MASTERS DEGREE PROGRAMME ARCHITECTURE STUDIO PROJECT SS 2017

e g d i r b t o o f

INSTITUTE OF STRUCTURAL DESIGN Graz University of Technology


TABLE OF CONTENT

I

Footbridge Lent-Tabor

5

II

Excursion Maribor

9

III

Projects

10


Merchant Square Footbridge Source: Knight Architects


footbridge LENT-TABOR

The Institute of Structural Design was pleased to introduce Martin Knight as the guest professor for the summer studio 2017. As an architect, he manages an extraordinary and successful ofďŹ ce for bridge design close to London UK. While looking for an appropriate design task, pedestrian and cycle bridges were seen as a ďŹ tting challenge.The chosen building site was in the city centre of Maribor. Maribor is close to Graz and this site was part of a former design competition. It is still highly relevant for the urban layout of Maribor. Footbridges highlight parts of the infrastructure and have a high relevance for the diversity of a city‘s road-system. Beside the structural challenge of footbridges, the limits of systems and materials lead to a deep and detailed design questions. Finally, the integral design process including the location, questions about technology and manufacture as well as the fruitful collaboration between the architects and civil engineers opend the door for outstanding projects.

5


Supervising Tutors BA Dipl. Arch. Martin Knight Univ.-Prof. Dr.-Ing. Stefan Peters Assoc.Prof. Dipl.-Ing. Dr.nat.techn. Andreas Trummer Ass.Prof. Mag.art. Dr.phil. Daniel Gethmann

Master Students Elonore Beranger Kathrin Bräuer Primoz Brglez Eleni Chatzatoglou Odile Doepper Theresa Rosina Fink Patrick Goldberger Ludwig Grimm Bernd Hausegger Bastian Lauchart Daniel Johannes MÜslinger David Ortner Bianca Paulitsch Anto Petrusic Alexander Pock Maria Frederica Puglia Doris Rainer Tanja Tamara Ringstein Sasa Sever Nelly Tsenova

7


EXCURSION MARIBOR


14

20

26

32

38


42

46

52

58

STUDENT PROJECTS


64

70

76

82

88


94

100

104

110

116


Otok Lamela Anto Prdrusic

1. CONNECTION from bank to bank on a lower level 2. „HYBRID“- BRIDGE, different use of the bridge at different times + day & night + Lent festival + winter - spring - summer - autumn 3. SOCIALIZE + the bridge should take part in the city life + different speeds, a possibility to rest and to enjoy the view

14


Exploded Assembly Drawing

Handrail 7 timber sheets

Wavebreaker

Timber

Structural System box girder with sheet steel 2 supports

15


Ground Plan & Section


17


Cross Section


19


River Sible Nelly Tsenova

1. Create a MAGNET/ATTRACTIVE FORCE to lead people toward the river and relocate the occupied public spaces 2. SHORTEN THE DISTANCE to the water/river, increase the experience e.g.: the bridge as a floating sidewalk 3. Use the POTENTIAL OF THE EXISTING FACILITIES force the exchange of pedestrians/circulation on the both sides of the river 4. BARRIER-FREE CONNECTION between the riverbank and the neighbourhood

20


Exploded Assembly Drawing

Stairs

Handrail Railing

Deck

Deck Construction

Deck Support Truss Beam

Joints Pillars

21


Ground Plan & West Elevation


23


Detail Truss

Deatil


Truss

1. Tube circular hollow steel section 500 x 30 mm 2. Tube circular hollow steel section 350 x 20 mm 3. Deck construction rectangular section 4150 x 350 x 20 mm 4. Deck wooden planks 4000 x 150 x 50 mm with integrated anti slip layer 5. Deck construction I Beam 70 x 10 mm 6. Light 150 x 20 mm 7. Base plate steel 200 x 20 mm 8. Railing stainless steel mesh 900 x 4000 x 2 mm 9. Railing construction steel 1200 x 80 x 10 mm 10. Handrail steel 4000 x 150 x 10 mm 11. Bench construction square steel section 550 x 80 x 20 mm 12. Bench construction wood 13. Bench deck wooden planks 2000 x 550 x 50 mm 25


The Swing Bridge Bianca Paulitsch

1. CONNECTIVITY | Lent-Tabor-Bridge The bridge should be more than a connection between two points. It should combine the bridge and the embankments as a whole system. These elements should ow together by an individual type of space. Improving the quality of the public space in Lent will make it even more attractive to the users. 2. A place to stay | DESTINATION Creating memories at the bridge by enjoying the view through the river and the embankments of both sides will be one part of the bridge. Giving it some additional functions and turning into a space where you want to go and not just a means of getting to the other riverside. 3. ACCESSIBLE and USEABLE for everyone Designing a barrier free access to the bridge should be one of the main aspects. Everyone should have the same possibility to experience such a signiďŹ cant place. The focus is on the human being and showing respect for each other. 26


Exploded Assembly Drawing

Spiral Ropes with Fork Connector

Steel Railing with Steel Ropes

Cantilever

Steel Ribs

Steel Box-Girders

Pylon Foundation

27


AN

Ground Plan & West Elevation


29


Cross Section Deck

CROSS SECTION DECK 1 2

3

7 8

4

9 5 6

1. Aluminium Handrail 2. Railing Posts of Flat Steel 20 mm with Steel Ropes Ø 6mm 3. Epoxy Pavement 5 mm 4. Concrete Slab 70 mm 5. Steel Box-Girder 20 mm 6. Stiffeners 20 mm 7. Spiral Ropes 60 mm 8. Fork Connector 9. Cantilever with weld steel ribs 20 mm 432

113

120

394


DETAIL 1 | PYLON 15

SECTION BASE

14

90cm

250cm

13

12

9 11

1.300cm

SECTION AT BEARING LEVEL

1

10

09

1. Pylon Steel Box-Girders 0.4 cm 2. Deck Steel Construction 113 cm 3. Steel Cleat 4. Steel Plate 200/380/20 cm 5. Foundation 250/470 /320 cm 6. Foundation Plate 350/730/100 cm 7. Bored Pile Ø 100 cm, L = 1000 cm

08

02

06

2.200cm

07

05

04

2

03

3 02

02

01

01

4

5

6 7

31


Footbridge Lent-Tabor Primoz Brglez

1. CIRCULAR MOVEMENT The idea from the beginning was to design a bridge with a seperate bicycle and pedestrian lane. The lanes should also be on different levels. 2. RELAXATION ZONES - NEW VIEWPOINTS OF THE MAIN BRIDGE An important point was also to have an area in the middle where people could stop, relax and enjoy the view of the old bridge, old town and the festival area. 3. MORE ACTIVITY POSSIBILITIES Multifunctional areas with greenery and benches.

32


Exploded Assembly Drawing

125 cm parapet

100 x 30 mm tropical hardwood ooring

Cantilevers and reinforced concrete deck for the bicycle path

Steel Girder with Studs

33


Ground Plan & West Elevation


35


Cross Sections


37


A Bridge Is A Journey David Ortner

The new pedestrian bridge has to be more than a simple crossing above the river Drava. It has to connect both parts of the city to bring Lent and Tabor closer together and activate the river sites. A path from the old town in the north to the green residential area in the south. To create new spaces the bridge has to organize the local situation and form an entrance situation on both sides. On the Lent side it will introduce the people to the new car free pedestrian promenade and in Tabor to the rural green park area. To get a new perspective of the Maribor, the bridge has to be a journey. A place where people can rest and enjoy the different views. To attract more people to the Lent festival the bridge will be connected with an open air theater on the Tabor side which can be used for events or just to relax in the sun. A tiny link with a huge impact for the people, the economy, the exibility and Maribor. The new accessability and movement on both sides will raise the quality of the river banks and inuence the whole area in a positive way.

38


Exploded Assembly Drawing

Reinforcement

Tension cable Torsion pipe Empty pipe

Reinforced concrete with pile foundation

39


Concept

bridge 1

bridge 2


Ground Plan

41


Footbridge Lent-Tabor Eleni Chatzatoglou

My bridge should be barrier free and easy to access for everyone. It should be a destination where people like to go and relax, spend time and enjoy the calmness of the Drava. The access ways to, from and over the bridge should be interesting, different and not direct. - Destination - Paths - Harmony

42


Cross Section

43


Elevation & Longitudinal Section

1

10 m

~4% ~ 4,3 %

1

10 m


~4%

45


Footbridge Lent-Tabor Kathrin Bräuer

1. BARRIER FREE It should be possible for everybody to cross the bridge. 2. PLACE TO REST AND MEET There should be options for seating, talking or just looking into the distance. People should have the possibility to stay longer on the bridge and not just walk over it. 3. TEMPORARY SPACE A space where you can sell drinks, listen to music/lectures or many other things around the whole year.

46


Site Plan

47


-A ction A cross se

cross section B-B

Construction Ground Plan & Longitudinal Section

114,76

75,12

12,50

8,00

21,34

TABOR

main grid 8000x3500x10

114,74

subcarrier2 subcarrier 3500x3500x10

-A ction A cross se

+2,6

cross section B-B

subcarrier1 5000x3500x10

flat steel 100x25

waterlev

+253,2= +

subcarrier1 5000x3500x10

flat stee 100x25

subcarrie 3500x350

main grid 8000x3500x10

3,66

+2,6 steel pillar 350x350x10

+253,0 = +/- 0,0

concrete pillar

17,13 16,61

35 1,40

15,15 14,10

35 1,40

31,05 30,00 112,48 115,10


g cross se ction C -C cross se ction CC

21,01

longitudina l section A-A 12 ,00

vel

+/-0,0

LENT +1,4

el 5

er2 00x10

3,50

+1,4

35 1,40

15,15 14,10

35 1,40

15,15 14,10

35 1,40

LENT

17,13 16,58

49


Cross Sections

1,10

TABOR

arrival height +2,6m

main grid 8000x3500x10

subcarrier2 3500x3500x10

subcarrier1 5000x3500x10 1,25

35 35

35

1,79 5,98 7,38

waterlevel +/- 0,0m

0

1,74

1

2

3

4

5m

35

1,74

35 35

1,50

pillars upper sector: steel pillar 350x350x10 water-swept parts: concrete 7380x550


seating stairs material: wood no static function

1,00

1,00

50

1,10

50

50

1,00

TABOR flat steel 100x25 arrival height +2,6m

subcarrier2 3500x3500x10

main grid 8000x3500x10 subcarrier1 5000x3500x10 1,17

35 35

1,45

35

1,42 4,99 6,39

35

1,42

35 35

1,17

pillars upper sector: steel pillar 350x350x10 water-swept parts: concrete 6390x550

waterlevel +/- 0,0m

0

1

2

3

4

5m

51


Footbridge Maribor | Lent-Tabor Doris Rainer

The new footbridge in Maribor should connect the old city center with the district „Tabor“. To me, the bridge should not only be a connection between the two parts of the town but also an experience. It should be an autonomic construction, which is not compareable to the bridges around it - the footbridge to the west and the main bridge „Stari Most“ in the east. The bridge should be recognizable, and at the same time, decent and transparent; independent from the old one but still designed in a way that makes it questionable why there hasn‘t been such a bridge before. In addition, I want this bridge to be not only a necessary connection but also a place to stay, a place where people enjoy being. I want to take the stress away from the pedestrians so they can escape the daily rush. For that reason, my design makes the bridge. This point leads to the extraordinary shape of the bridge, which is formed like an „S“. On the Tabor side the bridge connects with a path for bicyclists and pedestrians. Where I placed the footbridge, there is also a path up the hill which leads to the roads of Tabor. 52


Exploded Assembly Drawing

Railing Aluminium

Paving Mastic Asphalt

Secondary Construction 33 Steel Girders Hollow Section Primary Construction Box Girder Steel S235

53


Elevation


55


Cross Sections &52666(&7,21_

&52666(&7,21_


Pylon

3</21_

57


strong view bridge Bastian Lauchart

CLOSER TO THE RIVER - get people to the riverbanks - increase the quality and make people stay GREEN SPACES - public „green“ spaces - two types of green area - park next to the water HISTORIC VIEW - be aware of the view from the bridge - create a new point of view - show the user the historic „skyline“

58


Exploded Assembly Drawing

TT-beams a

top brace

fframework

abutment

cross b beam

pillars

bridge b bearing

1 top brace 2 top chord 3 bottom chord 4 brace 5 cross beam 6 bridge bearing 7 T-beams 8 wood planks 9 concrete deck 10 abutment 59


Ground Plan & Longitudinal Section


61


Detail 1

connection between bottom chord, boardwalk and deck


Detail 2

connection between bottom/top chord and wooden parts

63


Theresa Rosina Fink

ADDITIONAL FUNCTIONS Inhabitants of Maribor experience the bridge in many different ways - dependent on the time, speed, emotion, weather and season it allows them to stay, rest, enjoy and use the bridge as they want, creating a meeting and orientation point that might become a landmark by staying in memories. EXCHANGE - DUALISM Serve the city rather than only one side or the other. it´s not about creating a one-way bridge to improve Tabor´s connection to Lent. This bridge will strengthen the exchange and the whole city with benefit. POINT OF VIEW My bridge is creating additional points of view, by changing the level of perspective allowing people to look up to the old bridge and along the river 64


Exploded Assembly Drawing

detail model 1:25

wooden decks - sittings steps

concrete walking path

steel plates - top surface

steel plates - bottom surface

steel plates struts structure supports

column support structure

structural overview half bridge (180° rotated)

65


Ground Plan & Elevation


67


Cross Section

cross section B 1:50



cross section A 1:50 5





4

8

1  

 





10





3 2



6





7



 



11

1 steel hollow body 2 concrete (sand) 3 wooden planks 4 railing 5 closed railing 6 lights 7 steel struts

8 30 mm steel plates S355 9 space for installation 10 ditch 11 embankment


Supports

detail 02 - supports 1:50

1 2 3 4 5 6

1 2

steel hollow body support elastomeric bearing railing walkway level foundation piles

6

plan view

4

5 1

1

2

2

3

section

elevation

69


pedestrian bridge maribor Alexander Pock

Cultural axes - Creating a new and an old identity __Building new axes to improve and to use the potential of the historic city. With the new zoning, and the connection between them (Historical city, Lent, Tabor) a whole new variety of intersections can be found, which are leading to new spaces and perspectives. Avoiding Barriers and eliminate them - Creating new, handicapped accessible and barrier free routes. Changing views and enable a completely different perspective __Through the adaption of the bridge, we enable the possibility to change the various viewpoints: You can either look from the hectic city into the green and calm parts of the city, or you can explore new and exciting spots in the city, by looking at it â&#x20AC;&#x201C; simply from a different view, from the bridge.

70


Exploded Assembly Drawing

71


Ground Plan & Elevation


73


Longitudinal Section & Details

A02

A01

294,50 253,00

426

667

872

8. 12.

A01 handrail h / 1000 80

100

welded steel girder bxh / 800x 1000

40

stiff sheets

welded steel girder bxh / 400x 400

Bolzen-Kipplager

40

tilting pin bearing

40

movable bearing Verformungslager

concrete base lx bx hx / 140x 140x 1000

foundation plate lx bx hx / 3800x 3800x 1000

concrete pile Â&#x2019; 1000


256,00

854 .8105

1.234

A02

758

welded steel girder bxh / 800x 400

welded steel girder bxh / 800x 800

welded steel girder bxh / 400x 400

75


UP AND DOWN Tanja Ringstein

MORE QUALITY Both Embankments, Lent and Tabor, should get more quality so that they become places where people want to spend their time. Lent and Tabor have different qualities which should be preserved and highlighted. INVOLVE According to the ďŹ rst point, the new bridge should be involved in bringing more quality for the inhabitants. The bridge generates more quality due to a new connection to the upper housing area in Tabor and a new resting area on the bridge. UP AND DOWN The new bridge will be a 3 point connection and generates a direct connection to the upper Tabor side by accessing the existing pathway and the lower riverbank. The city center now can be reached more easily by foot and bicycle. 76


Exploded Assembly Drawing

Stahlgeländer mit Rundstäben Steel with vertical rods Holzbelag Timber Planking

E

Unterkonstruktion HolzbelagS Substructure for Timber Planking Obergurt Dreigurt & Untergurt Parabelträger mit horizontalen Diagonalen Top Boom Triangle Truss & Bottom Boom with horizontal diagonals Diagonalen Dreigurt & Zugstäbe Diagonals Triangle Truss & Tension Rods Dreigurt & Druckstäbe Triangle Truss & Strut Haupttragwerk mittig (Untergurt & Parabelträger) Main construction element (Bottom Boom & parabolic girder) 77


Ground Plan & Elevation


79


Cross Section Detail

*HOlQGHUDXV6WDKOPLW YHUWLNDOHQ6WlEHQG PP XQG+DQGODXIDXV+RO] %DQLVWHU VWHHO

ZLWKYHUWLFDOURGV ZRRGHQKDQGUDLO













6WDKOURKUKRKOG PP 6WHHO7XEH 8QWHUJXUW 6WDKOURKUKRKOG PP %RWWRP%RRP6WHHO7XEH

$[LV6WUXFWXUH

7RS%RRP 6WHHO7XEH

$FKVH7UDJZHUN

'LVWDQFHVIURP WRFP

2EHUJXUW 6WDKOURKUKRKO G PP



$EVWlQGHYRQ FP





6WDKOKDOWHUXQJ *HOlQGHU 6XSSRUW%DQLVWHU PHFKDQ%HIHVWLJXQJ +RO]EHODJ7UlJHU 0HFKDQLFDO&RQQHFWLRQ +RO]ERKOHQEHODJPP 83(,3( 2EHUJXUW6WDKOSURILOG PP 7LPEHU3ODQNLQJ 83(,3( 7RS%RRP6WHHO7XEH 9HUELQGXQJHQ 'UHLJXUWJHVFKZHLÂ&#x2030;W :HOGHG&RQQHFWLRQ


Elevation & Floor Plan Detail

2EHUJXUW6WDKOURKUKRKOG PP 7RS%RRP6WHHO7XEH

%RWWRP%RRP6WHHO7XEH

,3(

DO %

QJ K RU L]R QW DO  G

UD FLQ J

G  HUN Z K DF V H) QDO UXV R J DO7 Q 'LD R J 'LD

P P 

  P P



8QWHUJXUW6WDKOURKUKRKOG PP

QW



,3(

$X VV WH LIX R



+R U L]



,3(





83(

83(

81


Ludwig Grimm

l i c

i

o n i

c t r

d

a e

c

e

l

g u

r

a

l

n

i a

t

t t

t

e o

i

i

y

t

d n

y

The main goal of the footbridge-design should be the reactivation of public local potentials in the bank area of the Drava river. Those potentials include localized, individualized consumption of goods, activities and space. This form of consumption relys on individualized production and services, implying also individual responsibility by ownership which constitutes identity and strengthens (sub-)cultural features. Now, the areas around the riverbank are bypassed a lot by movement streams and therefore, to some extent excluded from being part of the public life, which takes place more in the core of the city, around the area of the main square. One of the mid-term goals is to bring life down to the Lent riverbank.

82


Exploded Assembly Drawing

83


2.00

Ground Plan & Elevation

30

34.06

59


0.00

9.89

34.06

85

3.50

5.20

31.96

15.48

3.39


1.00

Cross Section Details

3.83

0.50

0.44

0.44

0.20

3.83

0 0.3

0.56

0 0.4

40.0

0.9 0

2.00

10.41

2.00

14.41

0.47

5.23

5.23

0.47

6.12

0.26

0.20

1.00

5.94

0.45

6.28

0 0.3

5.18 5

3.70

0 0.4

0.3

4.1 8

0 0.9

0.53

0.34

40.0

0.30

10.63

0.30

0.49

11.40

2.00

10.41 14.41

2.00


2.93

3.39

0.20

1.00

3.39

0.44

0.34

10.04

3 0. 0 0.

40.0

40

1.09

0.34

77 0.

0. 90

0.92

3.67

3.67

0.92

9.17

3.73

0.20

0.20

1.00

3.39

0.37

3.73

0.

0.20

40 0.

40. 0

0.50

30

3.72

0. 90

0.18

3.91

0.18

87


Partem Bernd Hausegger

CONNECTION_In my opinion, itâ&#x20AC;&#x2DC;s important to build a footbridge in that area because there is no way to cross the river Drava without going upto the upper level of the city. It should work as a functional, barrier-free but convenient and nice connection of both riversides. LANDSCAPE_ Maribor has a very nice river, the Drava, and it serves as a beautiful piece of nature. On the Tabor-side there is a walkway next to it. People already use this path as an recreational zone for sports or walks and would probably use it even more if you would make it nicer again and plant some trees and make it wider. IDENTIFICATION_Another main topic of my project will be the design. The city needs to have something to identify itself. The design should also serve to create a view along the river and should be used for the several festivals that happen there.

88


Sketches

At the beginning I was think about about a Suspension Cable bridge cause of it‘s transperency but ƌĞĐŽŐŶŝnjĞĚƚŚĂƚƚŚŝƐŬŝŶĚŽĨďƌŝĚŐĞƉƵƚƐLJŽƵŝŶƚŽĂƐŝƚƵĂƟŽŶǁŚĞƌĞLJŽƵŚĂǀĞƚŽĨŽůůŽǁĂůŽƚŽĨ ules... It was important for me that the design of the bridge is „loud“ but could also be ransparent and doesn‘t take the view from Lent to the old bridge „Stari Most“. So I sketched an symmetrical bridge with the pylon on the Tabor side.

89


Ground Plan & Elevation


121m

91


Cross Section Details


93


Two Faced Bridge Sasa Sever

I. areas define the position II. functions define the functions III. movement defines shape additional fuctions around the edges draw people to the bridge different parts of the bridge offer various uses (sitting, leaning, weaving...) the path appears as a line in the landscape the supporting structure is an arch, following the existing pattern of the existing bridges

94


Exploded Assembly Drawing

Steel Arch 2000x2000 at the ends 1000x1000 in the middle 142m long 17m high

32 steel cables 2mm diameter

Curved surface 2,5m hight difference

Prestressed cables

Concrete deck 142m long base for the arch

95


Ground Plan & Elevation


97


Cross Section Details


99


Footbridge in Maribor Eleonore Beranger

1. In the shape of the bridge itself. The view of the bridge is giving information about sequences you can experiment on it. Structure and function can be easily understand from an external point of view. Transparency for the middle part, structure very quiet under the deck. 2. Different functions are standing at different places all along the bridge and the embankments, so that you donâ&#x20AC;&#x2122;t stand, walk or cycle the same way depending on your position on the bridge. 3. Two different types of structures, which give different perceptions and many sequences, on the way through the bridge for the users.

100


Exploded Assembly Drawing

101


Ground Plan & Elevation


103


Maribor Footbridge Federica Puglia

As with many European cities, the river has been the main axis along which the city of Maribor has developed throughout the centuries. After the demolition of the old wooden bridge that connected Lent and Tabor, the river started to play a more marginal role in public life of Maribor and therefore most of leisure and commercial activities have concentrated on the north riverside, on a higher level, in an â&#x20AC;&#x153;enclavedâ&#x20AC;? district with its back to the river. As a consequence the south side is isolated, mainly used for residential purposes and completely lacking of designed public spaces. The construction of bridges, that only link the higher levels and that are mainly crossed by cars, allowed high-speed links operating on a large scale. What the river sides need are new humanscale activities, therefore public spaces need to be reintroduced.

104


Concept

$UWJDOOHU\

/LJKWLQJV\VWHP

*UHHQVSDFHSUHVHUYDWLRQ

7HPSRUDU\HYHQWV

)LWQHVVWUDLOV

105


Ground Plan & Elevation


107


Cross Section Details

PPP


109


Footbridge in Maribor Odile Doepper

The city center is not yet well connected to the riverâ&#x20AC;&#x2122;s banks. This bridge should be a way, not only to connect the two banks together, but to increase the frequency of people passing the banks, and that would only be done if it is connected well with the historic part of the city. It should not only be an alternative to the old bridge, but give something more to the people living in Maribor. This bridge should connect, but also preserve, the existing access. It should give back the importance that the old neighbourhood deserves to the Lent bank. The two different atmospheres of the banks should be preserved, and the positive part of each underlined. The beautiful landscape of the river should not be disturbed by the bridge, it should harmonise with the old bridge and the water. This part of the city seems to be left out. The area along the river is not used as in the city center, with some terraces, bars and cafĂŠs. This bridge should be a way to energize this part of the city, to make people want to go down the hill to enjoy being in a more natural environment. 110


Exploded Assembly Drawing

111


Ground Plan & Elevation


113


Cross Section Details

5645 mm

3288 m

Cross section AAâ&#x20AC;&#x2122;

3950 mm


1/2 HEA 800

HEB 400

HEB 400

mm

Cross section AAâ&#x20AC;&#x2122;

0m

5m

10m

20m

115


Maribor Pierbridge Lent-Tabor Patrick Goldberger

DEVELOPING PROCESS 1. Add life to Drava Banks 2. Bring back retain some natural landscape 3. Create connection advantages for users

116


Cross Section

117


Ground Plan & Elevation

C

131.00

C

257.70


B

258.10

B

256.80

253.20

256.10

119


CONTACT INFORMATION

Graz University of Technology Institute of Structural Design TechnikerstraĂ&#x;e 4/IV 8010 Graz +43 316 873 6211 tragwerksentwurf@tugraz.at

July 2017 Layout: Alina Rejepava Photos: Robert Schmid


Footbridge Lent-Tabor | Studio Projekt  

Lehrveranstaltungsbroschüre zur Projektübung im Sommersemester 2017 an der TU Graz.

Footbridge Lent-Tabor | Studio Projekt  

Lehrveranstaltungsbroschüre zur Projektübung im Sommersemester 2017 an der TU Graz.