Page 1

2

1

3

4

4

300

5300

Bund capacity = 3.0m³

300

300

1410

300

2 No. 120 x 508mm Rubber dock bumpers fixed vertically to concrete wall

220

380

4287

1600

N

2 No. 120 x 508mm Rubber dock bumpers fixed vertically to concrete wall

120

6

AD TANKS

198

220

5

220

1410

220

4287

T.O.C 15200

120

T.O.C 13500 120

380

120

A 76

250

4 x 375mm high concrete plinths to support IBC support frame

PUMP CABINET

HOSE VALVE CABINET

IBC 2

1500

730

T.O.C 15200

Inner face of concrete bund to be coated with Fosroc Nitocote

730

IBC 1

T.O.C 13500

T.O.C 15200

EMERGENCY SHOWER

12900 grating level

T.O.C 12500

250

3

T.O.C 12500

4 x 375mm high concrete plinths to support IBC support frame

250

250

Inner face of concrete bund to be coated with Fosroc Nitocote

T.O.C 12500

910

250

250

910

250

COMPANY INFORMATION REMOVED FOR USE IN PUBLIC PORTFOLIO.

IBC Mother-Daughter system by 'Chemical Support Systems' or equal approved

ALARM PANEL

250

76

A

3 198

300

198

250

12900

T.O.C 12300

1240

ACCESS AND COMPANIONWAY SYSTEM TO INTERNAL AND EXTERNAL AREAS GENERALLY

T.O.C 12310

1240 Grating supported on all 4 sides by steel L-Angles fixed into concrete wall

250

306

L35/115

T.O.C 12310

304 T.O.C 12500

Applied non-slip yellow 'nosing' to single step for visibility

Applied non-slip yellow 'nosing' to single step for visibility

700

1100mm High Railing

B

CAUSTIC OFFLOAD RAMP

New walls to create chemical area pocket

N 168743185 E 508536719

Caustic Ramp Chemical Area Pocket Plan

1

N 168744171 E 508526279

T.O.C 15200

T.O.C 13500

1 : 20 4

T.O.C 15200

198

T.O.C 15200

L35/115

T.O.C 13500

T.O.C 12500

50mm Steel Grating Walkway

T.O.C 12900

300 Section of wall to be removed to finished level +12.900 (Fairhurst to advise detail required for protection of reinforcement)

ALARM PANEL

4287

300

Section of wall to be removed

5600

13500

7

4287

Walkway Fixing Detail 1:5

13500

1000

12900

5600

12500

Section of wall to be removed

13500

400

Ground

1 : 50

Existing Wall Height

1000

12900

Walkway supported by steel L-Angle fixed into wall

400

400mm High bund wall

HOSE VALVE CABINET

Section of wall to be removed to finished level +12.500 (Fairhurst to advise detail required for protection of reinforcement)

600

PUMP CABINET

N 168746234 E 508526775

Concrete Wall Amendments Plan

5 EMERGENCY SHOWER

+ 12900

50

N 168745304 E 508536618

0

Caustic Ramp Chemical Area Pocket Elevation

2

6

1 : 50

1 : 50

4

3

198

198

IBC 1B (Replaced)

Mounting height to be confirmed by process team

2 No. 120 x 508mm Rubber dock bumpers fixed vertically to concrete wall

IBC 2B (Replaced)

IBC Mother-Daughter system by 'Chemical Support Systems' or equal approved

20

15200

Concrete Wall Amendments Elevation

ALARM PANEL

C

IBC 1B 508

C

T.O.C 12500

T.O.C 12500

IBC Mother-Daughter system by 'Chemical Support Systems' or equal approved

ACCESS AND COMPANIONWAY SYSTEM TO INTERNAL AND EXTERNAL AREAS GENERALLY

B

EMERGENCY SHOWER

IBC 1A (Fixed) 375mm High IBC support frame plinths

7

1837 IBC 1A

375mm High IBC support frame plinths

198

300

400

375

400 1850

3

HOSE VALVE CABINET

IBC 2A (Fixed)

12950

375

D

PUMP CABINET

2700

IBC steel support frame

1600

1850

4287

300

D

12308

1500

300

300

Caustic Ramp Chemical Area Pocket Section A 1 : 50

4

Section B 1 : 50 0

0.05

0.15

0.25

0.5m

2

3

0.2

0.5

SCALE BAR 1:20

SCALE BAR 1:5

1

0

4

1

2m

0

5m

SCALE BAR 1:50 5

6

A1


1

2

17

18

3

17

A

18

4

5

6

A

403

403

N

N

N M

N

B

17

18

403

1800

A 403

1800

Stairs + Landings as Spec. AS-00-601 L35

1050

800

17613

1 : 20

Odour Control Stairs Lvl 2

1100

2

1 : 20 17613 AFL

18

800

02_Mezzanine_Gasification Level 16900

250

15850 AFL

1763 1100

50

45

176

1763

250

47 46

CEMS STAIR

4 Risers @ 193mm 6 Risers @ 193mm 5 Risers @ 193mm 9 Risers @ 176mm

7 Risers @ 193mm

773 1159 1352 966 14263 AFL

00_Ground_Gasifaction 12500

10 Risers @ 176mm

800

1050

14263 AFL

48

49

1587 15850 AFL

800

C

Stair support structure to SE specification

2250

1800

20963

17613 AFL

9 Risers @ 176mm

N

10 Risers @ 176mm

A 403

1587

17

CEMS STAIR

6 Risers 4 Risers @ 193mm @ 193mm

19200 AFL

2250

100mm High Toeboard to all landings + platforms

1800

Odour Control Stairs Ground Lvl

COMPANY INFORMATION REMOVED FOR USE IN PUBLIC PORTFOLIO.

19200 AFL

ODOUR CONTROL STAIR

403

9 Risers @ 176mm

403

10 Risers @ 176mm

B

403

9 Risers @ 176mm

800 B

5

15850

10 Risers @ 176mm

800

800

1

20963 AFL

10 Risers @ 176mm

UP

38

20963 AFL 04_Mechanical Plant Room Mezz 20900

1763

20

22550 AFL

1587

UP

800

22550 AFL

1763

37

21

23516 AFL

1587

200

24868 AFL

ODOUR CONTROL STAIR

36

22550 AFL

7 Risers @ 193mm

22

05_Odour Control Mez. 23300

403

5 Risers @ 193mm

35

1352

1

23

966

18

800

34

1587

2

24

1763

17

33

1587

3

25

Crane Beam 24790

1100

16

32

2250 9 Treads @ 250mm

4

26

250

15

8 Treads @ 250mm

5

2000

14

9 Treads @ 250mm

6 2250

13

19

B

31

7

250

12

6

9 Risers @ 176mm

773 1159

27

26027 AFL

10 Risers @ 176mm

30

Stairs + Landings as Spec. AS-00-601 L35

9 Risers @ 176mm

250

Lower Roof 26550

28

9 8

11

26800 AFL

29

10 200

A

1763

800

14263

A

12500 AFL

2250 800

200

800

41

55 56

800

57

D

200

40

250

250

250

800

39 UP

19200

22550

1 : 50

B

38

193

54

250

Odour Control Stair - Section B

C

38

193

42

B

1 : 50

176

53

Odour Control Stair - Section A

176

43

9 Treads @ 250mm

52

2250

44

250

800

51

A

800

8 Treads @ 250mm

2000

80

B

D Space for future Carbon Filter

403

765 1050

3

Odour Control Stairs Lvl 3 1 : 20

1

4

5

Odour Control Stair 3D

2

3

OC Stair Section Detail

6

1 : 10

4

CEMS Stair Section Detail 1 : 10

5

6

A1


A1 B1

11

WT 05

GROUND FLOOR PLAN

0

B4

MJ

WT 05 WT 01 MJ

B5

MJ

B6

GROUND FLOOR - Wall Junction Details 13

COMPANY INFORMATION REMOVED FOR USE IN PUBLIC PORTFOLIO.

1 : 10

WT 08

B6

Hoarding to A3 Window Openings Thermal Cavity Closer retained @ 50mm Course 1 reinforcement

50mm rigid insulation

WT 09 26

WT 05

Plywood Boarding to A3 Unit voids Thermal Cavity Closer retained @ 50mm

13

1 : 10

S.E. indicates wall tie in this position - may be omitted where blockwork is stretcher bond.

1 : 200

*CONTRACTOR TO NOTE* Block details to either side of column utilise large format cut blocks and special H&S handling measures may be required during fixing of these items.

GROUND FLOOR - Wall Junction Details 12

12

1 : 10

215

B3

MJ

GROUND FLOOR - Wall Junction Details 11

245

B2

B6

MJ

500

Debonding wall tie

Course 2 reinforcement

100mm Rigid Insulation

MJ

BA

50mm Rigid Insulation

MJ

419

MJ

Thermal Cavity Closer retained @ 50mm

WT 08 WT 12

Thermal Cavity Closer retained @ 50mm

191

Course 1 & 2 reinforcement

Thermal Cavity Closer retained @ 50mm 400

MJ

MJ

MJ

BB

MJ

WT 57 WT 08

BG

441

MJ

400

MJ

234

Stack bonded block work 1. Bed joint reinforcement to be adopted in both skins where stack bonding occurs. 2. Internal bed joint reinforcement is to be Galvanised only. 3. External bed joint is to be Stainless Steel only. 4. Bed joint in stack bond to be every course. 5. Bed joint to stretcher bond (internal course to stack bond) to be every course. 6. Frame cramps to be used between skins where bed joint occurs due to the thickness of joint and being unable to get both ties and bed joint installed.

BG

WT 57

WT 12

WT 08

MJ

Thermal Cavity Closer retained @ 75mm

BC

WT 50

440

50mm rigid insulation

MJ

MJ

MJ

737 WT 08

MJ

100mm Rigid Insulation

WT 57

SPV type frame cramp ties

WT 10

WT 50

Standard double skin stretcher bond 1. Galvanised bed joint reinforcement required to internal skin at every course.

WT 09

B6 WT 08

287

100mm Rigid Insulation

Hoarding to A3 Window Openings

WT 50

Formed corner in rusticated recon stone

B6

MJ

WT 10 MJ

WT 50

Lintels 1.

MJ

14

WT 10 WT 57 WT 57 WT 54

WT 45

19 B-16-41

MJ

MJ

MJ

WT 54

WT 77

WT 57

WT 57

15

1 : 10

BE

MJ

WT 57

WT 57 WT 57

GROUND FLOOR - Wall Junction Details 14

GROUND FLOOR - Wall Junction Details 15

16

1 : 10

B3

WT 10

MJ

WT 54 WT 57 WT 57 WT 45 WT 57

MJ

Hoarding to A3 Window Openings WT 45

WT 45

Thermal Cavity Closer retained @ 50mm

400

Thermal Cavity Closer retained @ 50mm

BF WT 45

WT 01

290

75mm block

MJ

WT 10

WT 50 WT 44

WT 09

18

Course 1 reinforcement Flashed with PPC Aluminium RAL 7012 Vertical Flashing

Course 2 reinforcement

B-16-41

WT 08

MJ

WT 09

MJ

BG

WT 09

17

16

B-16-41

B-16-41

BH

12

11 B-16-41

Detail Legend

374

BH

= Standard Ancon Wall Tie (RT2)

500

WT 08

B-16-41

100

MJ

100mm Rigid Insulation

400

MJ

Course 1 reinforcement

50mm Rigid Insulation

WT 08

WT 05

390

Course 2 reinforcement

WT 54

MJ

Any stainless steel fixings connecting to mild steel sections will require to be isolated in accordance with tie manufacturer's specifications.

B1 50

WT 08

BF MJ

Fixings

1 : 10

B1

WT 45 WT 50

GROUND FLOOR - Wall Junction Details 16

To be in accordance with S.E. and Masonry Contrators agreed schedule.

BH

BH

Fireborne horizontal slip plane over Movement Joint. Extend Block 50mm beyond movement joint See 3D image below.

= Standard HD Ancon Wall Tie (ST1)

363

400

MJ

Fixing centres to heads and sides (wind posts / concrete columns and soffits) 1. 450 vertically and 900 horizontally. Cavity wall ties / frame cramps 1. All ties at 450 vertically and 900 horizontally, minimum of 5no./m².

BD

MJ MJ

Masonry Ties & Reinforcing (As advised by Structural Engineer)

440

WT 57 WT 12

BH 695

BH

= Standard Ancon Framp cramp Wall Tie (SPV) = Debonding Wall Tie (Block MJ) = Debonding Wall Tie (10mm Gap)

50mm MJ WT 09

WT 09

BH

MJ

14

B5 WT 09

WT 09

B-16-41

13

Standard ties

888

490

B-16-41

MJ

65mm Rigid Insulation B2

B3

B4

B6

*S.E. TO NOTE* Block detail utilised in lieu of steel. (See note in title column).

= Ancon Wall Start System

100mm Rigid Insulation

184

Thermal Cavity Closer retained @ 65mm Hoarding to A3 Window Openings

PLEASE NOTE: No bed joint reinforcement has been included to internal walls. Head restraint requires hit and miss angles with ties to S.E. spec and layout.

= Debonding Bent Twist Tie

= Blockwork reinforcement

10

B1

Debonding Wall Tie

= Thermabate Cavity Closer 20

WT 09

MJ

100 245

15 B-16-41

= Standard Bent Twist Tie

50

737 WT 09

B3

Stack Bonded full bricks (base in blue). See other coursing drawings. No visible cuts.

287

100 215

100mm Rigid Insulation

A

WT 09

WT 05 337

= Line of DPC

Half Block

Black 10mm mastic + foam backing filler vertically to facilitate movement

B1

= Special Ancon Wall Tie and/or Windpost

390

B1

Rusticated Recon Stone

17

GROUND FLOOR - Wall Junction Details 17

18

1 : 10

GROUND FLOOR - Wall Junction Details 18 1 : 10

19

B1

GROUND FLOOR - Wall Junction Details 19

Masonry-Wall Schedule

1 : 10 Type Mark

B1

'BrickForce' Bed Reinforcement to Engineers design with reference to coursing

'BrickForce' Bed Reinforcement to Engineers design with reference to coursing

WT 57

Wall lining shown as single layer 15mm plasterboard on 25mm mortar zone (Dot n' Dab). Lining Subject to change to Gypliner in lieu of mortar (contractor to advise)

WT 50

WT 01

01 E_BLK(100)_250_INSUL/BLK-PGRB 02 E_BLK(100)_285_CAV/BLK-PGRB 05 E_BLK(140)_293_BLK-PGRB/BRK-Y 07 E_MTL(100)_395_MTL/BLK 08 E_BLK(140)_390_BLK-PGRB/STN 09 E_BLK(140)_390_BLK-PGRB/STN-RUS 10 E_BLK(140)_390_BLK/BLK-PGRB 12 E_BLK(140)_393_BLK/BRK-Y 17 E_BLK(100)_100_BLK-PGRB 18 E_BRK(103)_103_BRK-Y 22 E_BRK(103)_250_INSUL/BRK-Y 40 E_BRK(103)_285_INSUL/BRK-Y 44 I_BLK(100)_215_BLK-PGRB/BLK-PGRB 45 I_BLK(140)_140_BLK 50 I_BLK(140)_263_BLK-PGRB/BRK-Y Grand total: 90

Wall & starter ties 174

Wall lining shown as single layer 15mm plasterboard on 25mm mortar zone (Dot n' Dab). Lining Subject to change to Gypliner in lieu of mortar (contractor to advise)

Thermal Cavity Closers

10

10

327

215

Secondary Elevation

WT 05

250

SPV Type frame cramp

348

250

440

Blockwork Wall Fireborne

Coursing

100mm O

verlap

Recon Sto ne

Blocks

n Foundatio

293

MJ

MJ

100mm Rigid Insulation

100mm Rigid Insulation

50 Moveme

390 390 327

100

10

Concrete Upstand Painted Black

Primary Elevation - Stack Bonded full 327mm Fireborn blocks (base in blue). See other coursing drawings. No visible cuts.

*S.E. TO NOTE* No alterations made to this detail as it is a pier between two door openings only.

140

1

Type

nt Joint

Ensure gap is clear of all mortar snots and debris. Fill with flexible insulation.

Fireborne Slip Plane & Recon Stone Intersection

WT 10 B1 B1 N

0 1:100

1

4m APPROXIMATE NORTH

Count 5 3 5 2 11 5 8 4 2 5 3 2 4 22 9


A1 01

FIRST FLOOR - Wall Junction Details 01

B1

FIRST FLOOR - Wall Junction Details 02

02

1 : 10

03

1 : 10

FIRST FLOOR - Wall Junction Details 03 1 : 10

B4 B2

B2

B4

145

1 : 200 WT 02

Debonding Wall Tie 10

233 430

MJ

285

Fireborn Clay Masonry Blocks

100

B3

Paint Grade Concrete Blockwork

B-16-43

MJ 10

MJ

B5

337

A

440 100

WT 02

193

BA

10

100

DRO

145

WT 17

440

WT 17

337

B6

100

WT 02

WT 85

50

WT 40 440

B-16-43

A

MJ

01

02

COMPANY INFORMATION REMOVED FOR USE IN PUBLIC PORTFOLIO.

FIRST FLOOR PLAN

-

185

MJ

Debonding Wall Tie

A

B-16-43 MJ

337

100

03

A

10

WT 02

245

BB 145

WT 07

100mm Rigid Insulation

WT 85

A 195

WT 07

203

WT 85

100mm Rigid Insulation

WT 27

Masonry Ties & Reinforcing (As advised by Structural Engineer) MJ

BC

100mm Rigid Insulation

1:80

WT 07

WT CT03

100

303

100

145

150

100

Stack bonded block work 1. Bed joint reinforcement to be adopted in both skins where stack bonding occurs. 2. Internal bed joint reinforcement is to be Galvanised only. 3. External bed joint is to be Stainless Steel only. 4. Bed joint in stack bond to be every course. 5. Bed joint to stretcher bond (internal course to stack bond) to be every course. 6. Frame cramps to be used between skins where bed joint occurs due to the thickness of joint and being unable to get both ties and bed joint installed.

145

04 B-16-43

B4

MJ

BD

WT 07

06

05

B-16-43

B-16-43

B2

04

1:80

FIRST FLOOR - Wall Junction Details 04

05

1 : 10

06

FIRST FLOOR - Wall Junction Details 05 1 : 10

Standard double skin stretcher bond 1. Galvanised bed joint reinforcement required to internal skin at every course.

FIRST FLOOR - Wall Junction Details 06 1 : 10

Fixing centres to heads and sides (wind posts / concrete columns and soffits) 1. 450 vertically and 900 horizontally.

B3 B1

WT 01 MJ

295

466

BE

WT 45

BE

Lintels 1.

J31/131

1:80

100

50

100

100

07

145

100

MJ

WT 45

Fixings

39

B-16-43 WT 62

WT 45 BF

Debonding Wall Tie

MJ

200

WT 45

BD

MJ

140

200mm Rigid Insulation

WT 07

A

= Debonding Bent Twist Tie

A 200

F22/115

150

100

= Thermabate Cavity Closer

100mm Rigid Insulation

= Ancon Wall Start System = Blockwork reinforcement

15

BH

B5

= Standard Bent Twist Tie

450

429

100

BD

= Standard Ancon Framp cramp Wall Tie (SPV) = Debonding Wall Tie (Block MJ) = Debonding Wall Tie (10mm Gap)

BE 105

BE BG

= Standard HD Ancon Wall Tie (ST1)

130

MJ MJ

145

WT 16

B1

B2

B3

B4

Fire Protection to McLaren proposals

B6

100mm Rigid Insulation

140

100

07

08

1 : 10

= Line of DPC

B1

09

1 : 10

East Elevation - A to B Coursing Detail

10

3D - Fireborne & Recon Stone Intersection

Masonry-Wall Schedule

1 : 10 337

263

327

253

Type Mark

B1

B1 B1

50mm Indicative Movement Joint Behind Fireborn

385 140 401

261 253

100 15 100 30

Movement Joint to be filled with Rockwool and Flashed with PPC Aluminium RAL 7012 Vertical Flashing

WT 62

200mm thick concrete upstand wall below to SE details

Stone Capping terminates 10mm in front of Fireborn - Removed for clarity

16 340

Steelwork to SE Details

Fireborne to continue behind Recon Stone, utilising horizontal slip plane over movement joint

174

184

MJ

174 192

Debonding Wall Tie

01-BLOCK B - FIRST FLOOR FFL 74100

Stack Bonded Fireborn

174

Recon Stone end blocks (indicated in transparent for clarity) to terminate 10mm in front of Fireborne intersection

50

174

140

261

Rusticated Recon Stone 337

253

WT 35

16 140

100

Black 10mm mastic + foam backing filler vertically to facilitate movement

20

103

292

100mm Rigid Insulation

Black 10mm mastic + foam backing filler vertically to facilitate movement

Fireborne horizontal slip plane over 50mm Movement Joint & Extended 50mm beyond (100mm Total Overlap)

WT 08

face m to e 225m Ston c on of Re

orn Fireb

Reco nS

tone

145 N

09 B1

75

200 420

15 100 30B1 16

Type

01 E_BLK(100)_250_INSUL/BLK-PGRB 02 E_BLK(100)_285_CAV/BLK-PGRB 05 E_BLK(140)_293_BLK-PGRB/BRK-Y 07 E_MTL(100)_395_MTL/BLK 08 E_BLK(140)_390_BLK-PGRB/STN 09 E_BLK(140)_390_BLK-PGRB/STN-RUS 10 E_BLK(140)_390_BLK/BLK-PGRB 12 E_BLK(140)_393_BLK/BRK-Y 17 E_BLK(100)_100_BLK-PGRB 18 E_BRK(103)_103_BRK-Y 22 E_BRK(103)_250_INSUL/BRK-Y 40 E_BRK(103)_285_INSUL/BRK-Y 44 I_BLK(100)_215_BLK-PGRB/BLK-PGRB 45 I_BLK(140)_140_BLK 50 I_BLK(140)_263_BLK-PGRB/BRK-Y Grand total: 90

WT 35 50mm movement joint to Structural Engineers Details

= Special Ancon Wall Tie and/or Windpost

16

B3

FIRST FLOOR - Wall Junction Details 08

A

145

200mm Rigid Insulation

FIRST FLOOR - Wall Junction Details 07

Any stainless steel fixings connecting to mild steel sections will require to be isolated in accordance with tie manufacturer's specifications.

= Standard Ancon Wall Tie (RT2)

15

Debonding Wall Tie

B-16-43

To be in accordance with S.E. and Masonry Contrators agreed schedule.

Detail Legend

394

MJ

A

50

08

Cavity wall ties / frame cramps 1. All ties at 450 vertically and 900 horizontally, minimum of 5no./m².

401

100mm Rigid Insulation

105

BE

0 1:100

1

4m APPROXIMATE NORTH

Count 5 3 5 2 11 5 8 4 2 5 3 2 4 22 9


A0

B6

B5

B4

B3 B2

Previous 45° angle + height

Revised 22.5° angle + 200mm drop

935

+85.080

Lowered height from as built. Reduced visibility over parapet

1550

Old Meadow House - Third Floor Eye Level Circa +83.025

300

Southern array moved North

06 - BLOCK B ROOF 89205

Old Meadow House - Third Floor

+69.375

+69.120

INIDICATIVE FACADES ONLY AND SUBJECT TO INDIVIDUAL RETAIL UNIT PLANNING APPLICATION HIGH STREET

4

UNIT 4

HOTEL

MOE

SK-207 - Section Through PVs

9

1 : 50

Perspective Third Floor Flats (illustrative) - Solar Thermal + Plant Not Visible

PLANT

PEGLER WAY

1

North Elevation Allowance for descrete surface mounted CCTV & MOE lights

1 : 200

Dry Riser inlets to FO requirements to stair cores generally

Allowance for descrete surface mounted CCTV & MOE lights

"Real" view from conservation area/high street considered + reduced.

+85.080

Old Meadow House - Second Floor Eye Level Circa +79.025

Photo 1a - View of Hotel Roof Plant Looking West

Old Meadow House - Second Floor +68.650

6 PEGLER WAY

HOTEL

GROUND FLOOR CAR PARK

Perspective Second Floor Flats (illustrative) - Solar Thermal + Plant Not Visible

MOE CORE

OLD MEADOW HOUSE STORE

2

West Elevation 1 : 200

Angle of View 2 & 4 on sheet SK-208

This element is illustrative. Photo 1a (above) shows reduced actual configuration + grey colouring to blend with the sky. Relatively sheltered position + aesthetics explained in illustrative 3D sheets appended. Old Meadow House - First Floor Eye Level Circa +75.025 Ph oto

1a

Panels @ 22.5° angle and reduced height.

Old Meadow House - First Floor LOUVRE SCREEN

7

Perspective First Floor Flats (illustrative) - Solar Thermal + Plant Not Visible

Rear of Panels + frame coated in "Goosewing Grey" to reduce visual impact (Northern array only).

SK-207 - Hotel Roof Screen 3D

OLD MEADOW HOUSE

5

NB: Plan locations of Solar Thermal Panels + Plant is as approved in the NMPA.

Old Meadow House - First Floor Eye Level Circa +71.025

This Drawing Clarifies the height of these elements only. Angle of View 1 & 3 on sheet SK-208

Plan shadow analysis illustrates there is no additional visual impact to the locality. Old Meadow House - Ground Floor

3

SK-207 - PROPOSED ROOF PLAN 1 : 200

8

COMPANY INFORMATION REMOVED FOR USE IN PUBLIC PORTFOLIO.

Perspective from Ground Floor Flats (illustrative) - Solar Thermal + Plant Not Visible


5

6 Disabled Refuge

sr.SB.2 FD60/60s

D

12

7

UP

2 2000

3

Plant

00 12

UP

DN G.E01 FD60/60s

B.08 FD60/60s

B.02 FD60/60s

Stairs to Mezzanine

B.07 FD60/60s

ve Tra

l

Po in

9000

Point: 23m

UP

Retail - Basement

B.04 FD60/60s

1151 m²

B.05 FD60/60s Fur the st

0m t: 2 oin P est rth Fu

t: 2 1m

B

Storage 286 m²

A

Po

int : 22 m

9000

9000

9000

UP

an l Dist Trave

ce: 18

G.E02 FD60/60s A

1

2

3

4

5

6

7

E

5

1

2

3

00 12

120

0

UP

D

7

0 12

Mezzanine - Retail 350 m²

1.02 FD60/60s

1.03 FD60/60s UP

1st Floor Retail

1st Floor Office

446 m²

676 m²

Fur the st 00 12

Poi nt: 24

C

2.02 FD60/60s

nce

2.04 FD60/60s

m : 25

2.03 FD60/60s UP

2nd Floor Office 1160 m²

1m t: 2 oin P st the Fur

m

B

Fur the st 00 12

1m t: 2 oin P st the Fur

ist a lD e v Tra

Furthe st Poin t: 25m

m : 25

Furthest Point: 22m

Furthe st Poin t: 25m

Steel columns encased in concrete within retail areas

nce

9m :1 ce an

9m :1 ce an

ist a lD e v Tra

GypLyner ENCASE column encasement system

st Di

1.04 FD60/60s

GypLyner ENCASE column encasement system

st Di

C

l ve

l ve

int: 22m

UP

a Tr

a Tr

7

0

2.01 FD60/60s

D

C

Steel columns encased in concrete within retail areas

6

UP

Double Blockwork Fire protected wall up to underside of floor above

Stairs to Upper Ground Level

Shear concrete twin wall stair/lift cores

5

00 12

UP

1.01 FD60/60s

Wider stair capping off Basement stair core below

4

E

D

B

DN

5181

1 : 200

M.01 FD60/60s

G.03 FD60/60s

DN

m

1 : 200

UP

8m

B

1 : 200

Furthest Po

ce: 2

335m²

Ground Floor Fire Strategy

6

Dista n

Retail - Lower Ground

544 m²

Basement Fire Strategy

DN

6m t: 1

Retail - Upper Ground

Sub Basement Fire Strategy

4

est rth u F

sr.G.2 FD60/60s

G.02 FD60/60s

A

9000

sr.G.1 FD60/60s

in Po

Trave l

5431

B

B.06 FD60/60s

00 12

Disabled Refuge

B.03 FD60/60s

Furth est

Fu rth est

1400

127 m²

C

9000

Furthest Point: 22m

1200 900

sr.B.1 FD60/60s

:2 ce an t s Di

3m

00 12

SB.05 FD60/60s

UP G.07 FD60/60s

7m :2 nt oi tP

UP

G.E03 FD60/60s

Office Reception

Furthest Point: 25m

SB.04 FD60/60s

UP

sr.G.3 FD60/60s

Steel columns encased in concrete within retail areas

C

SB.06 FD60/60s

00 12

es rth Fu

SB.03 FD60/60s

m

6m :1 ce an

C

7

UP

D

st Di

sr.SB.1 FD60/60s

6

Double Blockwork Fire protected wall up to underside of floor above

Stairs Between Upper & Lower Ground Levels

l ve

l ve Tra

5

2000

264 m²

23 e: nc a t Dis

4

00 12

UP

B.01 FD60/60s

SB.09 FD60/60s

307 m²

5181

1

a Tr

Retail - Sub Basement

6

sr.B.2 FD60/60s

00

SB.02 FD60/60s st a n ce : 18 m

5

E

D

vel Di

4

1200

SB.10 FD60/60s

Tra

3

E

UP

1200

2

Furthest Point: 22m

m t: 30 Poin t s e h Furt

UP SB.01 FD60/60s

1

900

Disabled Refuge

7 1400

900

E

4

2000

3 1400

Furthest Point: 22m

2

5500

1

Poi nt: 24

m

B

A Shear concrete twin wall stair/lift cores

Mezzanine Fire Strategy

Shear concrete twin wall stair/lift cores

A

A

1 : 200

1

2

3

4

5

6

7

E

1st Floor Fire Strategy

2nd to 6th Floor Fire Strategy

1 : 200

1 : 200

1

2

3

4

5

6

7

E DN

DN 00 12

00 12

00 12

UP

00 12

UP

DOORS All escape route, service riser, and lift shaft doors should be rated FD60/60s - 60 minutes fire protection, 60 minutes fire integrity, and smoke sealed (all doors to have intumescent seals).

Plant 87 m²

sr7C FD60/60s

sr8C FD60/60s

7.01 FD60/60s

D

Escape doors must open in direction of escape, must not impede escape routes, and have 1200mm minimum clear opening space to match escape stair width.

8.01 FD60/60s

D

Vision panels to all internal escape doors to allow visibility as per guidance in Approved Document M.

a Tr 9m :1 ce an

Dis vel

Di st

8.04 FD60/60s

GypLyner ENCASE column encasement system an ce :1 9m

sr8A FD60/60s

sr8B FD60/60s

8th Floor Office 577 m²

25m ce: n a t Dis vel Tra

Fu rth e

Tra

Furthest Point: 19m

st Di

sr7B FD60/60s

25m ce: n a t

ve l

st P oin t: 1 9m

l ve

sr7A FD60/60s

Tr a

7.04 FD60/60s

GypLyner ENCASE column encasement system

C

C

Final escape doors must open outwards onto level public realm. Doors should be recessed to keep door leaves inside property boundary and not cause an obstruction.

STAIRS & LIFTS All stair/lift cores are fully protected concrete shear wall construction, with additional lobbies where required. As per guidance in Approved Document M, escape stairs are to be 1200mm wide to allow flow of traffic from all floors.

A

19/05/2014

Rev.

Date

Final Submission to Client

JC

Description

Initial

Three stair cores are required to allow for minimum travel distances and to accommodate the building occupancy of 600+. One set of stairs coming from the basement levels must terminate at escape level. A 1400x900mm Disabled refuge zone is required at each main landing.

7.02 FD60/60s

7.03 FD60/60s

8.02 FD60/60s DN

UP 15m

Where a floor level has split occupancy (Retail + Office) a sufficient fire barrier must be provided to prevent the spread of fire between the properties. 18m

A double thickness concrete block wall with fire resistant plasterboard on both sides will provide this barrier, and must be fully sealed via compressible fire breaks and intumescent sealant at the base and head junctions with the concrete floor slabs. Client External wall cavities should be filled with cavity fire barriers at floor intervals to prevent the spread of fire between floors.

Alex Naraian

The structural steel columns are protected by a double layer of fire resistant plasterboard, or encased in concrete within retail areas. Shear concrete twin wall stair/lift cores

A

Furt hest Poin t:

B

Fur the

st P o

Furt

int: t Po hes

WALLS & STRUCTURE

00 12

st P o in t: 2 4m

25m nt: Poi

B

Fur the 00 12

int: 25m

823 m²

st the Fur

7th Floor Office

1m t: 2 oin P st the Fur

8.03 FD60/60s

Shear concrete twin wall stair/lift cores

Steel beams are mainly protected by the inherent properties of the composite concrete floor construction, but may also be intumescent painted to the under side.

Project

Drawing

A

Fire Strategy Plans

LEGEND = 60 Minute Fire Compartment Walls

7th Floor Fire Strategy

8th Floor Fire Strategy

1 : 200

1 : 200

Piccadilly Office & Retail Building

= 60 Minute Fire Rated Doors = Path of Escape Route

Scale (@ A1)

Date

Drawn by

1 : 200

19/05/2014

JC

Project No.

Drawing No.

Rev.

Checked by

ARC500

A101

A

SR


1 1

80

150

95

25 'Pilkington Planar SentryGlas' Toughened Structural Glazing System to ground floor units

Bitumin External Tanking Membrane

Pilkington Active SunShade Self Cleaning Solar Efficient Glass Curtain Wall Panels from First Floor

Pilkington 905J Structural Glass Fixings secured into Structural Glass Fin (mullion)

GypLyner ENCASE system with 2 Layers Gyproc FireLine 12.5mm Plasterboard Column Encasement

GypLyner ENCASE system with 2 Layers Gyproc FireLine 12.5mm Plasterboard Column Encasement

Low sill feature to provide more light. Interior Sill Components made flush with Vented Base Mullion Pilkington Vented Curtain Wall Mullion with Sill Flashing

Silicone Sealant to base of Structural Glazing Units

'Kingspan Styrozone N 300 R' External Basement Wall Insulation

GypLyner ENCASE system with 2 Layers Gyproc FireLine 12.5mm Plasterboard Column Encasement

Double Layer Gypsum Plasterboard fixed to Metsec Studs

Structural Glass Fin Base Fixing secured into Stone Cill Feature. Polyeurthene damper inbetween elements.

75mm Metsec Internal Stud Wall secured to Structural Steel Frame

Hollow Core Concrete Filled Masonry Blocks to form low level wall (standard masonry units above)

Steel L-Angle fixed back to Structural Columns supporting Stone Sill Feature

Reinforced Concrete Basement Retaining Wall

Double Layer Gypsum Plasterboard fixed to Metsec Studs

600x400mm Portland Stone Units to ground level facades only

Kingspan FDEB raised access floor system (based on 4kN/m² loading)

Halfen 30° Angled Stonework Support Bracket secured and cast into low level concrete wall

50 50

80

140

5200

25 Kingspan FDEB raised access floor system (based on 4kN/m² loading)

353

'Newton 803' Studded Cavity Drainage Membrane lapped under DPM

60

Rockwool FIREPRO SP Cavity Fire Barrier fixed to edge of floor

Halfen HRM Stone Cladding Retraints fixed back to structure

75

Bitumin Based Compressible Board to base of stone

15mm Min.

40 Services Void

Parex Polurea 200 Spray over water proofing & tolerance between pavement & stone units

7 65

'Newton Basedrain' to collect moisture runoff from Drainage Membrane

200

Services Void

DPM lapped 300mm (minimum) under Tanking Membrane

15mm Min.

150

0

Services Void

400

Ground (Upper) 40

Basement (Lower)

Kingspan FDEB raised access floor system (based on 4kN/m² loading)

"Bronze" finish Aluminium Flashing Sill

First FFL

Floor Screed to level finish

400

DPM Exisitng Concrete Slab Pavement & Sand Base

-9200

100mm Metsec Infill Wall System fixed to Steel Structure & Floor

Sheathing Board fixed to Metsec Framing

Floor Screed to level finish

Floating Floor Screed to Level Finish 'Newton 803' Studded Cavity Drainage Membrane

Kingspan Thermastone Insulated Rainscreen System - Venezia (rough faced) finish

558

Geotextile Filter Fabric

Steel L-Angle for Mullion support fixed back to Structural Frame. Rockwool Insulation packed between elements.

Additonal Cold Rolled Steel Elements to form floor edge

225

'Kingspan Styrozone N 300 R' External Basement Wall Insulation lapped 300mm Minimum with above ground insulation

50mm Min.

Kingspan Kooltherm K18 Rigid Insulation Panels

Comflor SlimDek 225 Composite Floor Steel Decking fixed to Asymetric Steel Beam & filled with concrete on site Compressible Fire Break to provide deflection head

Comflor SlimDek 225 Composite Floor Steel Decking fixed to Asymetric Steel Beam & filled with concrete on site

Existing Vaults

Ancon IHR-B Debonding Head Restraint

50mm Min.

'Titan-Pro' Sump System collects water from 'Basedrain' channels for pumping out of building

Additonal Cold Rolled Steel Elements to form floor edge

350

Steel Frame fixings into Foundation Elements design TBC by SE

Additonal Steel Plate for glass fin support bracket fixing

Compressible Fire Break to provide deflection head Concrete Basement Floor Slab to SE spec.

Precast Basement Wall Units secured to Structural Steel Frame

Piled Foundations constructed according to SE design and specification

Armstrong 'Silhouette' suspended ceiling system Pilkington Structural Glass Fin (mullion) fixed to Head Bracket Unit

Damp Proof Membrane

Steel RHS Lintel fixed between Columns for high level Blockwork support

Armstrong 'Silhouette' suspended ceiling system

External Tanking Membrane lapped under DPM

Polyuethene Head Capping to structural glass panels and fit into notch cut stone units

Metsec Internal Stud Wall secured to Structural Steel Frame Kingspan Styrozone N 300 R Basement Floor Insulation

Plasterboard Soffit to head of Structural Glazing fixed to Cold Rolled sections

Double Layer Gypsum Plasterboard fixed to Metsec Studs

80

150

'Pilkington Planar SentryGlas' Toughened Structural Glazing System

20 75 25

Basement Junction Detail

Ground Junction Detail

First Floor Junction Detail

1 : 10

1 : 10

1 : 10

1 Maximum Height 35000

Drip angle & eaves components

Kalzip Standing Seam Flat Roof System on Structural Deck Base

A

Kalzip membrane lined insulated gutter Kalzip aluminium ridge flashing

"Bronze" finish Aluminium Flashing to top of Parapet Wall

1:57

Timber and Compressible Packers to support Aluminium Flashing Feature

15

140

12 80

38

12

"Bronze" finish Rounded Aluminium Fascia and Flashing fixed to cantilevered beam Render finish to internal side of parapet wall

Hollow Core Concrete Filled Masonry Blocks sat on upstand to form Parapet Wall Feature

Sheathing Board Kingspan Thermastone Insulated Rainscreen System - Venezia (rough faced) finish

Kalzip glass fiber thermal insulation Kingspan Styrozone Rigid Insulation Layer Cantilevered beam for eaves components fixed to main beam

Kalzip Vapor control layer

High Performance Polyethylene Water Proofing Membrane

Aluminium profiled soffit secured to cantilevered beam Kalzip acoutic slab & tophat section zone

Roof soffit flashing behind rainscreen panels

Stone Paving Units with Free Flowing Drainage Gaps Harmer Uni Ring Paving Supports

Rigid & fiber glass insulation used to fill voids

Kingspan Purlcrete Cementitious Faced Chevron Insulated Upstand

Kalzip ST clips with thermal barrier fixed to top-hat sections Kingspan Thermastone Insulated Rainscreen System - Venezia (rough faced) finish

Screed to Falls Kalzip perforated steel structural deck fixed to purlins

100

25

Roof purlins & Intumesent Paintedsupporing structure to SE specification

26800

Rev.

Date

Final Submission to Client

JC

Description

Initial

129

Steel L Angle fixed back to main columns for mullion fixing plate, and additional cladding support

19/05/2014

16

Rain Water Pipe Swan Necked and secured to columns PIR Board Insulation & Air Seals to maintain thermal integrity. Polyuethene spacers to be used on fixings to steel

A

65

80 12

181

100mm Metsec Infill Wall System fixed to Steel Structure

38

400

12

Comflor SlimDek 225 Composite Concrete Floor Deck

Harmer Cast Iron Medium Sump with adjustable height square flat grate

40

Seventh FFL

Sheathing Board fixed to Metsec Framing

Gravel filled border

Double Layer Gypsum Plasterboard fixed to Metsec Studs returned at Curtain Wall Head to provide flush finish

225

Armstrong 'Silhouette' suspended ceiling

Client

Pilkington Active SunShade Self Cleaning Solar Efficient Glass Curtain Wall Panels

Alex Naraian

Pilkington Curtain Wall Mullion - Head Units to provide flashing to Stone Cladding Sill

26

28

GypLyner ENCASE system with 2 Layers Gyproc FireLine 12.5mm Plasterboard Column Encasement

139

193

Project

74

Piccadilly Office & Retail Building

Drawing

Roof Junction Detail 1 : 10

Balcony to Parapet Detail 1 : 10

Construction Details Scale (@ A1)

Date

Drawn by

1 : 10

19/05/2014

JC

Project No.

Drawing No.

Rev.

Checked by

ARC500

A104

A

SR


A Kalzip bullnose fascia and flashing fixed to cantilevered beam

Key Plan

Drip angle & eaves components Kalzip membrane lined insulated gutter

65

Roof

190

10.00°

Kalzip aluminium ridge flashing

2

12250

30 98

N 335

Section taken through South wall - cutting main curtain wall

Roof - TOS 11785 Kalzip glass fiber thermal insulation

A

Roof purlins & supporing structure to SE specification

Kalzip Vapor control layer

1505 Cantilevered beam for shading overhang fixed to main beam

175mm Kingspan Multibeam cladding support fixed to columns

Kalzip acoutic slab & top-hat section zone

Aluminium profiled soffit secured to cantilevered beam Rigid & fiber glass insulation used to fill voids

Ancon FHR Head Restraint for internal blockwork (either side of curtain wall void) fixed to beam 590

Roof soffit flashing behind rainscreen panels Rain Water Pipe secured to columns

Roof

Kalzip ST clips with thermal barrier fixed to top-hat sections

Kalzip perforated steel structural deck fixed to purlins

PIR Board Insulation & Air Seals to maintain thermal integrity. Polyuethene spacers to be used on fixings to steel

12250 Steel L Angle fixed back to main columns for mullion fixing plate, and additional cladding support Kingspan Thermastone Rainscreen Cladding Panels - Volcado Honed finish Armstrong 'Silhouette' suspended ceiling Kingspan Thermastone Rainscreen Cladding Returned opening panels

Roof - TOS 11785

Technal MX Curtain Wall mullions. Head units to provide flashing to stone cladding sill. High-spec double glazed panels to 'window' sections

GE Lighting 'Lumination' 1200x600mm recessed LED luminaires

+68.300

75

3. Roof Junction 1 : 10 4000

3 A102

Kingspan FDEB raised access floor system

2700

Rockwool FIREPRO SP Fire Barrier fixed to edge of floor

160mm Service Void Bison 200mm hollowcore floor planks

4200

975

200

160

+66.500 122

Natural stone cladding above this point

40

First - FFL

1st- TOS 3800

200

+65.400

467

Ancon Optima masonry support @ 500 centres for external brickwork at high level. Fixed through thermal spacer to additonal steel plate

400

8250

+65.600

38

110

162

Second - FFL

Additional support brackets for vertical curtain wall mullions where required Further insulation behind fenestration panel if required

2nd - TOS

Ancon FHR Head Restraint for internal blockwork (either side of curtain wall void) fixed to beam

Curtain wall fenestration panels to hide floor structure

295

258

762

7850

762mm deep structural steel beams to SE specification. All steel elements above ceiling to be intumesant painted for fire protection.

50

+64.250

188

138

Kawneer style solar shading brise soleil fixed into vertical curtain wall mullions

Armstrong 'Silhouette' suspended ceiling

4050

Technal MX Curtain Wall mullions. High-spec double glazed units to 'window' sections & insulated anodized fenestration panels in-between Gyplyner 'ENCASE' Column Encasement

3650

2 A102

GE Lighting 'Lumination' 1200x600mm recessed LED luminaires

2. First/Second Floor Junction

2700

Double glazed curtain wall 'window' panel

975

2 A102

1 : 10

Curtain Wall mullion fixing plate mounted to steel L-Angle - Two 3rds bearing Technal MX Curtain Wall Mullions. Base unit to provide flashing. High Spec double glazed panels at 'window' locations.

First - FFL

Chamfered Bricks to border of curtain wall

40

+61.550 56

160

400

200

+61.350

200

200

PIR board & rockwool insulation packed between mullion and cavity

4200

Steel L-Angle for mullion support fixed to columns. Insulation packed between support elements and mullions.

Ancon wall tie between brickwork and blockwork

1st- TOS

Top Grade Red Clay Bricks to Exterior

AC vent & ductwork to M&E specialist specification

762

3800

100mm Kingspan Rigid Insulation

Ruskin Air Management AC diffuser

Solar shading brise soleil fixed into curtain wall mullions

140mm Thick Hollow Core Concrete Filled Masonry Blocks

138

DPC

Kingspan FDEB raised access floor system (based on 4kN/m² loading)

12.5mm Dot & Dab Plasterboard Finish to Interior

50

+60.200

140

2 Layers Gyproc FireLine 12.5mm Plasterboard Column Encasement

12.5

Service Void

40

102.5 50 100

Ground - FFL

GROUND

3650 2700

210

25

300

65

500

0 300

1 A102

160

4050

150

Line of DPM 65mm Floating Screed Celotex FR5000 rigid insulation

1050

975

Concrete ground floor slab Steel Reinforcement to Filled Blocks Foundation to SE specification

Key Section 1 1 : 20

500

300

1. Ground Floor Junction 1 : 10

25

+57.300

210

0

300

GROUND

75

+57.350

150

65 160

+57.500

Ground - FFL

Rev. A B

Description Junction Details Completed Roof Components & Eaves Detail Completed. Other Details Amended

Date

PROJECT

CLIENT

ARC505 - Bagstock Bricks

16/03/2014 12/05/2014

Date

30/12/2013 SHEET

Key Section & Junction Details

Drawn by

JC Checked by

VB/JM

Bagstock Bricks Project number

ARC505 DRAWING NUMBER

A102

Scale (@ A1)

As indicated REV

B


00 Ground Floor

5

3

B

7

1 : 100

5000

4990

10

6900

4230

0 190

To acheive typical Airbourne Sound Insulation (dB DnT,w) of 47 + 60min Fire Resistance

1590 0 189

2000

2500

2000

845

Fire Escape / Secondary Staff Entrance

0 319

0 914

955

1750

390

1510

3535

2000

180

0 237

1 : 200 Local Concrete Foundation to Lift Pit

E UP Nurse Intrvw. 8 m²

1200

20 m²

Store

16 m² 24 m²

12 m²

0 101

1910

12 m²

1500

Nurse Consult.

Rooflights above

1010

A

0 636

1010

16560

300

1510

1010

2550

1010

8355

F

1010

Patient Signage 1010

1010

0 101

G

685

0 146

0 101

1010

1500

0 101

+ U-Value of 0.35W/m²K + 60min Fire Resistance

6 m²

Staff Entrance / Fire Escape

WC - Spec. 4 m²

Cleaner / Plant 16 m²

1895

Double Height Atrium Zone

2400

5 187

Children's Area

395

1835

WC - Access.

0 892

0 150

4 m²

Reception

Waiting

25 m²

Glulam Beam Overhead to assist large span

26 m²

Covered Entrance to Muli-Purpose Room

0 101

WC 2 m²

7180

1815 1895

6755

640

Quiet Space

810

115 m²

A-03 10 m²

Corridor - Ground

16 m²

B

WC - Corridor

0 150

700

GP Consult.

A2

1010

0 101

0 549

Multi-Purpose 47 m²

1500

Indoor Tree Feature to double height space GluLam frame to support atrium roof

1500

300

5 364

6980

2 m²

810

WC

1300

0 410

16 m²

5 439

5 911

0 101

GP Consult.

1325

1010

1010

H

0 414

1010

1050

3001010

GP Consult.

Pharmacy

Lobby

48 m²

12 m²

4110

45 m²

2535

Waiting

3860

16 m²

Pharmacy Entrance close to car park and pedestiran route Automatic Opening Doors

1 : 200

A1

Protected Stair Core = 120mins Fire Resistance

To Assembly Point in Car Park

3095

FD60s

13000

GP Treatment

GP Consult.

4230

24 m²

16 m²

0 324 0 138

FD45

6

External walls: - Brick / Block plinth to base - Rockwool 'Rockpanel' Timber Effect cladding to parapet - Cladding rails fixed back to Structural Insulated Panel (SIP) - 172mm Kingspan TEK SIP inc. 142mm Rigid Insulation - 25mm Timber battens fixed to internal SIP facing board - 15mm FireLine plaster board layer + skim to internal finish

C

GP Consult. 16 m²

Automatic Opening Doors to Main Entrance

B

FD45

7

8

9

10

All External Walls to acheive 60mins Fire Resistance.

6 m²

FD45

FD45

Reception 25 m²

26 m²

WC FD45 2 m² FD45

FD45

FD45

35m

0 150

0 150

38m

FD45

16 m²

FD45

WC FD45 2 m²

FD45

GP Consult. 16 m²

A-03

NOTE: Maximum Travel Distance @ Ground Level with Multiple Escape Routes = 45m

Sluice FD45

36m

Cleaner / Plant

3 B

24 m²

FD45

FD45

FD45

16 m²

FD45

FD60s

Waiting

1 : 100

20 m²

115 m²

A-03 GP Consult.

5

Stairs

Corridor - Ground

+ U-Value of 0.35W/m²K + 60min Fire Resistance

01 First Floor

FD45 FD45

30m

24 m²

FD45

FD45

1500

4

920

1514

Nurse Treatment Nurse Treatment

Waiting

FD45

GP Consult.

FD60

Multi-Purpose 47 m²

FD45

FD45

FD45

45 m²

GP Consult.

Low Level Roof

FD60

Protected Stair Core to acheive 120mins Fire Resistance (Double layer Fireline Plasterboard to both sides of Kingspan 172mm TEK SIP)

4 m²

Brickwork Pillar feature to entrance

925

10 m²

11240

8 m²

945

WC - Access.

To acheive U-Value of 2.2W/m²K

5960

2770

UP

WC - Corridor

High Level Curtain Walling to South facing consultant rooms

945

24 m²

4 m²

6205

GP Trainee

Farthest Point from escape

WC - Spec.

0 186

900

5 151

J

12 m²

0 220

Nurse Intrvw.

12355 1050

1260

7300

Nurse Consult.

630

16 m²

12 m²

GP Consult.

5 115

0 862

Curtain Walls: - Fixed to Kingspan TEK SIP system - Shueco or similar aluminium system, powder coated RAL 7013 - Brown Grey - Pilkington Optitherm double glazed units, using Suncool panels to reduce solar gain where required

Fire Strategy Ground

Nurse Consult.

0 138

16 m²

Sluice

1500

GP Consult.

24 m²

1010

1500

Nurse Consult.

Nurse Treatment

24 m²

External walls: - Brickwork plinth to base - Rockwool 'Rockpanel' Terracotta cladding to eaves - Cladding rails fixed back to Structural Insulated Panel (SIP) - 172mm Kingspan TEK SIP inc. 142mm Rigid Insulation - 25mm Timber battens fixed to internal SIP facing board - 15mm FireLine plaster board layer + skim to internal finish

1700

24 m²

5 136

Nurse Treatment

2675

GP Trainee

1010

GP Treatment

1010

GP Consult.

300

0 334

5420

Stairs

Inverted Conctrete T-Beams spanning between Foundational Ground Beams

2000

710

A-03

Concrete Pile Caps & Ground Beams

250

0 354

1

1460

1750

2730

195

Below Ground Level Structure

D

0 190

2

To acheive typical Airbourne Sound Insulation (dB DnT,w) of 47 + 60min Fire Resistance

0 874

9

0 138

Internal walls (standard): - 70mm GypFrame 'C' studs @ 600mm centres - 25mm Isover Acoustic roll between studs - Double layer of 15mm SoundBloc plaster board + skim to internal finish

Internal walls (structural): - 142mm / 172mm Kingspan TEK SIP (to Structrual Engineers requirement) - Double layer of 15mm SoundBloc plaster board + skim to internal finish

8

A-03

16 m²

Lobby

Pharmacy

12 m²

48 m²

FD60

16 m² Boundary of Light Well through centre of Building

FD60

D

2 835

2000

985

2000

515

2620

3870

2000

1010

2000

485

2000

1000

2000

510

E 1290

805

Green Roof: - Extensive Sedum Green Roof & Gravel Border - Filter Fabric & Cellular Drainage Control Layer - Tanked via Polyroof liquid applied water proof membrane over 100mm Kingspan Thermaroof Rigid Insulation - Based on Comflor 80 Composite Concrete Slab fixed to SIPs

1010

Records

37 m²

37 m²

High Level Windows sized to fit with RockPanel Cladding Units

1000

Fire Strategy - First

480

1500

1500 900

Admin

6945

1010

24 m²

1200

Disabled Refuge

16 m²

A

3275

5375

Farthest Point From Escape 1

F

1210

2790

1800

Rooflights Above

Staff Meeting

1 : 200

2000

Staff Common

1800

1

5190

3200

4055

1650

2000

To acheive U-Value of 0.25W/m²K

5380

Farthest Point From Escape 2

Store

FD60s

18m

WC: M

1010

3 m²

FD45

2400

2995

2000

3665

FD45

WC: F 4 m²

8 m²

FD45

FD45 FD45

Manager 17 m²

Sppt. WC: Access.Nurse 8 m² 4 m²

Manager 17 m²

2590

1465

B

Glulam Structural Componenets with inherant 60min Fire Resistance

Store

1400

4 m²

4 m²

1625

WC: Access.

WC: F Glulam Structure to support Atrium roof

Nurse Sppt. 8 m²

2965

12240

4510

810

A2

FD45

FD45 17 m²

1010

1570 min.

3500

FD60s

A-03

Protected Stair Core to acheive 120mins Fire Resistance (Double layer Fireline Plasterboard to both sides of Kingspan 172mm TEK SIP)

FD45 FD45

34 m² 810

2155 6590

7055

7055

16m Mezzanine

1010

Maximum Travel Distance @ 1st Floor Level with 1 Escape Route = 18m All External Walls to acheive 60mins Fire Resistance.

Corridor - First

16 m²

3 m²

Atrium over Reception & Waiting Areas Glazed on 2 Sides

37 m²

8 m²

3780

Staff Meeting

WC: M

8 m²

37 m²

FD45

3665

WC - Corridor

Records

WC - Corridor

8 m²

17 m²

1010

Admin

FD45

1500

Corridor - First

7090

24 m²

5000

34 m²

Staff Common 2265

1210

Mezzanine

5955

NOTE:

Disabled Refuge

G

1010 1010

1010

1500

870

6000

3490

5880

H 4895

2000

1500

2000

1095

Low Level Roofs: - 129mm Kingspan TopDek KS1000 TD Composite Roof Panels, "Lead" look panels to slight fall - Fixed through to Timber Rafters - Bullnosed Aluminium Fascia powder coated to match roof panels

A1 A-03

To acheive U-Value of 0.25W/m²K

J

Fakro DMF Roof Windows

PROJECT

C

Curtain Walls: - Fixed to Kingspan TEK SIP system - Shueco or similar aluminium system, powder coated RAL 7036 - Platinum Grey - Pilkington Optitherm double glazed units, using Suncool panels to reduce solar gain where required To acheive U-Value of 2.2W/m²K

Timber Feature Shading Elements to South Facade of Atrium

4

6

Curved Entrance Lobby Roof finished in Semi-Polished Copper Sheeting

B A-03

In-Board Gutters to Internal RWPs

CLIENT

St. Mary's Healthcare Centre SHEET

Floor Plans

Southampton Solent University

Date

Project number

Scale (@ A1)

14/01/2016

ARC600

As indicated

Drawn by

DRAWING NUMBER

JC Checked by

SR

A-02

PAGE

2


1

Green Roof Parapet 1 : 10

Green Roof Abutment

3

1

Eaves Detail

5

1 : 10

10

1 : 10

4

Polyroof Pre-Formed Trim Flashed over Polyroof Waterproof Coating to minimum height of 150mm Aluminum Coping to Roof Parapet powder coated RAL 7013 - Brown Grey

Aluminium Soffit and Copper look Bullnosed Facisa Flashing fixed to Steel Support

Kingspan Topdek KS1000 TD Composite Roof Panels Site Welded Side Lap

Extensive Sedum Green Roof Topping & Gravel Border

PIR Insulation to Flashing between Roof Panels and Fascia

Self Coring Fasteners

Polyroof 185 Liquid Applied Waterproof Membrane System

100mm Kingspan Thermaroof Rigid Insulation over Vapour Control Membrane

Aluminium Flashing to edge of Curtain Wall Void Fakro DMF Roof Window, manually opened for localised ventilation / cooling U-Value 2.2

152

Polyroof approved Plywood Sheathing Board

Rockpanel Timber Effect Cladding Panels

91

Cellular Drainage Control Layer

Rockpanel Terracotta Effect Cladding on Timber Battens 10 62 15 112 15 15

Steel Eaves Support fixed back to SIP

150

Gravel Border to Green Roof to assist storm drainage

Neuchatel Green Roof Edge Outlet to RWP concealed in wall cavity

01 First 3000 25mm Tolerance Gap between Support and Composite Slab Filled with Rockwool Firepro Cavity Barrier

Rooflight Void

Timber Rafters fixed to SIPs and Glulam Structure

Kingspan TEK 142mm SIP + directly fixed Single layer Acoustic Plasterboard

Eaves 6520

15

Armstrong Silhoette Suspended Ceiling System

Exposed Glulam Beam supporting Kingspan TEK 142mm SIP

25

East Wall Section 1 : 50

10

139

415

165

10 Rockpanel Terracotta effect cladding panels fixed back to SIP

25mm Timber Battens

5 A-04

Ventilation Profile

Kingspan 172mm TEK SIP

Additonal Cold Rolled Steel Elements to form floor edge & Rooflight Upstand

Curtain wall / Window void preformed into Kingspan TEK SIP

Comflor 80 Concrete Composite Roof Slab

Aluminium Flashing Element to window head and cladding void

Eaves

Armstong Silhoette Suspended Ceiling System Hung from Comflor Metal Deck

6520 15

15 25

15

165

10

1 : 10

Cladding & Ground Floor Junction

Sheet Carpet over Isocheck acoustic underlay to Admin areas

1 : 10

Comflor 80 Concrete Composite Floor Slab supported on SIP + Additional steel L-Angles

01 First

17

6 A-04

25

01 First

Additional cold rolled steel elements to form floor edge & support insulation infill

140

Shueco or similar aluminium system, powder coated RAL 7013 - Brown Grey

SIP Baseplate fixed to Soleplate element

23

3000 Aluminium Flashing Element to Curtain wall Void

142

Porch Soffit

6

3000

15mm Soundbloc Plasterboard to internal finish

169

25mm Timber Battens

16

PIR Insulation Board to window edge

Rigid Insulation infill to prevent cold bridge through soffit void

Aluminium Soffit Flashed to cladding void

172mm Kingspan TEK SIP RockPanel Timber Effect Cladding (Ceramic Oak Colour) 10

160

15

15 142

7 A-04

15 25

Karndean Loose Lay Vinyl Flooring over 23mm Isocheck Acoustic underlay 65mm Screed Floor Topping

00 Ground

Vapour Control Layer

0

Mineral Wool Batts Insulation to Soffit Void

Pistol Brick supported by steel LAngle fixed back to SIP

Cladding Bracket fixed back to SIP

Aluminium Flashing lapped to Curtain Wall mullion capping

50mm Kingspan Thermaflor Rigid Insulation Continuous DPM lapped with DPC

50 15

190

440

500

Side Laid Dense Blockwork to form lip for beam & block floor 50

Stainless Steel Wall Ties

Ground Floor

172mm Kingspan TEK SIP

1 : 10

Open Perpends to Ventilate & Drain Cavity (1500mm Max. Centres )

Inverted Concrete T-Beam and Block Suspended Ground Floor

Rigid Insulation infill to prevent cold bridging

00 Ground 0

Key Plan

190 225

External Walls to be Centered on Ground Beam to SE specification

215

Periscope Under Floor Ventilator

7

100

100

Dense Blockwork 190mm Minimum to support 172mm SIP

103

150

225

Insect Guard to Vented and Drained Cavity

15

Yellow / Cream Stock Clay Brickwork (stack bonded)

100

SIP Bottom Plate 40x172mm Treated Soleplate

142

75

0

50 65 26

00 Ground

50 15

225

Kingspan Nilvent Breather Membrane Lapped over DPM

150

2

15

15mm Soundbloc Plasterboard

Services Void

Aluminium Flashing element fixed back to SIP and lapped to mullion capping

Aluminium Flashing to Soffit & Cladding

140

30 25 25 102 10 5 70

Polyroof Waterproof Coating Lapped behind Cladding

Dense Blockwork 190mm Minimum to support 172mm SIP Periscope Under Floor Ventilator Side Laid Dense Blockwork to form lip for beam & block floor

3 Pile Foundation and Pile Cap to SE specification

5,6 & 7

N

1&2

PROJECT

CLIENT

St. Mary's Healthcare Centre SHEET

Construction Details

Southampton Solent University

Date

Project number

Scale (@ A1)

14/01/2016

ARC600

As indicated

Drawn by

DRAWING NUMBER

JC Checked by

SR

A-04

PAGE

4

Jay Clancy - Work Examples  

Examples of my work as an Architectural Technician from both professional practice and University.

Jay Clancy - Work Examples  

Examples of my work as an Architectural Technician from both professional practice and University.