John Graham Professional Portfolio 2013 - Present

© IRIS22 Productions


John Graham, AIA https://issuu.com/johngraham0/docs/jgraham_portfolio_2018 https://www.linkedin.com/in/john-graham-78b72258/ (515) 509-9646 jcgraham07@gmail.com For the past 5 years, the focus of my work has been split between education, healthcare, restoration, and wellness & recreation projects. Because of this broad knowledge base, I bring a multi-faceted, multidisciplinary approach to each project. I believe my ability to listen, learn, and collaborate will make me an invaluable member of your team.

EDUCATION

Iowa State University, Ames, IA 2007-2012 Bachelors of Architecture Cum Laude, 3.6 GPA Study Abroad Rome Program Spring 2011

PROFICIENCY REVIT AutoCAD Adobe Photoshop Adobe Illustrator Adobe InDesign Microsoft Word Microsoft Excel Microsoft Powerpoint

SketchUp Bluebeam Newforma Submittal Exchange Procore Enscape Autodesk Cloud Microsoft OneNote

CREDENTIALS Licensed Architect, State of CO #ARC.00405263 Licensed Architect, State of IA #07260 NCARB Certificate #706688 AIA National, Active Member #30512795 AIA Iowa, Active Member FAA Small UAS Remote Pilot License

WORK EXPERIENCE

Project Architect, Stockholder, RDG Planning & Design July 2016 – Present • Design & project architect for 48 unit independent living apartment and 80,000 SF new wellness & recreation project in excess of $18M construction cost • Independently executed master plan studies, facilitated programming and information-gathering meetings with Des Moines Public Schools • Managed construction administration phase throughout all aspects of communications, including submittals, RFI’s, ASI’s, change orders, field observations, OAC meetings, and punch list reports • Served as consultant coordinator for Brookestone Gardens Senior Living facility in Kearney, NE. Worked with Civil, Landscape, Structural, MEP, and Kitchen consultants to solve coordination issues and facilitate communication • Created cover letters, budget analyses, and project schedules for multiple proposals • Served as an interviewer and design/technical assessor of 3 candidates for project architect positions

Intern Architect, RDG Planning & Design June 2013 - July 2016 • Independently performed design development, construction documentation, and contract administration for a 10,000 SF Dowling High School Administration Remodel project of $2M cost with an aggressive 75 day construction schedule • Performed building code analyses on educational and healthcare project types, met with State of Iowa Building Code Bureau and City of West Des Moines officials • Assisted design and documentation and BIM modeling of multiple education, healthcare, restoration, and wellness & recreation projects using Revit and Sketchup

Contract Design Associate, RDG Planning & Design February 2013 - June 2013 • Worked alongside project architects to redline and manage office standard details in Revit • Assisted design and documentation and BIM modeling of multiple education, healthcare, restoration, and wellness & recreation projects using Revit and Sketchup

NON-PROFIT WORK

Administrator, Communities by Faith January 2012 – July 2013

• Raised over $10,000 for the construction of homes in Nicaragua • Facilitated meetings and legal contracts with umbrella non-profit organization, Go InterNational • Co-led design & construction of 2 precast concrete homes in Managua and Masaya, Nicaragua

ADDITIONAL SKILLS & EXPERTISE • Interior Architecture • Exterior envelope design & detailing • Revit/BIM model manager

• Application of IBC, NFPA Life Safety Code, ADA • Digital Rendering, 3D panoramas, VR Walkthroughs • Sustainable Design Practices


SELECTED WORKS

© IRIS22 Productions

03

St. Ambrose University Wellness & Recreation Center Humboldt

Davenport, IA

13

County Memorial Hospital

Humboldt, IA

17

Coachlight Plaza Clinic & Spa

West Des Moines, IA

23

Dowling Catholic High School Administration Remodel

West Des Moines, IA

27

Northcrest Community Repositioning

Ames, IA


St. Ambrose University Wellness & Recreation Center - $18.5 M Davenport, IA 2015-2017 Primary Role: Project & Design Architect Primary Tasks: Programming, Exterior Design, Interior Architecture, Construction Administration, BIM Model Management Involvement: Programming - CA Size: 80,000 SF Addition, 17,000 SF Renovation Team: Jack Patton, Marty Miller, Dusica Stankovic

6

6 7

6

4

8

10

5

7 9

5 7

1

1

Level 1 Floor Plan

Š AJ Brown Imaging


3

3 3

8

1 Weight/Cardio Room 2 Multipurpose Room

3

3 Classroom

3

4 Fieldhouse 1

9

5 Offices 2

6

5

6 Storage 7 Lockers

1

8 ExistingGymnasium 9 Lobby 10 Hall of Fame

Level 2 Floor Plan

Project Brief The St. Ambrose University Wellness & Recreation Center was the largest single building project in school history. The 3 groups of users for this space include University Athletics, Campus Recreation and Kinesiology Departments. It was important to create a space where these 3 “roommates� could effectively utilize a building conceived as a space for overall wellness. Through use of color, space, and finestration, this building creates an atmosphere capable of facilitating exercise and growth for spirit, soul, and body.

2


Design Process The exterior design developed around the idea of a transparent connector between two massive blocks. The visible commons area would act as the transition piece between old and new construction. By hand-sketching various iterations of exterior facade treatment, as well as quick schematic Sketchup modeling, the design team began to develop a dialogue with the owner about the exterior aesthetic of the building. In a similar way on the interior, we began by working with shapes, forms, and colors which alluded to the St. Ambrose mascot, “The Fighting Bees�. Shown on the following pages are initial images representing materiality and branding opportunities present in this unique space.

3

Hand-rendered Exterior Facade Studies Design Development


Exterior Massing/ Material Studies Schematic Design SketchUp

Exterior Elevation - South Construction Documents Revit

4


5 Interior Rendering for client meeting Design Development SketchUp

Control Desk Plan and Millwork Sections Construction Documents Revit


6

Š IRIS22 Productions

Control Desk Design One of the first things seen when entering the building is the control desk, and it serves an important function as a sign-in point for the students. The interior architectural elements were based on the integration of school colors, hexagon theme and dramatic lighting.


Hall of Fame Display Elevation and Sections Construction Documents Revit

7

Interior rendering for client meeting Design Development SketchUp


8

© AJ Brown Imaging


9

Main Stair Plan, Sections, and Details Construction Documents Revit


10

© IRIS22 Productions


11

© IRIS22 Productions


12

© IRIS22 Productions


Humbold County Memorial Hospital - $13.2 M Humboldt, IA 2016-Present Primary Role: Intern Architect Primary Task(s): Exterior design, exterior detailing and renderings, BIM Model Management & Consultant Coordination Involvement: DD - CD Size: 37,740 SF Addition, 4,864 SF Remodel Team: Dusica Stankovic, Gary Enerson, Libby Funke

13


Level 1 Floor Plan

Level 2 Floor Plan

5 1 11 7

6

10

1

6

1

10 1

10

2

2

11

2

2

11

9

11

14

2

3 3

3

3

9

11

9

UP

8

4

12

Project Brief The Humboldt County Memorial Hospital Project involves the addition of a 2-story medical clinic to dramatically increase the health care services provided for the area. The program includes a renovated registration suite, multiple outpatient exam rooms, Physical Therapy, and Rehabilitiation. Exterior design was influenced by a natural material palette and complements the existing hospital building’s predominantly blonde brick facade.

12

1 Reception

7 Coffee Shop

2 Exam Room

8 Mechanical

3 Nurse/Work Station

9 Gym/ Rehab

4 Provider Office

10 Conference

5 Registration

11 Specialized Care

6 Waiting Room

12 Staff Lounge


15

Wall Sections & Details, Exterior Elevation Construction Documents Revit


16

Section Perspective Renderings Revit + Enscape


Level 1 Floor Plan

3

FD

3

FD

3

FD

5

FD

FD FD

FD

FD FD

FD

FD FD

6

FD

9

3

FD

4

FD

4

FD FD

FD FD

7

5

8 8

7

2

2

2

2 FD

FD

1

1 Lobby 17

2 Waiting 3 Nurse/Shared Work Station 4 Locker Room

10

5 Treatment 6 Operating Room 7 Minor Procedure 8 Consult 9 Break Room 10 Shell Space

Project Brief The Coachlight Plaza Spa & Clinic is a 12,000 SF full service Spa and Cosmetic Surgery center located in a thriving area of West Des Moines. The interior and exterior was designed to evoke the feel of luxury and elegance. Based on concepts from high-end boutique shops from Rodeo Drive in Beverly Hills, the facade adheres to the local PUD requirements, while still providing a look of refinement. Unique design features include the limestone facade of the curved entry and the spiral cool-down showers in the men’s and women’s locker rooms.

© Jacob Sharp Photo


Coachlight Plaza Spa & Clinic - $8.7M West Des Moines, IA 2015-2017 Primary Role: Intern Architect Primary Task(s): Schematic Design, Programming, BIM Model Management, Renderings, 3D printing, Construction Administration Involvement: SD - CD Size: 20,000 SF Team: Dusica Stankovic, Gary Enerson

18


Exterior Renderings City Planning & Zoning Submittal Revit + Photoshop

Follow-up DMPS Patient 10' x 10' 100 sf

Pre-Op Room DMPS Patient 10' x 10' 100 sf

Post-Op PH1 DMPS Patient 10' x 10' 100 sf

Consult - Skin Care HSLC Patient 10' x 12' 120 sf

Injectable HSLC Patient 10' x 12' 120 sf

Shared Work Office - Manger Office - Manger Staff Staff Staff 9' x 10' 8' x 10' 9' x 10' 90 sf 80 sf 90 sf

Storage Staff 12' x 12' 144 sf

Retail HSLC Public 8' x 7' 56 sf

Toilet 80 sf (56 sf)

Janitor 48 sf (56 sf)

Operating Room DMPS Patient 18' x 18' 324 sf

Shared Work Room 224 sf (80 sf)

Office - Dr. Robbins 168 sf (168 sf)

Laundry/Clean/Dirty Storage 336 sf (250 sf)

Operating Room 472 sf (324 sf)

Soiled Staff 10' x 6' 60 sf

Treatment Prep Staff 12' x 12' 144 sf

Laundry/Clean/Dirty Storage Staff 20' x 12' 250 sf

Laser Tatoo Removal 168 sf (168 sf)

Nurse 80 sf (100 sf)

Post-Op 110 sf (100 sf)

Corridor

Post-Op 110 sf (100 sf)

Toilet 80 sf (56 sf)

Treatment Prep 154 sf (144 sf)

Breakroom Staff 252 sf (252 sf)

Vectra 3D 64 sf (56 sf)

Corridor

Corridor

Office - Manger Office - Manger 90 sf 90 sf (90 sf) (90 sf)

IT Room 80 sf (40 sf)

Follow-up 100 sf (100 sf)

Consult 168 sf (168 sf)

Minor Procedure 168 sf (168 sf)

Neograft 144 sf (144 sf)

Treatment - Massage/ Facial 144 sf (144 sf)

Locker Supplies 60 sf (60 sf)

Cool Sculpt 154 sf (144 sf)

Reception 112 sf (100 sf)

Patient Toilet 96 sf (56 sf)

Waiting 360 sf (300 sf)

Copy Room 64 sf (78 sf)

Reception 112 sf (100 sf) Waiting/Retail 416 sf (300 sf)

Sub-waiting 240 sf (150 sf)

Relaxation Lounge 416 sf (300 sf)

Treatment - Facial 144 sf (144 sf)

Cool Sculpt 154 sf (144 sf)

Photo 96 sf (56 sf)

Lobby 1184 sf

Program & Adjacency Diagram Programming & Schematic Design Revit

Programming & Exterior Design Development Uncommon to our firm, the program of this facility lead to many in-depth discussions regarding adjacencies and functionality. These design sessions were conducted with a specialized consultant to understand the levels of finish required throughout the building, and especially in the spa areas. The combination of spa and clinic spaces also required an intentional separation between public and private space, as well as confidentiality and independent separation for clients of either functions. The entry of the building developed from the idea of a curved mass wall feature that was “sculpted” to allow various penetrations and voids into the building. This gradually developed an entry piece that allowed more light into the space while still maintaining a monolithic aesthetic.

Vestibule 120 sf

Tennant 1 1616 sf

Tennant 2 1344 sf

Tennant 3 3136 sf

Treatment - Facial 144 sf (144 sf)

Corridor

Storage 144 sf (144 sf)

Injectable 120 sf (120 sf)

Corridor

Consult 144 sf (144 sf)

Treatment - Facial 144 sf (144 sf)

Treatment - Massage 120 sf (120 sf)

Treatment - Massage 240 sf (240 sf)

Treatment Body/Massage 192 sf (180 sf)

Corridor

Consult 168 sf (168 sf)

Family Waiting 192 sf (120 sf)

Laser Hair Removal/ Treatment - Massage 168 sf (144 sf)

Mens's Lockers 880 sf (800 sf)

Women's Lockers 1296 sf (1200) sf

Vestibule 48 sf

Follow-up Waiting 144 sf

Sciton Laser 168 sf (168 sf)

Corridor

Pre-Op Room 100 sf (100 sf)

Photo 60 sf (56 sf)

Sciton Laser 168 sf (168 sf)

Staff Tooilet/Change 80 sf (70 sf)

Lockers

Clean Supply Staff 10' x 8' 80 sf

Shared Work Room 322 sf (360 sf)

Closets 32sf (10 sf)

Sterile Storage 200 sf (180 sf)

Toilet 48 sf (56 sf)

Shared Work Room Staff 30' x 12' 360 sf

Breakroom Staff 21' x 12' 252 sf

Office - Dr. Robbins Staff 14' x 12' 168 sf

Family Waiting DMPS Public 10' x 12' 120 sf

Post-Op PH2 DMPS Patient 10' x 10' 100 sf

Treatment Treatment Facial/Exills/Chemical Facial/Exills/Chemical Peels Peels HSLC Patient HSLC Patient Photo Room Patient Toilet Patient Toilet Vectra 3D 12' x 12' 12' x 12' DMPS Patient DMPS Patient DMPS Patient DMPS Patient 144 sf 144 sf 8' x 7' 8' x 7' 8' x 7' 8' x 7' 56 sf 56 sf 56 sf 56 sf

Consult - Visla HSLC Patient 12' x 12' 144 sf

Minor Procedure DMPS Patient 14' x 12' 168 sf

Neograft DMPS Patient 12' x 12' 144 sf

Soiled 96 sf (60 sf)

Clean Supply 96 sf (80 sf)

Utility 64 sf

Sterile Storage Staff 10' x 18' 180 sf

Relaxation Lounge HSLC Patient 24' x 12' 300 sf

Treatment Massage/Facial HSLC Patient 12' x 12' 144 sf

Sciton Laser Resurfacing HSLC Patient 14' x 12' 168 sf

Consult DMPS Patient 14' x 12' 168 sf

Trash Holding 64 sf (40 sf)

Utility 128 sf

Vestibule 60 sf

Patient Discharge DMPS Patient 10' x 6' 60 sf

Private Treatment Massage w/ Wirlpool HSLC Patient 20' x 12' 240 sf

Sciton Laser Resurfacing HSLC Patient 14' x 12' 168 sf

Consult DMPS Patient 14' x 12' 168 sf

Lobby/Waiting HSLC Public 20' x 15' 300 sf

Staff Locker Staff 10' x 7' 70 sf

Laser Tatoo Removal HSLC Patient 14' x 12' 168 sf

Lobby/Waiting DMPS Public 20' x 15' 300 sf

Sub-waiting HSLC Public 15' x 10' 150 sf

Copy Room Staff 12' x 6.5' 78 sf Locker Supplies Staff 10' x 6' 60 sf Closets - 10 sf

Maint./Utility 80 sf

Treatment Massage/Dry HSLC Patient 10' x 12' 120 sf

Laser Hair Removal HSLC Patient 12' x 12' 144 sf

Reception - HSLC Public 20' x 5' 100 sf

Staff Locker Staff 10' x 7' 70 sf

A05.01 A09.08

IT Room - 40 sf

A4 3

Cool Sculpting HSLC Patient 12' x 12' 144 sf

Photo Room HSLC Patient 8' x 7' 56 sf

Treatment Body/Massage HSLC Patient 15' x 12' 180 sf

Injectable HSLC Patient 10' x 12' 120 sf

19

Cool Sculpting HSLC Patient 12' x 12' 144 sf

Guest Toilet HSLC Patient 8' x 7' 56 sf

Treatment Facial/Exills/Chemical Peels HSLC Patient 12' x 12' 144 sf

Mens's Lockers Lounge, Grooming, Toilets, Shower, Steam Rooms, Sauna HSLC Patient 33' x 24' 800 sf

Janitor Staff 8' x 7' 56 sf Trash Holding 8' x 5' 40 sf

Reception - DMPS Public 20' x 5' 100 sf Women's Lockers Lounge, Grooming, Toilets, Shower, Steam Rooms, Sauna, Feature Whirlpool HSLC Patient 50' x 24' 1200 sf

Consult 120 sf (120 sf)

Injectable 120 sf (120 sf)


20

Entry Design Studies Schematic Design Revit

Exterior Design Schematic Design Revit


21

Enlarged Floor Plan, Elevation and Perspective Construction Documents Revit

3D-Printed Study Model Design Development SketchUp + Makerbot


22

© Jacob Sharp Photo


Dowling Catholic High School - Administration Renovation - $2.1 M West Des Moines, IA 2014-2015 Primary Role: Intern Architect/ Project Architect Primary Tasks: Code Analysis, Interior Architecture, Documentation & Construction Administration Involvement: DD - CA Size: 10,200 SF Renovation Team: Phil Hodgin

23


24

Code Plan Construction Documents Revit

Project Brief The Dowling Catholic High School Administration Renovation was the final phase of the school’s “We Believe” capital campaign and involved 10,200 SF of renovation that included staff offices, reception areas, nurse office, conference rooms, as well as staff break and work rooms. This project was tasked with an agressive 75-day construction schedule which allowed for the entire job to be completed over the summer break. The speed and communication between the contractor and design team on this remodel earned a nomination for a Master Builder’s of Iowa Award.

Corridor prior to renovation


25

Interior Office Suite Corridor

Building & Wall Section, Interior Elevation Construction Documents Revit


26


27

Northcrest Community Independent Living - $8M Ames, IA 2017-Present Primary Role: Project Architect/ Design Architect Primary Tasks: Exterior Design, Code Analysis, Detailing, Documentation, Client Meetings, Exterior & Interior Renderings Involvement: SD - DD Size: 92,388 SF IL Building, 191,062 SF Total Campus Budget: $36 M for entire campus


2 2

3

2 1

1 Garage

2 2

2 Storage 3 Trash

2

4 Sitting Area 5 Living Unit 6

6

5

5

6

6

4 4

6

3

5

5

5 5

6

6 Sunroom

5 5 6

5 6

6

5 6

Project Brief The Northcrest Community Repositioning Project is a more than 190,000 SF expansion to an existing Senior Living Facility in Ames, IA. The program consists of Skilled Nursing, Assisted Living, Independent Living, and a multipurpose facility with dining capabilities. Since it’s inception in the 1960’s, the existing campus has been known for it’s unique architectural appearance, which has become a major marketing strategy for Northcrest’s directors. It is the owner’s directive that the new buildings match the existing character of campus, while responding appropriately to the new program. The Independent Living Building’s undulating facade and sloped roofs refer to the original architecture on campus.

6

Existing Campus Image

6

28


Site Perspective Schematic Design Revit + Sketchup

29

Existing Campus Images

Exterior Design Process While examining the existing campus and looking for design cues that our building should mirror, the design team identified 5 design guidelines which would maintain continuity throughout campus. These were: 1. Maintain a brick datum line across the first level of all buildings 2. Emulate the ratio of window openings to facade 3. Integrate shed roofs and clerestory windows 4. Match the vertical lines and materiality which are prevalent on campus 5. Create solid/ void spaces on the exterior facade During schematic design pricing excercises, it was determined that the 2 separate Independent Living Apartments could be combined to save approximately $2.1M. This resulted in a larger, 4 story 48 Unit IL building.

18 Unit Facade Studies Schematic Design Sketchup


18 Unit Schematic Building Section Schematic Design Revit + Photoshop

18 Unit Perspective Schematic Design Revit + Enscape

30


31

Overall Campus Renderings Schematic Design Revit + Enscape

48 Unit Perspective Rendering from SW Design Development Revit + Enscape


32


PROJECTS COMPLETED + ACTIVE PROJECTS Adel Main Street - Facade Rehabilitation - Adel, IA

HyVee LEED Documentation - Various Locations

Albia Community School District - High School Career Academy - Albia, IA

• Ankeny, IA

Ames Community School District - Ames, IA

• Madison, WI

• Meeker Elementary

• Sioux City, IA

• Miller Elementary

• Bloomington, IL

• Mitchell Elementary

• Olathe, KS

• Fellows Elementary

• Springfield, IL

Brookestone Gardens Senior Living - Kearney, NE

• Fitchburg, WI

Burlington School District - Burlington, IA

• Plattsmouth, NE

• Culinary Arts

• Waukee, IA

• High School Master Plan

• Kearney, NE

Capital Square - Cowles Commons - Des Moines, IA

• Rochester, MN

Carlisle Main Street - Facade Rehabilitation - Carlisle, IA

Ida Grove Main Street - Facade Rehabilitation - Ida Grove, IA

Cass County Memorial Hospital - Atlantic, IA

Marshalltown Community School District - Marshalltown, IA

Central College - Kuyper Athletic Complex - Pella, IA

• High School Roundhouse Renovations

City of Grimes - City Hall Interior Improvements - Grimes, IA

• Practice Gym and Wrestling Room - Phase II

Coachlight Plaza Spa & Clinic - Des Moines, IA

Mid American Energy Office Remodel - Davenport, IA

Des Moines Public Schools - Des Moines, IA

Montezuma Main Street - Facade Rehabilitation - Montezuma, IA

• Central Campus

Northcrest Community Repositioning - Ames, IA

• Career and Technology Center Remodel-Phase 4

Omaha Public Schools - Gateway Early Childhood Education - Omaha, NE

• Central Campus Agronomy Assessment Master Plan

Omaha Public Schools - Skinner Early Childhood Education - Omaha, NE

Dowling Catholic High School - West Des Moines, IA

University of Oregon - Student Recreational Center - Eugene, OR

• Chapel

University of Florida - Football Operations Planning - Gainesville, FL

• Admin Renovation

St. Ambrose University - Wellness and Recreation Center - Davenport, IA

English Valley Community School District - Competition Gym - English Valley, IA

Storm Lake Main Street - Facade Rehabilitation - Storm Lake, IA

Grimes Main Street - Facade Rehabilitation - Grimes, IA

Stuart Main Street - Facade Rehabilitation - Stuart, IA

Grinnell Main Street - Facade Rehabilitation - Grinnell, IA

Western Technical College - Performance Planning - LaCrosse, WI

Guthrie Center Main Street - Facade Rehabilitation - Guthrie Center, IA

Profile for John Graham

John Graham Portfolio 2018  

Professional work samples by John Graham, AIA

John Graham Portfolio 2018  

Professional work samples by John Graham, AIA