Page 1

Load no.: Building site:

Load plan No.:

Element no.:

1 Elementtype:

Svesnstrup sports hall

Delivery date:

19/12/2012

Made by:

Ieva Vitola

Page: 1

Delivery timet.:

7:00

Control:

Not contrlolled

Date: 19/12/2012

Weight (ton):

Width 1 (mm):

Width 2 (mm):

Comments:

Pick-up time Delivery time

1

1a

Wooden roof element

4.48 4260

5246

1st load

2

2b

Wooden roof element

4.02 4260

4720

1st load

3

3b

Wooden roof element

4.02 4260

4720

1st load

4

4b

Wooden roof element

4.02 4260

4720

1st load

5

5d

Wooden roof element

4.38 4176

5246

1st load

6

6e

Wooden roof element

3.94 4176

4720

1st load

Total

12

Consignee Receipt:

3:30

7:00

3.30 Loading elements

24.86 Type of load wagon:

5:00 On the way to site 7:00 Loading off the lorrry

Date: 2/12/2012

Sign.:

Truck with a crane

7:10 Installationof the 1st element


Load no.: Building site:

Load plan No.:

Element no.:

2 Elementtype:

Svesnstrup sports hall

Delivery date:

19/12/2012

Made by:

Ieva Vitola

Page: 1

Delivery timet.:

7:00

Control:

Not contrlolled

Date: 19/12/2012

Weight (ton):

Width 1 (mm):

Width 2 (mm):

Comments:

Pick-up time Delivery time

1

7e

Wooden roof element

3.94 4176

4720

2nd load

2

8e

Wooden roof element

3.94 4176

4720

2nd load

3

9g

Wooden roof element

4.5 4150

5246

2nd load

4

10h

Wooden roof element

3.92 4150

4720

2nd load

5

11h

Wooden roof element

3.92 4150

4720

2nd load

6

12h

Wooden roof element

3.92 4150

4720

2nd load

6

Total Consignee Receipt:

10:20

13:50

10.20Loading elements

24.14

11:50 On the way to site

Type of load wagon:

13:50 Loading off the lorrry Date: 2/12/2012

Sign.:

Truck with a crane

14:00 Installation of th e 1st element

Load plans 3