Issuu on Google+


0 timeline 1 space 2 in between 3 interpolation 4 bivak 5 house 6 collective housing 7 landscape design 8 school 9 oďŹƒce building 10 city planning 11 technology park 12 faculty 13 beach pavilion


0

Timeline

Iva Radoš ević 1991

the little right hand of my mom, a photographer, and dad, a construction company director

drawing the hell out of paper

2006

debate club Supetar Film Festival, workshops coordinator

organising “design + architecure” exhibitions at college

working at “7m2” an interior design studio buying bread from a horrible law declared in Croatia that obligated every single house without a building permint to be architecturaly recorded. it’s over, we survived.

born, Zagreb

Mathematical and computer science Highschool, Zagreb works at a Lush Cosmetics store, not quite irrelevant, they taught me how to sell things

2010 2011 2012

Architecture and Urban Planning Faculty, Zagreb Architectural Design 1 Architectural Design 2, Juraj Glasinović Studio 1 [ House] Lenko Pleš tina, Ivana Ergić Studio 2[CollectiveHousing] , Ivana Ergić

2013

Studio 3 [ Elementary School], Mia Roth Čerina Studio 4 [Office Building] , Sonja Tadej

reads S M L XL; restored hope biked 700 km from Zagreb - Motovun - Šibenik - Split - Island of Brač

internship at STUDIO UP, Zagreb Competition Prize for Faculty of Organisation and Informatics, Varaž din

designing Firefighters Centre on Long Island, near Zadar, Croatia

now

competition win for the Beach Utility Pavilion, Iva Radoš evićand Iva Gotovac


1

f acul t yofar chi t ect ur ez agr eb/ar chi t ect ur aldes i gn1/aut umn201 0

Spac e Thev er yfir s tas s i gnmentwehav e ont hefir s ty eari sol d,bas i caland br i l l i ant .3panel s( t wo4x 3m,one 2x 3m)ar r angedona1 0x 1 0 s ur f ace.cr eat es pace!

CONCEPT

TASK

Any whe r e

Thes mal l erpanelwi l lat t r act and pot entcur i ous nes s ,t wo bi ggerpanel swi l lpr ov i det wo ambi ent s : one s af e and s oot hi ng embr aced by t he oanel s ,2mor edy nami c“ out s i de”oft hem

FUNFACT ihadnoi dea whatwasidoi ng.


2

status quo I ja sam iva, imam 22 godine i imam psa Lalu i htjela bi ić i u školu u R faculty of architecture zagreb / architectural design 1 / autumn 2010

Inbetween Anywhere

We had one motnh of work based on three words “create a space between” . No location, no users, no function, just space.

simply, i decided to create a space of “stay” between two spaces of “movement” using the most simple means : height of the rooms, and carving the walls and cealing to provoke either movement or stagnation.


3

faculty of architecture zagreb / architectural design 2 / spring 2011

Interpolation

CONCEP T

TASK

Anywhere

In a 10m wide space between 2 old building interpolate a student club, respect the heights of lateral building but accent the entrance.

space split in two parts, each rotated and nivelated to produce a dierent ambient on each oor.


4

facu lty of arch ite ctu re zagre b / arch ite ctu ralde s ign 2 / s pring 20 11

Bivak [space for temporarily stay in nature] cre ate a space for spe nding tim e in th e nature by avoiding big inte rve ntions on th e e xisting e nvirom e nt

C O N C EPT

TASK

Martinska, Ĺ ibenik, Croatia

3 m utual y inde pe nde nt e q uilibrum s are place d on a top of a rock ne ar th e tow n of Ĺ  ibe nik


Plus/Minus House Zagreb, Croatia

in th e be autifullandscap e in th e north e rn p art of Zagre b, “on th e h ill ”m ore p re cise l y unde r th e h ill of Me dve dnica de sign a fam il y h ouse , custom im aginary use rs.

C O N C EPT

TASK

5

facu lty of arch ite ctu re zagre b / p roje ct s tu dio 1 / au tu m n 2 0 11

cre ating 2 differe ntsp ace s :one p e rcie ve d as ne gative one as p ositive . th at e ffect is ach ie ve d in p lan by de nsity of e ve nt, and in th e se ction litte ral y by addition or de duction ofsp ace , w h ich cre ate s a h e te roge ne ous h om e .

1/10


6

facu lty of arch ite ctu re z agre b / proje ct s tu dio 2 / s pring 20 12

Collective housing

TASK

propose a ne igh borh ood de sign and w ith in de sign coll e ctive h ousing.

C O N C EPT

Zagreb, Croatia

as th e site h as a dom inant ch aracte ristic, and th at is th e stre am w h ich flow s th rough th at inde ve l ope d are a, allbuil dings are orie nte d so th e flow tow ards th e stre am is not in q ue stion.

ground plan

north fascade

spe cifi c floor

ground plan

south fascade


sm allat livingroom + 1 room

big at livingroom + 2 room

variations

variations

se ction in proce ss

m ode l


Landscape design Zagreb, Croatia

Th e site is l ocate d on th e nortw e stpartofa bigge r unde ve l ope d are a on th e e ast part of Zagre b. W h at de fi ne s th is h uge are a is th e stre am :for w h ich ipre dict w illbe te base for alloth e r ne igh borh oods th at w ill ape ar. Allth e future ne igh borh ood w ill th is landscape arte ry.

Th e ne igh borh ood w e alre ady de signe d w ith in th e studio for col l e ctive h ousing, th e task give n is to de sign th e landscape to e nh ance th e q uality oflife w ith in.

TA S K

7

facu lty of arch ite ctu re z agre b / lands cape de s ign s tu dio / au tu m n 2 0 12

So as it is obvious th e are a ofth e stre am is going to be popular, it is im portant to provide good conne ction tow ards th is canalscape .

canalscape contains the stream and the sidewalk and is surrounded by natural vegetation. root is a walkway which penetrates into a developed lled space. it does not subordinate to the regular grid of the neighborhood and acts like a real root. this concept supports the idea that people are the water tthat needs to be brought to the canalscape. “the living room” is a space very connected to the uterly resiental buildings, it has a dynamic character because it accepts a spectrum of events. the surface is treated with denivelations because every denivelation accepts a diferent content. “the node”

conceptual plan

is a space very connected to the buildings that have a social and a commercial function in the ground oor. that space is treated with different surface materials to achieve a more static pleasent ambient. “the camou age”

this is a pile of trees infront od the east fascades of the building in function to make the neighborhood look more messy and natural from the side of the canalscape.


b-b /north - south/

a-a /west - east /

residental building

residental building

grass asphalt

grass gravel

concrete covering arish walkway

arish walkway asphalt

rubber paving

water

graniter paving garbage management wooden denivelations

“the living room” detail

“canalscape” detail residental building concrete covering grass asphalt rubber paving granite paving arish walkway

“the node room” detail


8

status quo I ja sam iva, imam 22 godine i imam psa Lalu i htjela bi ić i u školu u R faculty of architecture zagreb / project studio 3 / autumn 2012

Elementary school Horvati, Zagreb

Elementary school with differenced areas for 1. -4. grades, and 5-8. grades. The site is 3x smaller than the standards, but you’ll make it. 2.THE SECTION l ower graders are left on the ground floor to be closer t the open class spaces. the small site caused high grades to be elevated. they also have a spatial scenography : a slope that creates a special ambient.


Rotterdam


9

status quo I ja sam iva, imam 22 godine i imam psa Lalu i htjela bi ić i u školu u R faculty of architecture zagreb / project studio 4 / spring 2013

Offi ce Buildin g

CONCEPT

Bundek, near main axis of Zagreb Building for audio-visual production is planed on a site that yet has no developed building and is in a sensitive area on the Zagreb axsis which is the reason for its neutral appearance. On the inside it has “the core” that has a special tretment on every floor.


Rotterdam


City Planning Zagreb, Croatia

the west part of city of Zagreb has a undevelped area that has a south - north missing link, a conflict situation of residental and industry character. Plan that new city area.

RESIDENTA L SELL

PRODU CTION

PA RK

COLLEG E EXPO

PA RK

problem s

pos ibilities

realization

1_bad connectioninthe

1_creating

1_planed recreationalzone onthe riverSava

w illg et a new road to feed that area carg o term inals into fu rnitu re m anu factu ring 3_w es t fas cade : m erchendis ing / eas t fas cade: colleg e ans ocialpu rpos e 4_indu s trialins u la incooperationw ith colleg e fas cilities 5_”horizontal” roads provide events w hich create s ocialm obility

K

2_convers ionofexis ting

PA R

the pos ibilities ofprodu ct des ig n 4_s tate level_recession_ ins u fficient produ ction 5_des ig ns tu dies does not have a indiidu albu ilding

ing the indu s trial character into s om ething pos itive 3_w es t part ofZag reb is already k now as the place to g o s hoping 4_s am e place forfu rnitu re m erchendis ing and produ ction 5_s ocialm obility inthe eas t-w es t direction: s tu dents -m erch + res idential-produ ction

M RE ERC SI H DE EN NT DI A L SE SO CI AL

3_indolenting

2_trans form

nort road. a s ou th-

IN DU ST RY PA RK

s ou th direction north2_indu s trialcharacterw es t part ofZag reb is too dom inating

RESIDENTA L

RESIDENTA L INDU STRY

INDU STRY

TASK

10

faculty of architecture zagreb / city planning / spring 2013


roads

state property education buissines+residental

sports

public industrial

recreation

private

commercial

faze 1 main road, college, industry

faze 2 industry north, creation of the main road facade

faze 3 main road facade towards the south, spreading to south, tourism

faze 4 recreational area near the river of Sava


11

inte rns h ip at STU D IO U P arch ite ctu re Zagre b / au gu s t 20 13

Vuč evica, North from Split, Croatia

Propose a de sign for th e ce nte r buil ding of th e future scie nce and te ch nol ogical park north from city of Split , its future addition buil ding, and th e w h ol e m aste rplan of th at l ocation. Th e site l ocation is com pl e te y unde ve l ope d, e xce pt th e h igw ay th at goe s th rough th is alm ost m oon surface e nvirom e nt .

conte xt ‘0 ’ :10 0 % naturallandscape

conte xt ‘0 ’ :10 0 % naturallandscape

conte xt ‘1’ :th e ce ntralsink h ol e garde n

CO N CE PT

TA S K

Technology Park Masterplan Th e radialsh ape of th e ce ntralbuil ding k e e ps allof th e q ualitie s of th e ce ntralsink h ol e garde n, and m ak e s future additions possibl e . A pe de strian axsis conne cts all th e prod u ction/s cie nce /h ote l/s ports pavilions. .

pavilion ty pe structure s

th e pe de strian axis


13

“ce m e x” s tu de nt com pe tition /iva radoš e vić+ iva gotovac/ octob e r 20 13

Beach utility pavilion Adaptive to any beach location, Anywhere

1s t inde pe nde nt com pe tition 1s t priz e :D

D e s ign a pavilion th at e nab le s s h ow e ring, ch anging cloth e s , s torage of b e ach re q u is its , and s o on. Th e s pons ors for th is s tu de nt com pe titon is a concre te prod u ction com pany, s o th e tas k is to propos e a concre te s olu tion b e cau s e of its d u rab ilty.

long

cove

m od u larity

s lab 3 x 3 m accpe ts a s pe ctru m of fu nctions

variations

s h ow e rs | ch anging room s | s torage | h am m ock

low / h igh de ns ity

random de ns ity e ffe ct look s lik e a fore s t

ope ne d / clos e d

s k in provide s e as y ope n/clos e d m anu ou lation

trans form ab ility

e ve ry s e as on h as diffe re nt re q u ire m e nts

cape

rive r

am ou nt

adju s tab ility

com pactne s s


s u m m e r re gim e

w inte r re gim e


Iva radosevic portfolio