Improved Integrative Design Process - Senior Architectural Design Project 2

Page 27

The access for the garbage track is set be on the open grid pavement at the south direction of the site which get a multiple benefit that reduce hard-scape on-site and increase vegetation since it only meant to be an access for the track in a specified period of time during the day. On the west belt of the site, the site is designed to provide a walkway with a retail spaces on a side that gives more special feature which may attract non-building users to the site.

27


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.