Page 1

SolarLeaf from the idea to the first pilot project at IBA 2013 in Hamburg Dr.-Ing. Jan Wurm, Arup Materials Consulting, Berlin


2

Think Global -Act Local


3

Arup Berlin – orchestra of disciplines


projects

4


Unser Leistungsumfang

CONCEPT

5

SCHEME

DETAIL DESIGN

CONSTRUCTION

OPERATIONS


6

NATIONAL GEOGRAPHICS KIDS


Percentage Renewable Energies of total energy consumption (BMU, 2012) 7


8


Ansicht “Zero Energy” Media Wall

9


Solar Decathlon 2009, TU Darmstadt, Team Germany

10


Percentage Renewable Energies of total energy consumption (BMU, 2012) 11


12


13


14

Francois Roche, Stephanie Cavuax, Jean Nauarro


15


16


17


18


19


20


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

2009

International Competition Smart Material House IBA 2013 Architects: SPLITTERWERK, Graz Material Consulting / Facade / Building Physics: Arup, Berlin Structures: Bollinger und Grohmann, Frankfurt PBR Technology: SSC

21


22


Dynamic transmission


24


25


26

© SPLITTERWERK


27


28


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

2010

Product development Arup, COLT, SSC Funded by ZukunftBau

29


30


31


Dimensions: • Height: • Width: • Volume • Weight:

~ 2,6m ~ 0,7m ~ 24 l ~ 160 kg

Functionalities: • PBR • Solar thermal collector • Dynamic shading

32


Klemmrahmen

Isolierglas (4mm) SZR (12mm) Glas-Wandung (10mm)

Anschluss Steg

Medium Distanzprofil Überlauf

‚solar conversion louvre‘: built-up 33


‚solar conversion louvre‘: varianten 34


Keine Isolation

Neopren Isolation

Schaumstoff Isolation

‚solar conversion louvre‘: frame 35


Geothermal heat exchanger floatation

HEAT

CHPP

BIOMASS

36

Energy controller Heat Pump Hot Water

BIOGAS


37


38


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


• Total budget DKK 16 million • Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand


45


Integration


Integration


jan.wurm@arup.com

48


2015

jan.wurm@arup.com

49


Concept for energetic and material recyling of waste water Fluxes are given per person and day

Grey Water COD 800mg/l, 60 L

WC waste

2

4m Bioreactor Facade Nutritients

Organic Waste

CO2 Industrial water

140 g

Heat Biomass shredder

50

Anaerobic Membrane Biogas Reactor

Gas separation

Methane


20??

jan.wurm@arup.com

51


jan.wurm@arup.com

52


jan.wurm@arup.com

jan.wurm@arup.com 53

0910 the bioreactive facde jan wurm  

Building Green 2013