The brazilian market of distributed solar PV generation

61

Annual Report 2016

The three points most often mentioned were: “Compliance with deadlines stipulated by REN 482/2012 (within PRODIST) of ANEEL (F)”, with 73 answers (or 13% of the total); “Standardization of disclosure on grid connection procedures for all distributors (A)”, with 71 answers (12%); and “Acceptance of two unidirectional meters for low voltage customers (H)”, with 69 answers (12%). In the previous edition, the most often chosen options were: A (Standardization of disclosure on grid connection procedures for all distributors); B (Simplification of the stages of grid-connection application process); C (Specific training on distributed generation to distributor branch clerks to improve customer service); and F (Compliance with deadlines stipulated by REN 482/2012 (within PRODIST) of ANEEL). In the current edition, option “C” was ticked only once. This can be a sign of a better distributor customer service. It is worth mentioning that, with the changes made to regulations through REN 687/2015, aspects related to the energy bill will garner more attention from distributors in the course of 2016. Therefore, it is to be expected that, in the 2017 edition of this survey, there will be a lower number of complaints regarding this topic.

The Brazilian Market Of Distributed Solar PV Generation - Annual Report 2016  

Initiative of the IDEAL Institute and AHK-RJ, the study "Annual Report 2016 – The Brazilian Market of Distributed Solar PV Generation” comes...

The Brazilian Market Of Distributed Solar PV Generation - Annual Report 2016  

Initiative of the IDEAL Institute and AHK-RJ, the study "Annual Report 2016 – The Brazilian Market of Distributed Solar PV Generation” comes...

Advertisement