Page 155

mune │ Gaithersburg Alternative Master Plan Sustainability

Future Buildings Strategies

Building Strategy Application Key

2

Office

1 Laboratory

5

Conference/Training

Public/Circulation

Summer and Winter Solar Radiation for North Facade

2

4

1

Parking Deck

tion Strategies

▲ solar diagram

Glare Control Summary Diagram for Future Buildings

4 3

4

2

Summer and Winter Solar Radiation for North-West Facade

Summer and Winter Solar Radiation for South-West Facade

1

atrium

2

office

3

lab

4

main street + link bridge

5

courtyard below

5

Summer and Winter Solar Radiation for South-East Facade

160ft

1 April 2016

2

15 80 30

► typical level floor plan

40

t Optimization

f daylighting controls is recommended for all office areas in truction. Using daylighting controls allows the use of d window shades that raise and lower in response to roof sensors measuring solar heat gain. Daylight controls d with automated shades for perimeter zones with windows ce electric energy consumption in the building as well as g glare from the sun.

1

Summer and Winter Solar Radiation for North-East Facade

0

bs with high exhaust air requirements at MedImmune corporate air flow set-backs in labs where radiant cooling is cal. Lab spaces require minimum number of air changes rmal operation, however during unoccupied hours air hese air change rates can be reduced as lights, people and t loads are not present.

2

2

Set Back

4.02

3

1 3

155

▲ southeast facade in summer + winter 3

1

4 4

6

3

2

7 6

3

6

► winter garden level floor plan

▲ southwest facade in summer + winter

1

lobby

2

winter garden

3

atrium

4

cafeteria

5

conference room

6

office

7

lab

8

garage

3

7 7

8

MASTER PLAN FOR CONFIDENTIAL BIOPHARMACEUTICAL COMPANY

3 5

2016 HOK Design Annual  

HOK’s 2016 Design Annual highlights projects ranging in scale from community gardens to supertall buildings.

Read more
Read more
Similar to
Popular now
Just for you