Canal de colombia andm

Page 52

4. International Bidding (Serrania Baudó Laser Cutting) 5. International Tender for the 3 channel ports: a. Santa María del Darien b. Curiche c. Rio Sucio 6. a. Dredge river sand and fill banks to 6 meters high up the level of each port of the river or the sea. b. Dredge the river current Truando to flip 180 degrees to the side of the Pacific Ocean. Using confiscated dredges c. Central Dam Tide Itangui to generate electricity in Jurado (Canada or Korea) 7. Close 11 caños, leaving only the Caño Roto. 8. Each port must have: a. Electricity b. Drinking water c. Refrigeration and Air Conditioning d. Septic Tanks and Aqueduct e. Deposits f. Maintenance Workshops g. Cooperative, restaurants, cafes. h. Hospital (60 beds, surgery, orthopedics, pediatrics, obstetrics, pharmacy, telepresence) i. Laundries j. Two way electric train. Riel 60 Kgm, concrete sleepers, covered with polyurethane and welded rails. k. Housing (initially: boat hotel) l. Cement Factory m. Airport on each port


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.