Page 1

Erin Hope Wietman

P O RT F O L IO 2015 - 2020


Contents

- 2nd Year -

4-7 8 - 11

Abstract Foundations Savannah, GA Bath House Concept Design Seattle, WA

12 - 15

Culinary Education Center Charlotte, NC

16 - 19

Logging Pavilion Seattle, WA

20 - 25

Bathhouse and Meditation Space Charlotte, NC

26 - 31

Winery and Taste Room Asheville, NC

32 - 37

Natatorium and Public Library Rome, Italy

- 5th Year -

38 - 43

Gold Museum and Office Tower Charlotte, NC

- other -

44 - 47

Steel Parametrics

48 - 51

Environmental Strategies

52 - 63

Construction Experience Wood, Steel, Concrete

64 - 67

Logo Design

- 3rd Year -

- 4th Year -

2


“She who works with her hands is a laborer. She who works with her hands and her head is a craftsman. She who works with her hands and her head and her heart is an artist.�


4


Savannah, GA - Abstract Foundations of Architecture 2nd Year Studio


Implied Volume Implied Volume

Wrapping Wrapping (Walls/Daylighting) (Walls/Daylighting)

Interactive Path Interactive Path

Support/Structure Support/Structure

Elevation Elevation

Plan Plan


8


Lake Norman, NC - Bath House Concept Design2nd Year Studio


>

> )

(

> )

(

> (

)


12


Charlotte, NC - Culinary Education Center 2rd Year Studio


STUDY CARRELS

Entry

READING ROOM

STACKS

COMPUTER LABS

COMPUTER LABS

COMPUTER LABS

COMPUTER LABS

STAFF OFFICES ADMIN OFFICES

STORAGE

STUDY CARRELS

Entry

READING ROOM

STACKS

COMPUTER LABS

COMPUTER LABS

COMPUTER LABS

COMPUTER LABS

STAFF OFFICES ADMIN OFFICES

STORAGE

G DIN

A

RE

R

M OO

SR

AS

CLASSROOM DEMO DEMO AUDITORIUM CLASSROOM DEMO CLASSROOM DEMO

CLASSROOM

MS

OO

AUDITORIUM

S

E &D

COMPUTER LABS

S CK STA S CK STA

CAFE

LOBBY

CLASSROOM DEMO DEMO AUDITORIUM CLASSROOM DEMO CLASSROOM DEMO

LS

RE

AR

MO

IN DM

DA AN ICES AFF OFF ST

CL

C DY

TU

&S

CLASSROOM

CAFE

CAFE

CATERING KITCHEN

CAFE KITCHEN

BREAK ROOM ADMIN OFFICES STAFF OFFICES

STORAGE

CAFE KITCHEN

CATERING KITCHEN

CAFE

GREEN

(SHARE

SPACE

D WIT

CAFE KITCHEN

GR

EEN

CATERING KITCHEN

H LIBRAR Y CAF

E)

SPA CE

BREAK ROOM

BREAK ROOM OU T CLA DOO SSR R OO M

ADMIN AND STAFF OFFICES

ADMIN OFFICES STAFF OFFICES

STORAGE

LOBBY

LOBBY

LARGE DEMO

LOBBY

LARGE DEMO

LAR

GE

O DEM

GR

WAREHOUSE STORAGE

WAREHOUSE STORAGE

E US HO GE RE WA TORA &S

ND

OU


GREEN SPACE

METHODS OF CIRCULATION

FORM

PRIVATE SPACE

CIRCULATION

PUBLIC SPACE


16


Seattle, WA - Logging Pavilion 3th Year Studio


20


Charlotte, NC - Bath House and Meditation Space3th Year Studio


Anatomy: Roman baths:

Textured Light Condition: Roman baths:

Circulation

Circulation Dissected Tree

> >               (   ) 



 

>        (   )        

>           Â   Â?    Â? (  Â?  )

> >               (   ) 



 

 

Water Access



Water Access

Shoulder connection

Body rem

s itie

Ext

Program Layout

Extremities

Program Layout









>        (   )        

>           Â   Â?    Â? (  Â?  )



 


26


Asheville, NC - Winery & Taste Room 4th Year Studio


32


Rome, Italy - Natatorium and Public Library 4th Year Studio


38


Charlotte, NC - Gold Museum & Office Tower 5th Year Studio






3/4” = 1’ - 0”



 3/4” = 1’ - 0”

SLICE

PULL

BUILD OUT

SITE MANIPULATOR

FINAL WITH SIMPLIFICATIONS

3/4” = 1’ - 0”


2

SQ. FOOTAGE: 5,500 ft NUMBER OF LEVELS: 4 HEIGHT: 73’ - 6” ORIENTATION OF GLASS FACE(S): SW PRIMARY DAYLIGHTING HOURS: 1:00pm - 5:00pm

SQ. FOOTAGE: 2,500 ft NUMBER OF LEVELS: 7 HEIGHT: 115’ - 0” ORIENTATION OF GLASS FACE(S): NW, SE PRIMARY DAYLIGHTING HOURS: 7:00am - 11:00am 3:00pm - 5:00pm

WESLEY HEIGHTS

WEST BLVD

REVOLUTIONARY PARK

WILMORE WEST BLVD

SOUTH END

WILMORE WEST BLVD

DILWORTH

WESLEY HEIGHTS

SECOND WARD

WEST BLVD

REVOLUTIONARY PARK

FIRST WARD

FIRST WARD

SECOND WARD

SECOND WARD

SECOND WARD

WILMORE

WEST BLVD

SOUTH END

FOURTH WARD

FOURTH WARD

FIRST WARD

WILMORE

SQ. FOOTAGE: 5,000 ft NUMBER OF LEVELS: 2 HEIGHT: 60’ - 0” ORIENTATION OF GLASS FACE(S): NW PRIMARY DAYLIGHTING HOURS: 7:00am - 9:00am

WESLEY HEIGHTS FOURTH WARD

FIRST WARD

REVOLUTIONARY PARK

WILMORE WEST BLVD

SOUTH END

REVOLUTIONARY PARK

WILMORE

SOUTH END

SOUTH END

BROOKHILL

DILWORTH

SOUTH END

BROOKHILL

SQ. FOOTAGE: 13,500 ft NUMBER OF LEVELS: 4 HEIGHT: 100’ - 0” ORIENTATION OF GLASS FACE(S): NE PRIMARY DAYLIGHTING HOURS: 7:00am - 11:00am

WESLEY HEIGHTS FOURTH WARD

BROOKHILL

WILMORE

DILWORTH

SQ. FOOTAGE: 5,000 ft NUMBER OF LEVELS: 5 HEIGHT: 60’ - 0” ORIENTATION OF GLASS FACE(S): SE PRIMARY DAYLIGHTING HOURS: 8:00am - 3:00pm

WESLEY HEIGHTS

REVOLUTIONARY PARK

BROOKHILL

DILWORTH

SQ. FOOTAGE: 8,500 ft NUMBER OF LEVELS: 3 HEIGHT: 60’ - 0” ORIENTATION OF GLASS FACE(S): SW PRIMARY DAYLIGHTING HOURS: 1:00pm - 6:00pm

SECOND WARD

SOUTH END

BROOKHILL

DILWORTH

REVOLUTIONARY PARK

REVOLUTIONARY PARK

SOUTH END

BROOKHILL

FIRST WARD

SECOND WARD

SECOND WARD

WILMORE

FOURTH WARD

FIRST WARD

FIRST WARD

SECOND WARD

WEST BLVD

WESLEY HEIGHTS FOURTH WARD

FOURTH WARD

FIRST WARD

REVOLUTIONARY PARK

SQ. FOOTAGE: 6,000 ft + 2,000 Balcony Space NUMBER OF LEVELS: 2 HEIGHT: 105’ - 0” ORIENTATION OF GLASS FACE(S): NW, SE PRIMARY DAYLIGHTING HOURS: 7:00am - 11:00am 2:00pm - 5:00pm

WESLEY HEIGHTS

WESLEY HEIGHTS FOURTH WARD

WEST BLVD

SQ. FOOTAGE: 6,000 ft + 2,000 Balcony Space NUMBER OF LEVELS: 2 HEIGHT: 105’ - 0” ORIENTATION OF GLASS FACE(S): NW, SE PRIMARY DAYLIGHTING HOURS: 7:00am - 9:00am 2:00pm - 5:00pm

BROOKHILL

BROOKHILL DILWORTH

DILWORTH

DILWORTH







ELEVATORS

MECH/ELECT ROOMS

FIRE STAIR


44


- Steel Parametrics 3rd Year Computational Methods


48


 

CONSTRUCTED WETLANDS (GREYWATER TREATMENT)



SHOWER

PUMP UV LIGHT DISINFECTION

GREYWATER

SINK

RAINWATER

POTABLE WATER TANK

TREATED GREYWATER TO DRAINFIELD



DRIP IRRIGATION DRAINFIELD

FILTERS EVAPOTRANSPIRATION

CISTERN

EXCESS RAINWATER CONVEYED TO LAKE UNION VIA DEDICATED STROMDRAIN

GREYWATER

Charlotte, NC - Environmental Strategies -


CONSTRUCTED WETLANDS (GREYWATER TREATMENT)

SINK

SHOWER

PUMP UV LIGHT DISINFECTION

GREYWATER

POTABLE WATER TANK

TREATED GREYWATER TO DRAINFIELD

% RAINWATER

%

DRIP IRRIGATION DRAINFIELD

FILTERS EVAPOTRANSPIRATION

CISTERN

EXCESS RAINWATER CONVEYED TO LAKE UNION VIA DEDICATED STROMDRAIN

GREYWATER


=


52


Construction Experience - Wood, Steel, Concrete -


54

"

    "


” / ”

” / ”

” / ”

/ ” / ”

” ”

” ” ”

1

2

3

5

4

6

/

” ”

” ”

(

)

/ "

/ "

/ " / "

8

7

10

9

12

11

/ ” / ” / ”

/ ”

/ ”

/ ”

"

#

/

/ "

/ " / "

13

15

14

16

( ”

/ " / " "

/ "

)

/ "


5

6 ” ”

/ "

12

11

/ ” / ”

/ ”

/ ”

/ "


64


- Logo Design -


Gillis Painting: The following logo was designed for a painting company focused on communicating the importance of their home-based painting jobs and an importance on community collaboration. Although there were a few dissagreements between client and designer, this was a great experience in seeing where those compromises need to occur and where you need to push back and reassure the client that your oppinion is calculated.


Hanson Lawn Care and Landscaping: The following logo was designed for a local landscaping company. This commission was made after seeing their current ad on a flyer and realizing that their graphics needed significant help. By working with the business owner one - on - one, I was able to create a design that final represented his business the way he wanted it to be seen.


Erin Hope Wietman erin.wietman@gmail.com ewietman@uncc.edu (401) 269 - 8793

Profile for Hope Design

Portfolio  

Portfolio  

Advertisement