Issuu on Google+

NAME: Jinsu Lee ASSIGNED CASE STUDY: ON SITE GROUP MEMBERS: Studio 12

1_EASTERN PRECINT STUDENT CENTRE (LINK BETWEEN BUILDINGS) Potential construction constraints - Limited space -Difficulty of transport materials (stairs, narrow path) Links to other buildings -ERC centre and DougMcDonell Building Construction type

-Prefabricated -Glass and steel frame apply on the roof of the building also timber frame apply some part of roof. -Curtain wall apply at the entrance of the building. -High ceiling Structural System(s) -Steel Frame, Timber Frame, Curtain wall. Materials -Steel, Glass, Concrete, Timber Other relevant comments -Large amount of lights come into the building.


2_MSLE BUILDING (LINK BETWEEN BUILDINGS)

Potential construction constraints - Limited space Links to other building -MSLE Building and Labs Construction type

-Prefabricated ( Exterior structure) -Cantilever structure is used on the bridge -Applying bridge in order to access both building in 2nd level. -Rubber is used for finishing floor and baseboard. Structural System(s) - Cantilever, Steel Frame, Curtain wall Material -Zinc, Rubber, Steel, Timber, Glass, Cement. Other relevant comments -The space is really small but applying cantilever structure to allow experiencing wide space in the building.


3_QUEENS COLLEGE EXTENTION

Potential construction constraints -Wether (especially rain) -Narrow path to transport materials Links to other buildings -QUEENS COLLAGE LABORATORY Construction type

-Prefabricated -Precast concrete is applied for exterior wall of the building. -Concrete floor Structural System(s) -Mass structure -Cantilever Materials -Precast concrete, Steel, Glass brick, Steel, PVC Other relevant comments - The buildings is not harmonised with existing one because of the material (concrete).


4_ORMOND THEOLOGY CENTRE RECEPTION Potential construction constraints -Nose control due to linking with library building Links to other buildings -The McCaughey Library Construction type

-Prefabricated -The facade of the building design with punched copperplate Structural System(s) -Curtain wall -Steel frame -Mass (glass brick wall) Materials -Reinforced concrete, In SITU concrete, Glass brick, Timber, PVC, Copperplate Other relevant comments -Especially in summer, light through the glass brick make inside of the reception temperature warm. -Obtain light through glass brick wall


5. OVAL PAVILION - From work of IN-SITU concret. - Reinforce Concrete can stand 'COMPRESSION' and 'TENSION'. - Concrete is adptable material.

-Concrete is composed by the aggregate, the cement, water and the certain size of graval.

-The concrete stems are under the house in order to prevent collapse the house because it is built by mainly timber and preserve a heritage building.


On site