HotPott June 2021

Page 18

Spring clean

Your Vote Your Council

The village spring clean took place on Saturday 1st May. Thank you to those who joined us in keeping our village tidy: we had our regulars and some new faces; thank you to you all. Highways

exclude parts of Pott Shrigley •

Remedial resurfacing of Shrigley Road from Green Close to the aqueduct.

Project 1421 (PACP list) Modifications to the ‘Chevron Bend’ by Shrigley Hall.

Stones are missing from the base of the wall at the side of the bridge on Bakestonedale: to be assessed in regular safety inspections.

Blocked gully at the junction of Long Lane and Shrigley Road.

Provision of double yellow lines on Pott Hall bend: deferred.

Fingerpost at junction of Street Lane and London Road. Cllr. Wray will ring Cllr. Smith from Adlington PC for an update about what is happening with this signpost.

New issues •

Accident on Shrigley Road just north of the Spuley Lane junction was reported to Highways because stones have been pushed inwards on the bridge. Photos of wall and car responsible have been sent to Highways.

Accident at the end of Spuley Lane: collision of two cars but no damage to people or property.

Notices of closure of part of Shrigley Road from the 17th May to 4th June have appeared. The clerk ascertained that this has been requested by Electricity North West and is to allow them to cut trees affecting their power lines. It is likely to occur on 26th May.

Updates •

Fly tipping behind log situated alongside Shrigley Road between Norman’s Hall and the Coffee Tavern. The material that was still in the bags has been removed. State of the road surface of Long Lane between Nab Quarry and Shrigley Road. The road has been patched on one side, but not the other. Highways will be contacted if, after a month, the other side has not been done.

Pending •

Traffic Lights near Cedar Lodge remain in situ (See page 20 Editor.)

Decision on revision of gritting routes to

Page 18

Miscellaneous Poynton Area Community Partnership (PACP) Cllr. Boulton reported that the PACP had provided the school with four laptops. The church/school have asked for a grant for the Rose Queen event. Although the event will be scaled down, the Fell Run will take place as will a BBQ with bar. It was noted that the sheep need to be removed from the village green by the first week in June and that one mowing would be necessary. Planning Pending 21/1251M Nab Quarry, Long Lane, Pott Shrigley Resubmission for the regularisation of warehouse storage buildings and demolition of existing shed and replacement with two storey office building at MRI Polytech The council is concerned that this is an HotPott - June 2021


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.