COLLEGE OF MARIN   

KTD  

SHOP 

MS2

AFTER ACTION REPORT 

 

TECH 

PAUL   FANTA

DATE   26MAR'12

LOCATION GOALS : PE STREETLIGHT MATERIAL

URGENT CALLS  TODAY Streetlight authorization PO resubmit   Woodshop materials; EXPLOSION PROOF BOX   WORK ORDERS  Next WEEK Spray booth materials; NEMA3 480V MOTOR START ASSEMBLY   Collect wiremold material       FINISH CAFETERIA KITCHEN AND ATRIUM RELAMP; ALSO SS BA F25 LAMPS   Install Salvage wallpacks to exterior parking lot lighting     SPECIAL PROJECTS  PE STREETLIGHT LRC GROUP Relamp as needed   Change deductions at doris tucker office     THIS MONTH FA EXTERIOR LIGHTING; PE STREETLIGHT BOND   Complete FH111 power install   CONSOLIDATE WO’S BY LOCATION   FILE BOND MANUALS; GET PDFS TO FILE ON SERVER   MATERIALS [LRC/SC]  MATERIAL MATERIAL /PERSONNEL REQUIRED TWO GANG BELL BOX EXTENSION; [14] 150W MH LAMPS;   TWO LAMP T8 LAMPS AND BALLASTS [30]; 400W MERC LAMPS [4]; F25 & F17 T8LAMPS   WIREMOLD     OBSTACLES NEED PURCHASE ORDERS AT GRAINGER AND CITY ELECTRIC   NEED HAZMAT REMOVAL MS2   CLEAN UP TRUCK/SHOP  DAILY SCORE:   82  1  LIGHT   EXPRESS HAS RECEIVED THE $874 CHECK FOR THE ATRIUM LIGHTS. 2    3    4    5   

REG HRS   

 

7.5

 

O/T 

 

LEAVE 

 

MATERIAL $   

PO REQ 

$

 


ms2 report 26mar12