Samsung Wall Display Style Guide 2010

Page 1

Samsung Texas Construction Inc Style Guide 2010

Samsung Texas Construction Inc. | 12100 Samsung Boulevard, Austin, TX 78754-1999 STCI of Austin


Style Guide 2010 Standard typography guide

HEADING 1 (96 pt)

1 2 3 4 5 6

HEADING 2 (84 pt)

1

This is a Subheading for Heading 1 that can extend to be multiple lines if needed be or can be contained in a single line. This is a Subheading for Heading 2 that can extend to be multiple lines if needed be or can be contained in a single line.

HEADING 3 (72 pt)

This is a Subheading for Heading 3 that can extend to be multiple lines if needed be or can be contained in a single line.

Heading 4 (60 pt)

This is a Subheading for Heading 4 that can extend to be multiple lines if needed be or can be contained in a single line.

Heading 5 (48 pt)

This is a Subheading for Heading 5 that can extend to be multiple lines if needed be or can be contained in a single line.

Heading 6 (36 pt)

This is a Subheading for Heading 6 that can extend to be multiple lines if needed be or can be contained in a single line.

STYLE GUIDE PAGE HEADING heading for Style Guide Headings

This is an inline Sub-

Use case (Heading 4) With Subheading 4 text below

Section 1.1 This is the description of the section This is standard paragraph text. Anim eatur sedipsae eosam, consequi alit ipit vid magnime officipit dit hil mi, sectios magnit que vit hit el modi nem ut parchicium recestios ut occaeratio beaturia non pario officilitat iur. This is an example of a bulleted list • Item 1 • Item 2 • Item 3 This is an example of a numbered list 1. Item 1 2. Item 2 3. Item 3 Xim facerem faci aut ex ex excepro remodis adis mi, comnihicatio quiam fuga. Et qui unt omnihit fuga. Ut quibus velit laborum ressim nit, simagnit liquae ex es dolorepro tem eum antur?

Samsung Texas Construction Inc. | 12100 Samsung Boulevard, Austin, TX 78754-1999 STCI of Austin


Style Guide 2010 Standard layout guide 32 in 1 in

1 in

Layout & placement of elements on the page

24 in

1 in

The Grid System

This document outlines the 20 column grid system for a work surface of 32” x 24” (W x H). Page margins are set at 1” on top, left and right, as well as 1.5” from the bottom. 1.5 in

There are 19 x 1/4” gutters between each of the 20 columns. Consistent with the gutter spacing between columns, white space between page elements should be set at 1/4”

Main Page Title Here

minimum.

Subtitle here if there is additional description necessary Section 1.1 This is the description of the section

Figure 1.2 Grid System Layout Example

1.1a New STCI headquarters Nequide aut occum qui repelicab id quis ipsum iunt quiae. Ilitatis re sit, sa none porrore site officae ommoluptur aspersp.

To the right is an example of a page layout using both the typography style guide as

1.1b Samsung night life Ilitatis re sit, sa none porrore site officae om-

well as the 20 column grid system for layout. All images, text, and other visual elements

moluptur aspersp.

1.1c Latest in SSD technology

should appear in line with the 20 column grid system.

Ilitatis re sit, sa none porrore site officae om-

1.2 Grid System Layout Example

moluptur.

1.1d Underneath the design Nequide aut occum qui repelicab id quis ipsum iunt quiae. Ilitatis re sit, sa none porrore site officae ommoluptur aspersp.

1.1e Dubai construction day 246 Ilitatis re sit, sa none porrore site officae ommoluptur aspersp.

1.1f Twin towers at night Ilitatis re sit, sa none porrore site officae ommoluptur.

Samsung Texas Construction Inc. | 12100 Samsung Boulevard, Austin, TX 78754-1999 STCI of Austin

Samsung Texas Construction Inc. | 12100 Samsung Boulevard, Austin, TX 78754-1999 STCI of Austin


Standard Process For Hot Work

1

1.1 Submit HOT WORK PERMIT

Document Control

• Submit # days prior to hot work.

Permit Submission and Work Plan

• Describe location and panel indentification • Labor / Day / Time 1.3 SAS HOT WORK Form

1.2 Confirm Work Plan

1.1 Hot Work Permit

2

1.2 Confirm work plan by STCI • Get approval from team leader and project manager

1.3 Fill out SAS HOT WORK form & get approval • Choose SAS safety personnel

Site Control by SAS / STCI Contract Work Supervision and Oversight

2.1 Review HOT WORK activity with STCI, SAS, and performing contractor • Review pre-task plan • Warning tape barricade 2.2 Checkout Tools

2.2 Check out tools • Designated tools

2.3 Inspect insulation around work space 2.1 Review Hot Work activity with STCI, SAS, and Performing Contractors

2.4 Strip Cable

2.5 Cable Pulling

2.6 Cable Termination

2.7 Remove all Items

2.3 Inspect

2.8 Clean up

• Insulate switchgear and panel interior with rubber blankets.

2.4 Strip cable and apply heat shrink 2.5 Cable pulling 2.6 Cable Termination 2.7 Remove all items related to HOT WORK 2.8 Clean up and completion Samsung Texas Construction Inc. | 12100 Samsung Boulevard, Austin, TX 78754-1999

STCI of Austin