Page 14 of 28 Annex 3.4 Coefficient of Variation of the Net Cash Flow Coefficient of Variation of the Net Cash Flow Suriname 432% CGC 76% C Countries 2418% Region 3 1734% Bank 9496%
Annex 3.5: Suriname Project Cycle Efficiency (Historical Portfolio) Preparation (months)
Execution (months)
Pipeline to Approval
Approval to Contract
Contract to Eligibility
Eligibility to Original Final Disbursement
24.3
3.4
9.4
40.2
Suriname
Extension
Period of Active Disbursement
39.0
79.2
Group C*
22.7
3.9
10.1
42.2
18.7
60.9
Region 3*
23.1
4.6
9.2
41.7
18.7
60.4
Bank wide*
20.6
4.0
10.4
42.3
17.4
59.7
* The average number for the comparison groups of countries were calculated considering only the four instruments presented in Suriname’s portfolio, namely PESP, PGCR, PSCT, PSEF.
Annex 3.6 Project cycle efficiency, by Program Cycle as of December 31, 2004 (in months) Preparation
Execution
Signature
Suriname
24.3
3.4
9.4
40.2
Extension as of 2004 (Update2005) 39.0
Group "C" Countries
22.7
3.9
10.1
42.2
18.7
Region 3
23.1
4.6
9.2
41.7
18.7
All Bank
20.6
4.0
10.4
42.3
17.4
N/A
2
13.3
34.7
53
Primary Education Improvement
N/A
2
14
34
36
48% (closed)
Global Credit for Industry
N/A
1
11
37
15
89% (closed)
Improvements of Nickerie Hospital
N/A
3
15
108
96% (closed)
Cycle I Average
First Eligibility
Cycle II Average Cycle III Average
Eligibility to Original Final Disbursement
% Original Disbursement as of 12/31/2004 (Update 2005)
Approval
33 (No Loans Approved)
12
1
4
32
24
12
1
4
26
4.3
8.3
32 43.7
12 (20)
Community Development Fund
22
18
12
36
0 (24)
18% (27%)
Low-Income Shelters
35
2
18
42
0 (12)
15% (28%)
Decentralization Land Local Government Strengthening
33
2
12
24
12 (24)
Preparation of the Census
31
3
0
54
0
Trade and Agriculture Program Cycle IV Average(Active Loans)
Basic Education Improvement Project
48
3
5
Strengthening Public Sector Mgmt
5
2
N/A
55 50
Health Sector Facility
8
0
3
45
24
0
100% (closed)
41% (47%) 71% (72%) 0.4% (14%)
0
0% (0%)
0
1.6% (7%)