Issuu on Google+

IVAN HENRIQUEZ Master in Architecture 2012

AAU San Francisco, CA

School Projects

Spring 2010 - Spring 2012


IVAN TOMAS HENRIQUEZ

BIKE SHARING TERMINAL/ SOMA MOTEL Master in Architecture 2012

Fall 2010 / ARH 609 INTERMEDIATE DESIGN STUDIO 1 Similar to the previous experience, the initial step was the city analysis, by focusing in the study of locals favorites activities vs visitors most common attractions. With the collected data and discoveries of this two scenarios, the next step was to formulate an opportunistic connection with the city and the site conditions, with the objective to design a bike terminal and drive in motel, which promotes community activities like sharing rides or rooms exchange, based on the original program assigned. The design process was a series of exercises like: pattern exploration, flexible structure and envelope adaptation and finally model making. Ultimately, managing and playing with the chosen pattern( made out of plastic straw to bring up as many variations as possible), made possible flexible elements which defined the overall structural language of the form. HYBRIDIZE OPPORTUNITIES

PROGRAMMATIC DIAGRAM

ACTIVITIES SCHEDULE

BIKE-IN MOVIE THEATER

CAR DEALERSHIP

BIKE SHOP

CAR SHARING RENTALS

DRIVE IN MOTEL

RIDINGS RENTALS

ON

ESSI

CONC BOOT

20,125 SF

H

TICKE

OPEN 11:AM-4:30PM

OTH T BO

OPEN 24HRS

LOUNGE

8,150 SF

CAR RETRIEVAL AND PICK UP AREA

OPEN 7 PM-2AM

10,350 SF

RETAILS / GIFTSHOPS

RESTROOMS

DISPLAY KIOSKS

BIK

SEAT

AN

D SE

TICKETS SALES KIOSKS

4:30

OM

1:30

CUSTOMER ADVISOR OFFICE

SHIFTING CARBOOTH EXHIBITS

RO

11:15

OW

PM

RO

LOBBY

OM

S

SH

9:30

CUSTOMER ADVISOR OFFICES

BAR/

18 ROOMS ADMINISTRATION OFFICES

CO

STORAGE

FFEE

SNA CK PROJECTION SCREENING ROOM

STORAGE REPARING ROOM ADMINISTRATION OFFICES

8:30

4,750 SF

OPEN 24HRS

ES

IT

7:30

BIKES RETRIEVAL AND PICK UP AREA

RVIC

REST

HIB

AM

MANAGER OFFICES CONVEYOR

EX

SUPPLY STORE JANITOR/ MAINTENANCE

3,550 SF

TRIC BIK

ING

ATION KIOSKS VISITORS INFORM

6,750 SF

TERS / SCOO GWAY ES / SE

OPEN 8:AM-10:30PM

EC ES/EL

OPEN 7:AM-5:30PM

CUSTOMER ADVISOR OFFICES

AM 10:50

2:00

3:50

6:50


IVAN TOMAS HENRIQUEZ

CAR DEALERSHIP/BIKE IN MOVIE THEATER Car museum-Motel in San Francisco

Master in Architecture 2012 Fall 2010 / ARH 609 INTERMEDIATE DESIGN STUDIO 1 In this fantastic experience, i was able to learn a totally new design Tool out of the traditional design methodology. The first step was the analysis of the mixed program in other to create a Visual Narrative Diagram, fallowed by a Form Finding Catalog with the use of a digital morphology software (Auto Desk 3DMax). By extracting different factors and conditions of the site, in order to abstract spatial opportunities, was the main key of the alterations and variations of these series of forms. The complex and hybrid given program, promoted an interwoven masses which was based on the car and pedestrian circulation, leading the overall form.

PROGRAM NARRATIVE ve circ rtica ula ti

l on

cess lic ac

pu

bli

hotel rooms

N

breakfast/ snack room/ vending

DRIVE IN MOTEL

CA

internal landscape

US

dim

pe

public space

pool equipment room

swimming pool

restrooms (m/f )

M

front desk

pa

past

storage

ce

lobby

GYM

ical

future

vert

cafe/ seatings

sca

administration

EU

ev en ts

A

security room

nd

lockers (m/f )

RM

kitchen/ preparation/ /storage

c la

dim

B

pub

circ

RESTROOMS

outdoor sports

general storage /utility room

ion

ulat

present Exhibition Room 50 vehicles capacity

vertical circulation

lobby auditorium reception desk /ticket sales

workout shop / retail

coat check

restrooms (m/f )

ev en ts

SECTION

pa

ce

office /administration

Mechanical room

Lockers

storage

Janitor room

rn inte

copy room

Conference /room

restrooms (m/f )

a dsc

n

al la

private offices

restrooms (m/f )

pe

server /room

indoor sports

IV

office/administration

workstation

12 PM

IV A

TIME FACTOR /DAY/NIGHT

11 PM

night activities

IIIA 5 AM

6 PM

9 AM

morning activities 6 AM

24hrs complete

III

afternoon activities

scale FACTOR /dimension

m

24hr

rs

9h

l hote

eu

s

dimC

hrs

mus

dim B

18

e in driv

car

m gy

dim A

mid point flexible open

IA I

working hours

flexible close

12 PM

hybrid spaces

-I

dynamic space CONNECTION CIRCULATION

transparency

FORM FINDING CATALOG


IVAN TOMAS HENRIQUEZ

OFFICE AND RESTAURANT building in SF. Master in Architecture 2012

SUMMER 2011 / ARH 606 CONSTRUCTION DOCUMENTS

The design of a mixed use space (typical street level Restaurant and upper levels office space) was the first challenge, the process and execution of the Construction Documents was the real objective. This experience allowed me to know and apply the California Building code and accessibility compliance parameters.


IVAN TOMAS HENRIQUEZ

BUILDING FOR THE AGING In San Francisco Master in Architecture 2012

Spring 2011 / ARH 619 INTERMEDIATE DESIGN STUDIO 2

Exploded Axonometric

The goal was to solve the problem of building for the aging. The building itself is driven by the concepts of openly flow accessibility of the community into the building , in order to create a connecting the outside young professionals and inward senior citizens. It inspires the aging to come down from the comfort of their upper courtyard and residences on a daily basis, while simultaneously attracting the youthful foot traffic from the street simply through convenience.

Sun Court Yard Roof Top

fitting the program Projector Patio Open Theater

KEARNY ACCESS

MULTIPURPOSE ROOM MAIN KITCHEN PUBLIC SPACE

RECEPTION/ WAITING AREA SENIOR TRANSPORTATION

Perforated Facade Copper panels GIBB ALLEY ACCESS

BEAUTY SALON PUZZLE ROOM

PUBLIC RESTROOMS HEALTH CARE SERVICE GNRL STORAGE / LOADING DOCK ADMINISTRATION OFFICES

Street View Units

open flow diagram

LIBRARY / COMPUTER LAB. MEETING ROOM EXERCISE ROOM


IVAN

HENRIQUEZ

BUILDING FOR THE AGING IN SAN FRANCISCO Master in Architecture 2012

Physical Model

T SECTION

ASISTED LIVING STUDIO UNIT

INDEPENDENT 1 BEDROOM SHARED KITCHEN

ASISTED LIVING 1 BEDROOM UNIT

INDEPENDENT STUDIO KITCHEN

Main Looby

GROUND FLOOR / KEARNY STREET


IVAN TOMAS HENRIQUEZ

THESIS PROPOSAL Master in Architecture 2012

The

3rd

Interaction

to learn-play workspace San Francisco Officeschooling

Idea

Opportunity

With this reasonable solution working and educating is possible by the idea of the third interaction. This means that the need of both learning and working conditions would converge in the same enviroment by a playful element which is the facility itsef. It is an opportunity of finding a stable worklife balance in both parents who want to contribute in the family household .

Adopting the concept of homeschool, the Officeschool is an alternative solution for parents who already have chosen the home based learning method for their children. The officeschool would maximize possibilities of professional workspace environments to those parents who engage a fulltime family interaction in a setting outside of the home habitat.

THE LINK IS PLAY


IVAN TOMAS HENRIQUEZ

THESIS PROPOSAL SPRING 2012

San Francisco KID

The

3rd ADULT

Officeschooling

Learn-play

Interaction

work-play

Playful element

workspace to learn-play I’ve always been captivated with children’s fast and easy ability to learn; and it is a life dream for me to make a difference and impact a student’s life. The role of early education is critical to the development of intelligence, personality and social behavior. I believe I can use architecture as a tool to promote sensitive environments to inspire a child’s perception and learning opportunities. My intention for this thesis proposal is to generate an integrated program incorporating the workspace office with a shared learning environment for families who decided to homeschool their kids.


IVAN TOMAS HENRIQUEZ

THESIS PROPOSAL SPRING 2012

IVAN HENRIQUEZ

FINAL THESIS REVIEW USER PROFILE

student ID 03118620

USER GROUP ANALYSIS Imitation Variables action fallowed by reaction

simillar object or shape changing

Deformation is based on the proportional Scale

impulse reaction/ about energy

Imitation EPISODE 1.

Imitation EPISODE 4.

Object D.

Object M.

Object M.

Object D.

Mirror Mirror

75 % Deform

35 % Deform

Object D. 82 % Deform

Object M. 78 % Deform

Imitation EPISODE 7.

8.

Object M. 65%

Mirror

Object D. 20%

Kids Connected With Adults


IVAN TOMAS HENRIQUEZ

THESIS PROPOSAL SPRING 2012


Grad-School Portfolio 2012