LOCAL CONDITION

COBBLESTONE

30°

SUSPENTION TOWER

15°

+

+

RICH LIFESTYLE

PLANTING ROOF

30°

=

PLAY MUSIC If only there was a comprehensive high-rise commercial office building near my home, so that I could have a place to do my homework when my parents were busy.

15°

PLANTING ROOF COBBLESTONE WAVE The building I designed extracted architectural symbols from pebbles, conch, bay, waves and suspention tower, and designed according to local conditions, combined with planting roof.

We used subtraction to insert balconies and added cantilevered eaves in the current building.

Finally, we reverse the tower according to the design concept and divided building formats, add interest to the building, and add planting roof to realize the concept of reducing energy consumption.


N

1st FLOOR PLAN

5th FLOOR PLAN

2nd-3rd FLOOR PLAN

4th FLOOR PLAN

STANDARD FLOOR PLAN 1#

STANDARD FLOOR PLAN 2#

STANDARD FLOOR PLAN 3#

STANDARD FLOOR PLAN 4#

STANDARD FLOOR PLAN 5#

STANDARD FLOOR PLAN 6#


CROSS-SECTIONAL:

PERSPECTIVE 257.400

257.400

GARDEN

CLUB BAR

STUDIO

191.100

191.100

OFFICE

159.900

159.900

FITNESS CENTRE

BABER SHOP BEAUTY SALON

144.300 CLUB&BAR CONNCETED WITH THE ROOF GARDEN,IT PROVIDED A BROADER VISION AND RELAXED THE BUSY BODY AND MIND 113.100

STUDIO

OFFICE

BRPG SHOP

STUDIO CNFERENCE

97.500

INTERNET BAR

MICRO RETAIL

97.500

50.700

19.500

3.900

PLANTING ROOFS ENERGY CONSERVATION AND EMISSION REDUCTION TOIMPROVE THE QUALITY OF LIFE

OFFICE

97.500

66.300

144.300

HIGH-PERFORMANCE FACADE GLASS-INTEGRATED PHOTOVOLTAICS DECREASES ENERGY USAGE AND INCREASES EFFICIENCY OFFSET COSTS

BRPG SHOP FITNESS CENTRE

97.500

OPEN OFFICE IMPROVED WORK EFFICIENY AND PROMOTED COMMUNICATION WITH COLLEAGUES AND SUPERIORS

OFFICE GARDEN

AND CANTEENS ELECTRONIC GELLERY OPEN-AIR CAFE RESTAURANT COFFEE SHOP DESSERT SHOP CLUB COSMETIC OUTLET FLAGSHIP STORE COMMERICAL SPACE LOBBY

97.500

97.500

STUDIO

OFFICE

113.100

66.300

50.700

19.500

3.900

MAIN LOBBY SUPERMARKET

NODE PERSPECTIVE 1

NODE PERSPECTIVE 2

NODE PERSPECTIVE 3

NODE PERSPECTIVE 4


THANK YOU