GHANA DESIGN/BUILD DESIGN SELECTION with COMMUNITY + WORKERS


TABLE OF CONTENTS XXI CENTURY LIVING 4 Urban Design | SCAD 2016 GALLERY + STUDIO ADDITION 20 Architecture | Miami University 2015 VILLAGE GUEST HOUSE 38 Architecture | Miami University 2014 OVER-THE-RHINE CO-HOUSING 44 Architecture | Miami University 2015 SPRING STREET COMPLETE STREET 50 Urban Planning | Miami University 2015 GATEWAY TO AMERICANA 54 Urban Planning | Miami University 2016 PROFESSIONAL WORK 62 Architecture | ANF Summer 2015 + 2016


XXI CENTURY LIVING The Historic District of Savannah is an epicenter of entertainment, recreation, residence, and tourism. Yamacraw Village is directly adjacent yet is a center for low-income housing, crime, and low density. This Urban Design studio placed emphasis on envisioning what Savannah could become by examining the current conditions of Yamacraw Village. The studio also placed emphasis on exploring twenty-first century living principles.

4

XXI CENTURY LIVING


PROJECT TEAM Jessica Moelsein + Adrianna Colon LOCATION Savannah, GA, United States DURATION Fall 2016 | 10 Weeks MENTOR Arpad Ronaszegi TYPE Urban Design CONCEPT

After heavy analysis of the current conditions, it was concluded that Martin Luther King Jr. Boulevard is a strong divider between Yamacraw Village and Savannah’s Historic District. The final design lends to break the barrier and integrate both aspects of the city. The design aims to break the barriers between “social class” and promote full urban living; which is defined as a completely walkable community that relies on public transportation, a sustainable urban agricultural system, and mixed use spread amongst the entire area.

6

XXI CENTURY LIVING

N


INITIAL VISION FOR GATHERING Gathering Space Landmark

Mixed Use Streetscape

Pedestrian Street

8

XXI CENTURY LIVING


INITIAL VISION FOR HOUSING Sustainable Buildings Vertical Farming

Micro Apartments

Multi-generational Housing

XXI CENTURY LIVING

9


INITIAL VISION FOR RECREATION

Vertical Farming

Bike + Pedestrian Path Recreation On The Canal

10

XXI CENTURY LIVING


INITIAL VISION FOR LIVING SELL/BUY Community Identity

GROW Savannah River Canal

2100 Urban Agriculture

Reduce Car Use 2, 324, 147 sq. ft.

EAT E Bay

Community Work/ Responsabilities

St

1 acre: 43,580 sq. ft. 18% E Ogl

etho

Organic Farming

rpe Av

e

E Libe

rty St

E Libe

rty S

XXI CENTURY LIVING

11


1/4 Mile = 3 Minute Walk

1/2 Mile = 8 Minute Walk

Mixed Use

Mixed Use

Residential

Residential

Nature

Nature Water

Water 1/4 Mile = 3 Minute Walk

Culture/Civic

Culture/Civic

Transit Hub

Transit Hub

Public Transportation

Public Transportation

Pedestrian Street

Pedestrian Street

Existing Buildings

Existing Buildings 1/2 Mile = 8 Minute Walk

Mixed Use Residential

Nature Water

Culture/Civic Transit Hub

XXI CENTURY LIVING

13


60’-0”

70’-0”

40’-0”

16’-0”

102’-0”

22’-0”

EAST-WESTSECTION | TRANSPORTATION HUB

14’-0”

14

60’-0”

XXI CENTURY LIVING

350’-0”

60’-0”


NORTH-SOUTHSECTIONS | BROUGHTON STREET

60’-0”

70’-0”

40’-0”

16’-0”

102’-0”

22’-0”

XXI CENTURY LIVING

15


40’-0” 40’-0”

East Section

Blow-Up Partial Plan

West Section

60’-0” 60’-0”

14’-0” 14’-0” 20’-0” 20’-0”

353’-0” 353’-0”

20’-0” 20’-0”

14’-0” 14’-0”

325’-0” 325’-0”

North Section

Blow-Up Section 360’

90’

’ 90’

45’

180’

60’-0” 60’-0”


MLK JR. BLVD. PEDESTRIAN + TRANSPORTATION STREET


MARKET + RIVER STREET CONTINUATION


GALLERY + STUDIO ADDITION DURATION 6 Weeks Glenn Murcutt designed and completed the Ball-Eastaway home for artists Lynn Eastaway and Sydney Ball in 1983. The energy efficient home was designed to leave a minimum footprint while serving as an artist’s retreat within the Australian landscape. The house is situated on a site with a steep decline. The Ball-Eastaway’s position is site-specific, with controlled views from its ‘meditation decks’ and strategically placed windows. The six-week project sought to distinguish the definition of complementary versus similar through the design of two separate additions. The program for the addition consists of an intimate yet flexible studio space, gallery, kitchenette, and restroom.

20

GALLERY + STUDIO ADDITION


GALLERY + STUDIO ADDITION | COMPLEMENTARY


SIMILAR LOCATION Glenorie, Australia MENTOR Professor Tom Dutton CONCEPT The similar addition responds to the natural contour within the existing landscape, which also parallels the entrance ramp to the Ball-Eastaway home. The overhead beams elongate the breezeway and mimic the joists that support the main home. The large, overhanging flat roof emphasizes the outdoor gallery space and veranda, alluding to the meditation spaces that Murcutt intended in the main house. The addition is positioned on tubular columns to remain consistent with the Ball-Eastaway’s lightweight composure. The tubular columns remain within the same integrated grid system as the main house.

22

GALLERY + STUDIO ADDITION | SIMILAR

CONCEPTDIAGRAM


N


24

GALLERY + STUDIO ADDITION | SIMILAR


26

GALLERY + STUDIO ADDITION | SIMILAR


28

GALLERY + STUDIO ADDITION | SIMILAR


SOUTH-EASTELEVATION


COMPLEMENTARY LOCATION Glenorie, Australia MENTOR Professor Tom Dutton CONCEPT The complementary addition includes aspects of the curved roof structure within the plan. The main house and addition serve as appendages to the “spine” of the Ball-Eastaway home the main curve wall. The main focus of the “spine” is to serve as a course for circulation along the curved wall, allowing passage between the main house and the addition. The addition is constructed of similar materials as the main house - corrugated sheet metal, tubular steel, and wood-frame construction covered with plaster. The complementary design still alludes to Murcutt’s original concept of lightly touching the landscape and feathering of the wooden platforms because of its slow trickle to the edge of the curved wall. 30

GALLERY + STUDIO ADDITION | COMPLEMENTARY

CONCEPTDIAGRAM


N


32

GALLERY + STUDIO ADDITION | COMPLEMENTARY


34

GALLERY + STUDIO ADDITION | COMPLEMENTARY


NORTH-WESTELEVATION


GALLERY + STUDIO ADDITION | COMPLEMENTARY

37


VILLAGE GUEST HOUSE A program unique to Miami University, 16 students travel to Ghana, West Africa and work over the course of 6 weeks towards designing a contribution to benefit the community of Abrafo-Odumase. The first two weeks are dedicated to traveling the country of Ghana, while the last four weeks are focused on building within the village.

38

VILLAGE GUEST HOUSE


PROJECT TEAM Jessica Moeslein+ Jennifer Churchia LOCATION Abrafo-Odumase, Ghana, Africa DURATION Summer 2014 | 6 Weeks MENTOR J.E. Elliott TYPE Architecture DESCRIPTION

The guest house is constructed of concrete block, mortar, wood frame, and jalousie windows. The design emphasizes a large living space with a transverse corridor capped with jalousie windows at each end to allow for cooling and ventilation. The symmetrical nature of the design allows for privact between two guests while encouraging interaction in the large living space. The site is positioned on a hill facing the south, overlooking the village of Abrafo-Odumase. The guest house responds to the southern exposure with large windows allowing for sunlight, ventilation, and a strong connection between the village and the inhabitants within.

40

VILLAGE GUEST HOUSE

CONCEPTSKETCHES


CHOSEN DESIGN

VILLAGE GUEST HOUSE

41


FINAL PLAN[AS-BUILT]

NORTHELEVATION

SOUTHELEVATION

VILLAGE GUEST HOUSE

43


OVERTHE-RHINE CO-HOUSING A cohort of eight undergraduate and graduate students collaborates to design a successful co-housing community over the course of six weeks. Each member of the cohort not only contributed to the design of the communal public space, but also an individual unit that considered the shared responsibilities of the community. Each individual was to consider their lifestyle in ten years and design based upon the need of that lifestyle - many of these lifestyles included children and spouses. The cohort decided that the shared spaces of the co-housing community would include; dining for shared weekly meals, living space, laundry, a playroom, an outdoor public area, guest rooms, and study rooms. The group also designed underground parking with optional access to individual units. Due to time constraints, the public space was discussed but was not fully designed.

44

OVER-THE-RHINE CO-HOUSING


SITEPLAN

MULBERRY STREETELEVATION

46

OVER-THE-RHINE CO-HOUSING


CONCEPTSKETCH


LOCATION Cincinnati OTR, OH, United States

LEVEL01

DURATION Spring 2015 | 6 Weeks MENTOR Thomas Dutton TYPE Architecture CONCEPT This individual unit sought to integrate the surrounding context of the historic neighborhood with a modern vernacular approach. The staircase serves as the “book end” of the row houses, responding to the abrupt angle at the northeastern end of the site. The unit is programmed according to function in relation to public street, and the “interior street” that is part of the co-housing community. The unit includes a dining room and kitchen overlooking the living space. The third floor includes a personal studio overlooking the interior street and bedroom. The unit is constructed with a contemporary grey brick and dark grey stone. The living room is shaded by an exterior shading device on the south facade. 48

OVER-THE-RHINE CO-HOUSING

EAST-WESTSECTION


LEVEL02

NORTH-SOUTHSECTION

LEVEL03


SPRING STREET COMPLETE STREET The objective of this project was to identify a planning problem within Miami University’s campus and present the best possible solution through extensive research, data collection, and design. A project team of students decided that a major planning challenge on campus was the intersection of Spring Street and Maple Street. Spring Street - a large thoroughfare on campus - used daily by pedestrians, vehicles, bicyclists, and buses. The adjacent building to this intersection is the Armstrong Student Center - the most visited building during class hours. The project team saw this intersection as a safety hazard to all users because of its failure to direct traffic, pedestrians, and transportation.

50

SPRING STREET COMPLETE STREET


INTRODUCTION The purpose of this plan is to address the existing vehicle, pedestrian, bicycle conflict on Spring Street specifically at the Spring and Maple intersection.

EXISTINGCONDITIONS:

SPRING STREET

PROBLEM: High volume of vehicle and pedestrian conflict at the Spring Street/Maple Street intersection

MISSION: Create a more cohesive environment for every party involved on Spring Street.

TH MI

MAPLE STREET

been a on M steadi it, an grown the de the A PROJECT TEAM Miami Spring Street is a very chaotic passageway for every party involved. Being a Jessica Moeslein, Macy Anderson, driver Kellyit is very frustrating having pedestrians pop out from random places and not uninte Richter, Matt Lascheid, + Diana Suarez using the crosswalks. As a pedestrian, it is frightening to walk on Spring Street because Oxford cars are driving very fast down the straightaway towards Campus Avenue or Patterson accord Avenue. As a bicyclist, the bike lanes are used more for cars dropping off students for has in LOCATION class than the actual use of bikes, so bikers are forced to use the sidewalk for their 3 biking lanes. And lastly, as a bus driver or bus user, the Spring Street stops take a very interse Oxford, OH, United States long time because of the waiting buses have to do in order to leave room for drivers St, an and pedestrians. only c DURATION two c Fall 2015 | 6 Weeks arrang Armst OBJECTIVES MENTOR howev and un Dr. David Prytherch lation • Create a safer pedestrian experience for campu crossing the road at all crosswalks and the TYPE of ev major intersection of Spring and Maple. Urban Planning across St tra • More emphasis on crosswalks to make pedes them safer and to influence a better pedescross This table shows that there are tons of people that are crossing the street within trian rule following (influence pedestrians a 15 minute window. The evidence shows that a car may have to wait a very long timeoften to actually use crosswalk rather than being to pass the crosswalk. When data was taken, the pedes Pedestrian/Vehicular/Bus more innoted the intersection or jay walking) Conflicts: 52 SPRING STREET COMPLETE STREET observers of the intersection that cars • High Street menta stopped up to 5 times for pedestrians, leaving the • Spring Street/Petterson Avenue/State for th Route (SR) 73 speeding drivers frustrated and pedestrians confused. It isstreet. • Calm traffic along Lessen • Sundial Crossing which very evident from all these parties of being updifferent and slowing cars to• Shriver create a Center such confused is the fact thatsmoother/slower Spring Street has journey the • Patterson Avenue along the street

PROBLEM

opportunity to become much better through

• Kroger


METHODOLOGY: • Identify the problem at hand and all the parties involved • Collect data by physically studying the area and the activity within. The best way to collect data in this project was to sit and count the people walking/ biking/driving at various times of the day • Research best practices and determine what solutions are successful in similar areas • Identify multiple, alternative solutions in order to fit the city’s budget

SOLUTIONS: • Re-pavement and raising of sidewalks to increase visibility of pedestrians • Addition of medians to reduce vehicular speed for increased pedestrian and bicycle safety • Implementation of signage with flashing lights • Re-allocation of bus stops to existing Shriver Circle in order to alleviate congestion on Spring Street

SPRING STREET COMPLETE STREET

53


GATEWAY TO AMERICANA In the Spring of 1016, 17 Advanced Urban Planning students had the unique opportunity to consult with ciy officials in Monroe, Ohio about an adaptive re-use of the former American Park, also known as LeSourdsville Lake. Through a multi-step process with Monroe’s city officials and key community stakeholders, a vision and conceptual plan grew to guide future development of the proposed park, adjacent commercial, and multi-modal connectivity.

54

GATEWAY TO AMERICANA


»

Monroe will need about 200 acres of parkland by 2025. Acquisition of the 48acre project site could cut a deficit of Monroe’s parkland in half.

PROJECT TEAM DURATION Jessica Moeslein Annie Leanse 16 Weeks location is »Spring This 2016 prime| commercial Macy Anderson Kyle Mortimor zoned C-4 Gateway Commercial District to provide for high-quality business Billy Avalon Irene Queen MENTOR at a major gateway entrance Doug Brown Matt Shahroudi Dr. development David Prytherch to the city. Luke Foreman Cody Statum Kyle Fuller Elina Sukaryavichute LOCATION Kohl Kirkland Dan Tidyman Monroe, OH, United States Dexter Wright Jonathan Watson Yiren Xiao TYPE for nostalgic development but The history of the site presents exciting opportunities Urban Planning conditions offer significant challenges. Structures require decisions about rehabilitation, reuse,

Existing Conditions

or demolition. Active railroad tracks exist at the park-site entrance and multi-modal connectivity between the site and surrounding neighborhoods is weak, including a gap between the site and Route 4. EXISTINGCONDITIONS:

56

GATEWAY TO AMERICANA ArcGIS Current Building Inventory with Condition Status

7


ty owner, and local experts. Broad input was sought oth short term (1-5 years) and long term (5-10 years). ming esired DESIGN CHARETTE WITH THE CITY h as: OF MONROE

ed? t to

ities/

SOLUTIONS: METHODOLOGY: • Re-open existing swimming pool • Identify a clear vision for the re• Add a spray ground feature for purposed amusement park children • Host a charette with Monroe • Re-open theatre for community city officials and stakeholders to events and performances understand their vision and compare • Add dog park incorporating to our vision Students at the charette meeting witha stakeholders on nostalgic items • Clarify the vision and begin research. 2016. Install a canoe livery Separate into research teams:March 10, • • Utilize existing structure for a 1) Parks + Recreation, concession space near the entrance 2) Mixed Use Development to the park 3) Connectivity • Build a riverfront restaurant owned • Research best practices and case and operated through a private studies to determine what solutions partnership have been successful for other re• Create a “main street” for a downtown purposed amusement parks feel • Organize and present solutions • Connect existing pathways to the in phases for a multi-step Great Miami River Trail implementation

nd charette process, stakeholders identified the

h innovative design concepts to create a functional,

GATEWAY TO AMERICANA

at combines a residential and commercial hub in

57


and easily implementable features, which expansion of Phas Reopenand existing ca can garner interest in the park while developing park’s water elemen making the most of existing features. Add a spray gro

PHASE01:

» » » Install parking a

PHASE02:

the north side of th paved path, and portion of the Gr running through th Butler County Metr of construction of t timed with an Inter Dayton, Ohio sche

» Develop a pas

on the north side elements such as a

» Restore the lar

east side of the pa department

» Convert former

for farmers’ marke dependent festival

» Reopen theatre performances

58 TO AMERICANA ThisGATEWAY map depicts elements of

the first phase which include the reopening of the pool, passive recreation, and a nature trail.

»

This map depicts elements of t a “Nosta a canoe Install livery, a dog park, an struc many physical item

Park, such a reclam


P

se One, but further a fully developed vision for the park Pursue opportunity for a public-private apitalizing upon the to become and regional partnershipainrecreational a wetland redevelopment through nts. destination. construction of a large pond in the northern ac PHASE03:

the second phase which include nd the revitalization of existing cture.

»

»

area of the former lake site, which could serve as a new Americana Lake and could be used for fishing and paddle boating.

»

pool.

pr pla of

ev

» Install a canoe livery on the river bank. » Utilize existing structures for a concession »op space near the entrance to the park. » Add a dog park incorporating nostalgic » items between the playground and swimming » Repurpose

an existing structure to incorporate another nostalgic theme for bike storage for trail riders.

This map depicts elements of the third phase which include an PARKSOLUTIONS overpass, the implementation of guest cabins, and a waterfront restaurant.


COMMERCIALDEVELOPMENT:

60

GATEWAY TO AMERICANA


PROPOSEDLAYOUT:

GATEWAY TO AMERICANA

61


09 29 00.A002 1/2" METAL STUDS W/ BATT INSULATION GYPSUM BOARD WALL PER FLOOR PLAN

09 29 00.F00 SOUND ATTENUATION BLANKET 05 53 00.C00 EXPANDED METAL SCREEN

09 22 16.A00ALUM & GLASS WALL SYSTEM METAL STUD 09 22 16.A00 METAL STUD

PROFESSIONAL WORK

EXPANDED METAL SCREEN SECTIONDETAIL COL. DETAIL @ COL. 1L & AA.3

14

SCALE: 1 1/2" = 1'-0"

1F

LOCATION SCHEDULED RAISED ACCESS FLOOR SYSTEM, REFER TO Memphis, TN, United States PLANS 02 41 19.D02 EXISTING SLAB TO REMAIN

POSITION Intern at ANF Architects

MENTORS Joe Wieronski, Scott Dicus, Bob Land, + Derrick Choo

3" = 1'-0"

TYPE Architecture

02

PROJECT PROFILE During my first summer as an intern, I mostly worked on the office consolidation/ new location for First Tennessee Bank. I mostly worked on Construction Documents for this project. For this project, ANF was working in collaboration with Gensler Houston. 62

PROFESSIONAL WORK

EXISTING COL. (SEE STRUCTURAL)

A-B08

3 5/8" METAL STUDS

5/8" GYP. BD.

SCALE: 3" = 1'-0"

FIRM PROFILE Askew Nixon Ferguson (ANF) Architects is a medium sized firm that has been in Memphis for 40 years. Their work ranges from commercial, education, corporate, healthcare, and civic projects.

09 22 16.A01 METAL RUNNER TRACK 09 29 00.G00 1E.9 CONTINUOUS ACOUS SEALANT

SCHEDULED RAISED ACCESS FLOOR SYSTEM, REFER TO PLANS BB 02 41 19.D02 EXISTING SLAB TO REMAIN

1 1/2" METAL STUDS

08

BATT INSULATION

WALLSECTION VEST 214. NW CORNER DETAIL SCALE: 1 1/2" = 1'-0"

09 29 00.A00 GYPSUM BOARD 09 29 00.F00 SOUND ATTENUATION BLANKET 09 22 16.A00 METAL STUD

1F

1E.9 09 22 16.A01

METAL RUNNER TRACK 09 29 00.G00 CONTINUOUS ACOUS SEALANT

VARIES

1

09 29 00.A00 GYPSUM BOARD

2 1/2" MTL. STUD & 5/8" GYP. BD.

SCHEDULED WALL SEE PLAN

SCHEDULED RAISED ACCESS BB.8 FLOOR SYSTEM, REFER TO 1 1/2" METAL STUD PLANS & 5/8" GYP. BD.

02 41 19.D02 EXISTING SLAB TO REMAIN EXISTING TILT-UP & METAL STUD W/ GYP. BD. INTERIOR WALL CURTAIN WALL SYSTEM

CC


08

BREAK AREA 146 PLAN SCALE: 1/4" = 1'-0"

PLANCALLOUT

3' - 8"

3' - 8 1/2"

2' - 6"

LIGHT FIXTURE SEE RCP

BREAK AREA 146

PL02

COFFEE MAKER - FC1

2' - 10"

FAUCET

A

3' - 1 1/2"

3' - 0"

SO01

WC01

9' - 0"

11' - 10"

WASTE CHUTE

FIELD VERIFY

5' - 5 1/2"

INTERIORELEVATION

REFR.

09

EAST ELEVATION OF COFFEE BAR SCALE: 3/8" = 1'-0"

BULKHEAD ABOVE 08 ________ ________ A04.100

BREAK AREA 146 PLAN

BUILDINGELEVATION

12' - 0"

1' - 0"

05 ________ 1'-0" SCALE: 1/4" =________ A04.100

5' - 0"

5' - 0"

05

ICE & WATER DISPENSER OFCI

1' - 0"

WC01 ALIGN W/ EXIST. BLDG. REVEAL

S

S

PL02 ________ ________ 07 A04.100

2' - 10"

6' - 0"

REAVEALS

16' - 4"

3' - 0"

6"

10' - 0"

SO01

9' - 4 1/2" 2 EQUAL PANELS

3' - 0"

08

PLAM SIDE PANEL (PL2)

3' - 0"

TR

1 1/2"

3' - 0"

2' - 10"

SO01

PL02

LIGHT FIXTURE SEE RCP

DW

2' - 6"

2' - 0"

3' - 0" MIN.

CABLE RAIL

1' - 6"

3' - 0" 1 1/2"

3"

BRE SCALE:



Design Portfolio | Jessica Moeslein