General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

B Sheet Number

C

A0000 A0001 A0002 A0003 A1050 A1090 A1101 A1102 A1103 A2001 A2002 A3001 A3002 A3003 A3004 A3005 A3006 A4001 A4002 A4003 A4011 A4021 A4041

LIST OF DRAWINGS Sheet Name COVER SHEET ABBREVIATION, SYMBOLS AND GENERAL NOTES SCHEDULES SAMPLE IMAGES SITE PLAN BASEMENT PLAN FIRST LEVEL PLAN SECOND LEVEL PLAN THIRD LEVEL PLAN ELEVATIONS 01 ELEVATIONS 02 SECTIONS 01 SECTIONS 02 SECTIONS 03 SECTIONS 04 SECTIONS 05 SECTIONS 06 STAIR #1 DETAILS STAIR #2 DETAILS STAIR #3 DETAILS RAMP DETAILS TOILET DETAILS #1 TERRACE LEVEL PLAN

Sheet Number A4050 A5011 A6001 A6002 A6003 Grand total: 28

LIST OF DRAWINGS Sheet Name U/G TANK DETAILS DOOR/WINDOW DETAILS RCP LEVEL 01 RCP LEVEL 02 RCP LEVEL 03

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager

Consultant : HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

PROPOSED HOSPITAL BUILDING FOR IGREJA EVANGELICA BAPTISTA EM ANGOLA

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

COVER SHEET

ARCHITECTURAL DESIGN DEVELOPMENT PROGRESS SET

Original Scale

Drawn

HVM Date :

26-12-2013

Drawing Number

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A0000 00


1

2

3

4

5

6

7

8

N

Key Plan

ARCHITECTURAL ABBREVIATIONS & CL #

A

B

C

AND ANGLE CENTER LINE NUMBER

ABV. ABOVE ACF. ARCHITECTURAL CONCRETE FINISH ACOUS.ACOUSTICAL A.D. AREA DRAIN ALD. ALUMINIUM DOOR ADJ. ADJUSTABLE AFF. ABOVE FLOOR FINISH AGGR. AGGREGATE AHU. AIR HANDLING UNIT ALUM. ALUMINIUM ANOD. ANNODIZED APPX. APPROXIMATE ARCH. ARCHITECTURAL ASPH. ASPHALT ATC. ACOUSTICAL TILES CEILING

CONN. CONSTR. CONT. COORD. CNTR C.T. CTSK D DBL DEPT. DF DIA DIM. DISP. DN D.O. DR DR. DET DWG DWR

CONNECTION CONSTRUCTION CONTINUOUS COORDINATION COUNTER CERAMIC TILES COUNTER SINK DIAMETER DOUBLE DEPARTMENT DRINKING FOUNTAIN DIAMETER DIMENSION DISPLAY/ DISPENSER DOWN DOOR OPENING DOCTOR DOOR DETAIL DRAWING DRAWER

E EF EJ EL ELEV. EMER. ENCL. EP. EQ. EQUIP. ES EXIST. EXP. EXPO. EXT.

EAST EXHAUST FAN EXPANSION JOINT ELECTRICAL ELEVATION EMERGENCY ENCLOSURE END POINT EQUAL EQUIPMENT ESCALATOR EXISTING EXPANSION EXPOSED EXTERIOR

BLDG. BD. BM.

BUILDING BOARD BEAM

CAB. CH. CEM. CER. C.G. C.I. C.J. CL. CLG. CLO. CLR CM CMU COL CONC CP CPT. CSSD CSF CTRL

CABINET CEILING HEIGHT CEMENT CERAMIC CORNER GUARD CAST IRON CONTROL JOINT CENTER LINE CEILING CLOSET CLEAR CENTEMETRE CONCRETE MESONRY UNIT FA COLUMN F.D. CONCRETE F CEMENT PLASTER F.E. CARPET CENTRAL SETRILE SUPPLY DEPARTMENT FFL FPL CONCRETE SLAB FINISH FGL CENTRAL FHC FIN. FIXT. FL FLSH F.S. FUT.

FIRE ALARM FLOOR DRAIN FEMALE FIRE EXIT FINISH FLOOR LEVEL FINISH PAVING LEVEL FORMATION GROUND LEVEL FIRE HOUSE CABINET FINISH FIXTURE FLOOR FLASHING FULL SIZE FUTURE

GALV. GAR GL GND GR GRP GWB GYP.

GALVANIZED GARBAGE ROOM GLASS GROUND GRANITE GLASS REINFORCED PLASTER GYPSUM WALL BOARD GYPSUM

MIN. MR MISC. MO MSL MEP MTL MTR

HCT HOWD HM HRS HORIZ HV H.P. HT

HANDICAPPED TOILET HARDWARE HOLLOW METAL DOOR HOURS HORIZONTAL HIGH VOLTAGE HIGH POINT HEIGHT

N N.I.C. NO OR # NOM. NRS STN N.T.S.

ID INSUL INT. IP

INTERIOR DESIGN INSULATION INTERIOR INTERLOCKING PAVOURS

JAN. JC JT. KIT. KG

JANITOR JANITOR CLOSET JOINT KITCHEN KILOGRAM

L LAB. LAM LAV. LKR LP LT LV

LIFT (ELEVATOR) LABORATORY LAMINATE LAVATORY LOCKER LOW POINT LIGHT LOW VOLTAGE

M MM MAT MAX MC ME MEMB. MFR MH

MALE MILIMETRE MATERIAL MAXIMUM MACHINE MECHANICAL MEMBRANE MANUFACTURE MANHOLE

S SCFD S.C. SCH SD SEAL SECT. SHT SHR ST NORTH SIM NOT IN CONTRACT SOG NUMBER SP NOMINAL SPEC. NURSE STATION SQ NOT TO SCALE SMT S.S. OVERALL SSL ON CENTER STOR OFFICE STRUCT OPENING SUSP OPPOSITE OWNER SUPPLIED CONTRACTOR INSTALLED SYM OVERFLOW DRAIN T TOP PASSENGER LIFT TOIL PANTRY TEL PRAYER ROOM THK PLASTER TV PLUMBING TYP PLATE POLISHED UNF PAIR POINT U.N.O. UR RISER RADIUS VAR REFLECTED CEILING PLAN VERT. ROOF DRAIN REFERENCE W REFRIGERATION W. REINFORCEMENT W/ RAISED FLOOR W.C. REVISED/ REVISION WD ROOM W/O ROLLING SHUTTER WP WR WT

SOUTH SELF CLOSING FIRE RATED DOOR SUSPENDED CEILING SCHEDULE SOAP DISPENCER SEALANT SECTION SHEET SHOWER STONE SIMILAR SLAB ON GRADE START POINT SPECIFICATION SQUARE SQUARE METER STAINLESS STEEL STRUCTURAL SLAB LEVEL STORAGE STRUCTURAL SUSPENDED SYMETRICAL

MINIMUM MIRROR MISCELLANEOUS MASONARY OPENING MEAN SEA LEVEL MECHANICAL ELECTRICAL & PLUMBING METAL METER

OA OC OFF OPNG OPP OSCI OVD P PAN PRAY PLAS PLUMB PL POL PR PT R RAD RCP R.D. REF. FEFR. REINF. RF REV. RM RS

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

TREAD TOP OF PERAPET TOILET TELEPHONE THICK TELEVISION TYPICAL UNFINISHED UNLESS NOTED OTHERWISE URINAL VARIES VERTICAL WEST WIDE WITH WATER CLOSET WOOD WITHOUT WATERPROOF WATER RESISTANT WEIGHT 0

0 +00.000 FIRST FLOOR

0

+00.000 FIRST FLOOR

+00.000 FIRST FLOOR

IN ELEVATION/SECTION

D

0

+00.000 FIRST FLOOR

0

A0000

0

0

A0000

INTERIOR ELEVATIONS

ELEVATION MARKS

N 0

0

0

IN THE ARCHITECTURAL GA PLANS

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

EXTERIOR ELEVATIONS

NORTH ARROW

ELEVATION SYMBOLS

GRID NOTATION

Rev

Purpose of Revision

Date

Authorized

Project :

FILLED REGIONS

0

A0000

HOSPITAL BULIDING 0

DOOR #

0

A0000

x

A0000

0

NEW DOOR

A0000

00 00

Steel

PARTITION TAG XX

0

Concrete unit masonary

Gypsum wall board (OSB)

A

FINISH ID - 4 CAT

DR FR HW

B

0

BREAK LINE

FLOOR TRANSITION

x

A0000

DOOR ID HARDWARE SET

A0000

SCALE

0

x

Lath and plaster 00

XXXXX 000

00

0000 A

Name line 1 Name line 2

00

0

x

A0000

A0000

x

0

A0000

0

x

A0000

0

x

A0000 x

0

A0000

A0000

0

x

0

A0000 x

0

WINDOW TAG

F

Plywood (rough)

CEILING ID

WALL ID

LETTERED TAG

EQUIP ID

0

A0000

A0000

KEYNOTE

Finish wood (wood work)

ROOM ID

FILLED REGION : BH-GEN-SOLID-OPAQ-50%

HATCH FOR STRUCTURAL CONCRETE

A0000 5

10

20

30

40

50

x

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Building Name : 0

0

HAREN MANGUKIA

Parcel number :

00

494

00000.0000

Earth

FURNITURE ID

x

A0000 x

Volume

Particle board (rough)

IGREJA EVANGELICA BAPTISTA DE ANGOLA

1:1

Consultant : 0

Rigid insulation board

View Name

0

REVISION CLOUD & ID

Project Manager FXX BXX WXX CXX

Coarse porous fill (gravel)

DOOR & PARTITION ID

CROSS REFERENCE MARKS

MATCH LINE & TAGS

Grout

Client :

1:1

Cast-in-situ concrete A0000

E

View Name

0

x

0

A0000

x

0

A0000

x

0

x

A0000

100

SECTION MARKS

Drawing title :

ABBREVIATION, SYMBOLS AND GENERAL NOTES

WALL SECTION MARKS Original Scale

Drawn

HVM

KEYNOTES

As indicated Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A0001 00


1

2

3

4

5

6

7

8

N

Key Plan

CARPET AREA SCHEDULE NAME

A

B

C

D

E

F

BASEMENT PARKING BLOOD BANK CENTRAL GAS LIFT SHAFT LIFT SHAFT MEDICINE STOCK PUMP ROOM #1 PUMP ROOM #2 STAFF LIFT U/G WATER TANK #1 U/G WATER TANK #2 U/G WATER TANK #3 BASEMENT 1: 12 ACCOUNT/ HO. ADMIN. BANCO DE URGENCIA CON DE MEDI #1 CON DE MEDI #2 CON DE MEDI #3 CON DE MEDI #4 CON DE MEDI #5 CON DE MEDI #6 CONLULTORIO CONSULTORIO DE URGENCIA DEPOSITO ELECT. & TELE COMMUNICATION ESTOMA CONSULTO GAB. PARA O CHEFE JENITOR RM LAB. DE URGENCIA MAJOR OT MINOR OT OPD CIRCULATION ORTHO TRAUMA. OT CORRIDOR PERP ROOM PHARMACY PTS LIFT #1 PTS LIFT #2 QUE FOR REGISTRATION RECEPTION SAFE SALA DE ECO GRAFIA SALA DE ENFERMAGEM/CHF DE ENF SALA DE ESPERA SALA DE MAMO GRAFIA SALA DE MEDICO SALA DE OBSERVACAO SALA DE REANIMACAO SALA DE RX SALA DE RX SALA DE SO #1 SALA DE SO #2 SALA DE TAC SALA DE TRATAMENTO SALA DE TRATAMENTO SCRUB #1 SCRUB #2 SHAFT #1 SHAFT #2 STAFF LIFT #1 STAFF TOILET-F STAFF TOILET-M SUB. ST #1 SUB. ST #2 TIME KEEPER TOI. - M #2 TOIL. -F #1 TOIL. A/C TOIL. F #2 TOIL.-M #1 LEVEL 01: 57

AREA SMT

CARPET AREA SCHEDULE VOLUME CMT

1218.72 38.40 21.08 9.00 12.00 52.48 23.44 46.01 12.00 19.84 21.08 44.88 1518.93

4368.63 85.95 47.19 20.15 26.86 117.47 65.63 101.23 29.26 48.38 51.40 109.44 5071.59

24.80 7.40 11.01 14.28 14.28 14.28 14.28 11.01 11.01 14.14 10.83 30.40

69.44 20.73 30.81 39.97 39.97 39.97 39.97 30.81 30.81 39.59 30.31 85.12

11.01 10.83 10.71 21.08 44.95 46.91 328.82 12.28 20.36 6.83 12.28 9.00 12.00 44.16 12.28 2.59 22.36 7.40

30.81 30.31 29.97 59.02 125.85 131.34 948.15 34.38 57.01 16.66 34.38 21.95 29.26 107.68 34.38 6.31 62.61 20.73

192.00 22.36 12.40 46.72 12.40 21.72 22.36 13.30 12.28 23.04 14.14 10.71 3.04 3.04 3.00 3.00 12.00 14.14 14.14 3.52 3.52 13.30 12.34 12.09 2.51 12.09 12.34 1340.99

468.17 62.61 34.72 130.82 34.72 60.82 62.61 37.24 34.38 64.51 39.59 29.97 8.51 8.51 7.32 7.32 29.26 34.48 34.48 9.84 9.84 37.24 35.85 35.11 6.13 35.11 35.85 3673.31

NAME

DR TOI.#4 DR TOIL.#1 DR TOIL.#2 DR TOIL.#3 DR. CONSULT #1 DR. CONSULT #1 DR. CONSULT #2 DR. CONSULT #3 EQPMT #1 EQPMT.#2 EXAMI RM.#2 EXAMI. RM. INDOOR PATIENT CIRCULATION JANITOR #4 JENITOR #3 JENITOR #5 JENITOR #6 JENITOR#1 JENITOR#2 LENEN STOCK #2 LENEN STOCK#1 NRS #1 NRS #2 NRS PANTRY #4 NRS PANTRY #5 NRS PANTRY#1 NRS PANTRY#2 NRS PANTRY#3 NRS PANTRY#6 SALA PARA CRIANCAS SALA PARA HOMENS #1 SALA PARA HOMENS #2 SALA PARA HOMENS #3 SALA PARA MULHERES #1 SALA PARA MULHERES #2 SALA PARA MULHERES #3 SALA PARA MULHERES #4 SALA SPL #3 SALA SPL. #1 SALA SPL. #2 SALA SPL. #4 STOCK #3 STOCK #4 TOI #1 TOI #2 TOI #3 TOI #4 TOI V#1 TOI V#2 TOI V#3 TOIL. #1 TOILET #1 TOILET #2 TOILET #3 TOILET #4 TOILET #5 VIP #1 VIP #2 VIP #3 VIP #4 VOI V#4 LEVEL 02: 61

AREA SMT

2.64 2.70 2.70 2.64 17.48 11.20 11.20 17.48 5.80 5.80 5.25 5.25 275.30 2.72 1.68 2.72 1.68 1.33 1.33 4.37 4.14 7.40 7.40 4.40 4.40 4.14 4.47 4.20 4.20 56.19 61.81 61.81 56.19 67.81 56.56 56.56 67.21 11.26 11.26 11.26 11.26 3.40 3.40 2.63 2.63 2.63 2.63 2.63 2.63 2.63 24.38 18.13 18.13 24.38 23.41 23.41 11.26 11.26 11.26 11.26 2.63 1159.90

CARPET AREA SCHEDULE VOLUME CMT

6.44 6.57 6.57 6.44 42.62 27.31 27.31 42.62 14.14 14.14 12.80 12.80 786.68 6.62 4.10 6.62 4.10 3.24 3.24 10.66 10.09 18.05 18.05 10.73 10.73 10.09 10.89 10.24 10.24 157.33 150.71 150.71 157.33 189.86 158.37 158.37 188.18 27.46 31.53 31.53 27.46 8.29 8.29 7.37 7.37 6.42 6.42 6.42 6.42 7.37 68.26 50.76 44.21 68.26 57.08 57.08 27.46 27.46 31.53 31.53 7.37 3118.34

NAME

ADMIN CORRIDOR ADMIN DINING ADMIN TOI.-F ADMIN TOI.-M CORRIDOR CSSD DR ICU DR. REST ROOM DR. TOI. TB DRYING YARD EQP. STERILIZATION EXAMI. GAB.#1 GAB.#2 GAB.#3 GAB.#4 GAB.#5 GAB.#6 GAB.#7 GYM./ DR. REST ICU #1 ICU #2 INCHARGE IRONING SPACE ISO. CIRCULATION JENITOR TB KITCHEN STOCK LAUNDRY LIBRARY/PRAY NRS ICU NRS PANTRY TB NRS REST ROOM Room SALA DE ESPERA SALA DE REUNIOES SALA DE TRATAMENTO TB SALA PARA TB STAFF DINING STAFF KITCHEN STAFF TOILET STOCK STOCK STOCK #1 STOCK #2 STOCK MEDI TB TOI. ICU#2 TOIL. ICU#1 TOILET INFE. LEVEL 03: 48 Grand total: 178

AREA SMT

107.13 43.96 8.74 13.23 127.58 40.12 7.40 17.48 2.64 43.52 16.84 5.25 9.44 15.83 10.14 9.63 9.63 10.14 15.83 45.48 49.18 49.18 6.04 24.92 27.13 1.68 6.65 11.35 9.44 12.81 4.20 14.44 5.17 53.64 84.48 17.48 56.19 85.44 19.91 9.31 10.73 9.88 5.92 6.04 3.40 2.97 2.97 24.38 1174.92 5194.73

VOLUME CMT

289.25 118.69 23.60 32.26 311.09 97.83 18.05 42.62 6.44 106.12 41.06 12.80 23.02 38.60 24.73 23.47 23.47 24.73 38.60 110.90 132.79 132.79 14.73 60.76 73.24 4.10 16.22 27.66 23.02 31.23 10.24 35.21 12.61 130.80 206.00 42.62 151.71 208.34 48.55 22.70 26.16 24.09 14.43 14.73 8.29 7.24 7.24 65.83 2960.64 14823.88

STRUCTURAL COLUMN SCHEDULE Column VOLUME Location Mark CMT Length 16100.000 A-5 16100.000 A-6 16100.000 B-5 16100.000 B-6 16100.000 C-2 16100.000 C-3 16100.000 C-4 16100.000 C-5 16100.000 C-6 16100.000 C-7 16100.000 C-8 16100.000 C-9 16100.000 D-2 16100.000 D-3 16100.000 D-4 19600.000 D-5 19600.000 D-6 16100.000 D-7 16100.000 D-8 16100.000 D-9 19600.000 E-1 19600.000 E-2 16100.000 E-3 16100.000 E-4 19600.000 E-5 19600.000 E-6 16100.000 E-7 16100.000 E-8 19600.000 E-9 19600.000 E-10 19600.000 F-1 19600.000 F-2 16100.000 F-3 16100.000 F-4 16100.000 F-5 16100.000 F-6 16100.000 F-7 16100.000 F-8 19600.000 F-9 19600.000 F-10 19600.000 G-1 19600.000 G-2 16100.000 G-3 16100.000 G-4 16100.000 G-5 16100.000 G-6 16100.000 G-7 16100.000 G-8 19600.000 G-9 19600.000 G-10 Grand total: 50

THICKNESS

100.000 200.000 200.000 Grand total: 709

STRUCTURAL BEAM SCHEDULE Reference VOLUME Level CMT Count Type

5.65 5.74 5.74 5.74 5.70 5.80 5.80 5.80 5.80 5.80 5.80 5.80 5.80 5.80 5.80 7.06 7.06 5.80 5.80 5.80 7.06 7.06 5.80 5.80 7.06 7.06 5.80 5.80 7.06 7.06 6.98 7.06 5.80 5.80 5.80 5.80 5.80 5.80 7.06 6.98 7.06 6.98 5.80 5.80 5.80 5.80 5.80 5.80 7.06 7.06 309.34

BASEMENT 1 LEVEL 01 LEVEL 02 LEVEL 03 LEVEL 04 LEVEL 05 : 100 Grand total: 100

Level BASEMENT 1 BASEMENT 1 BASEMENT 1 BASEMENT 1 BASEMENT 1: 4 LEVEL 00 LEVEL 00 LEVEL 00 LEVEL 00: 3 LEVEL 01 LEVEL 01 LEVEL 01 LEVEL 01 LEVEL 01: 4 LEVEL 02 LEVEL 02 LEVEL 02 LEVEL 02: 3 LEVEL 03 LEVEL 03 LEVEL 03 LEVEL 03: 3 LEVEL 04 LEVEL 04 LEVEL 04 LEVEL 04: 3 LEVEL 05 LEVEL 05 LEVEL 05: 2 Grand total: 22

0.00 0.00 439.25 618.34 348.89 1406.48

2 17 20 25 24 12

200X450

300X600

BASEMENT 1 LEVEL 01 LEVEL 02 LEVEL 03 LEVEL 04 LEVEL 04 LEVEL 04 Grand total: 7

1758.00 1621.56 1595.00 1533.36 85.88 85.88 69.56 6749.24

259.39

STRUCTURAL SLAB SCHEDULE VOLUME CMT AREA SMT 21.70 100.25 54.57 393.81 570.32 1817.82 145.06 145.06 2107.93 1535.62 87.61 53.21 32.38 1708.82 1390.10 5.12 46.40 1441.62 1610.61 89.52 8.96 1709.09 1392.28 36.00 40.24 1468.52 241.30 21.34 262.64 9268.94

4.34 20.05 10.91 78.73 114.03 363.56 21.76 21.76 407.08 306.90 13.14 7.98 3.24 331.26 278.02 0.51 4.64 283.17 322.12 8.95 0.90 331.97 278.46 3.60 4.02 286.08 48.26 2.13 50.39 1803.98

Type

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

HVM-STR-M-200 HVM-STR-M-200 HVM-STR-M-200 HVM-STR-M-200 HVM-STR-M-200 HVM-STR-M-150 HVM-STR-M-150 HVM-STR-M-200 HVM-STR-M-150 HVM-STR-M-150 HVM-STR-M-100 SILL HVM-STR-M-200 HVM-STR-M-100 SILL HVM-STR-M-100 PROJ AT BBOT HVM-STR-M-200 HVM-STR-M-100 PROJ AT BBOT HVM-STR-M-100 SILL

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

HVM-STR-M-200 HVM-STR-M-100 PROJ AT BBOT HVM-STR-M-100 SILL HVM-STR-M-200 HVM-STR-M-100 SILL

Rev

Base Level BASEMENT 1 BASEMENT 1 BASEMENT 1: 2 LEVEL 00 LEVEL 00: 1 LEVEL 01 LEVEL 01 LEVEL 01 LEVEL 01: 3 LEVEL 03 LEVEL 03 LEVEL 03 LEVEL 03: 3 Grand total: 9

WALL SCHEDULE VOLUME CMT AREA SMT 96.28 174.08 4392.54 3092.46 1745.00 9500.36

0.24 55.06 61.30 60.87 67.84 14.08 259.39

BUILT UP AREA SCHEDULE LEVEL AREA SMT

STAIR MATERIAL TAKEOFF VOLUME Maximum Minimum CMT Top Level Count Riser Height Tread Depth Comments 3.83 3.83 7.66 1.26 1.26 7.24 7.45 3.73 18.42 3.26 3.26 3.36 9.89 37.23

Type

HVM-SHL-M-Curtain Wall HVM-SHL-M-Curtain Wall FRONT HVM-INT-M-100 HVM-INT-M-200 HVM-SHL-M-200

LEVEL 01 1 LEVEL 01 1

150.000 150.000

300.000 300.000

LEVEL 01 1

150.000

300.000

LEVEL 02 1 LEVEL 02 1 LEVEL 02 1

150.000 150.000 150.000

300.000 300.000 300.000

LEVEL 04 1 LEVEL 04 1 LEVEL 04 1

150.000 150.000 150.000

300.000 300.000 300.000

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client :

STAIR #1 STAIR #2 STAIR #3

IGREJA EVANGELICA BAPTISTA DE ANGOLA Project Manager

Consultant : HAREN MANGUKIA

CEILING SCHEDULE Level AREA SMT

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number :

LEVEL 02 LEVEL 01 LEVEL 03 Grand total: 3

1120.28 1026.70 984.24 3131.23

Building Name : Drawing title :

SCHEDULES Original Scale

Drawn

HVM Date :

26-12-2013

Drawing Number

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A0002 00


1

2

3

4

5

6

7

8

N

Key Plan

A

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

B

C

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager

Consultant : HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

SAMPLE IMAGES Original Scale

Drawn

HVM Date :

02-01-2014

Drawing Number

Checked

Authorised

HVM Date :

02-01-2014

HVM Date :

02-01-2014

Size

A1 Rev

1301120 - 00 - HO - A0003 00


1

2

3

4

5

6

7

8

N

Key Plan A2002

1

2

3

4

5

6

1

7

8

9

10

63000

A

7000

7000

7000

7000

7000

7000

7000

7000

7000

G General Notes

7000

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

UP

B

F

7000

UP

2 2

A2002

28000

A2001

E

7000

C UP

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N 7000

D

D Rev

C

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client : +0.000 SSL

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager

B

Consultant : HAREN MANGUKIA

N

1

SITE PLAN 1 : 100

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

SITE PLAN Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A1050 00


1

2

3

4

5

6

7

8

N

Key Plan A2002

11

2

2

A3004

A3004

7000

3

1

5

A3005

7000

A

4

1

2

A3005

7000

7000

63000

1

6

7

A3006

7000

8

2

9

A3006

7000

10

3

A3006

7000

7000

7000

5

1

A4002

A4003

G

2

2

A3003

A3003 STAFF LIFT

BLOOD BANK LIFT SHAFT

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

12.00 m² 29.26 m³

38.40 m² 85.95 m³

ELECTRIC GENERATOR

12.00 m² 26.86 m³

1

General Notes

1

A3003

A3003 -3.000 SSL -3.000 SSL

UP

ELECTRICAL SHAFT

ELECTRICAL SHAFT

-3.000 SSL

14000

UP

F

B

-3.200 SSL

2

PARKING SCHEDULE Level Count

2

A3002

A3002

CENTRAL GAS 21.08 m² 47.19 m³

RAMP START

BASEMENT PARKING 1218.72 m² 4368.63 m³

PUMP ROOM #1

2

-

---

A2002

-

---

-3.000 SSL

300

E LIFT SHAFT

1

C

2

SECURITY

23.44 m² 65.63 m³

1

9.00 m² 20.15 m³

A3002

A3002

6700

A2001

26 Grand total: 26

PUMP ROOM #2 46.01 m² 101.23 m³

39600

-3.000 SSL

3

A4050

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D U/G WATER TANK #1 19.84 m² 48.38 m³

2

MEDICINE STOCK

A3001

52.48 m² 117.47 m³

D

U/G WATER TANK #3

A3001

44.88 m² 109.44 m³

7000

2

U/G WATER TANK #2 21.08 m² 51.40 m³

Rev

C

Purpose of Revision

Date

Authorized

Project :

RAMP END

HOSPITAL BULIDING

1

A4050

1

A3001

Client :

7000

1

A3001

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

B 4600

Project Manager

Consultant : HAREN MANGUKIA

A

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

1

Project no : A2001

1301120

Parcel number : Building Name : Drawing title :

F

1

2

A3004

1

BASEMENT 1 1 : 100

A3004

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

BASEMENT PLAN

N Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A1090 00


1

2

3

4

5

6

7

8

1

2

3

4

5

N

Key Plan

A2002

6

1

7

8

9

10

63000

1

1

A4002

A3004

01

2

01

1

01

A3004

7000

01

01

G

3.04 m² 8.51 m³

PERP ROOM

06

06

06

7000

02

01

A3006

01

3

01

A3006

6.83 m² 16.66 m³

LAB. DE URGENCIA

SALA DE RX

21.08 m² 59.02 m³

02

08

SALA DE OBSERVACAO

21.72 m² 60.82 m³

SALA DE RX

46.72 m² 130.82 m³

SALA DE ECO GRAFIA

22.36 m² 62.61 m³

22.36 m² 62.61 m³

SALA DE MAMO GRAFIA 22.36 m² 62.61 m³

SALA DE TAC 23.04 m² 64.51 m³

06 SUB. ST #2

3.52 m² 9.84 m³

02

04

04

EMERGENCY ENTRY

04

04

04

04

328.82 m² 948.15 m³

01

1

A3003

STAFF ENTRY

01

2

UP A3002

RAMP END

SALA DE REANIMACAO 12.40 m² 34.72 m³

12.28 m² 34.38 m³

1

14.14 m² 39.59 m³

SALA DE TRATAMENTO 14.14 m² 39.59 m³

GAP

02 06

1

02

A3002

CON DE MEDI #1

05

11.01 m² 30.81 m³

DEPOSITO

05

14.14 m² 34.48 m³

7000

02

06

+0.000 SSL

A4011

06

14.28 m² 39.97 m³

UP

CON DE MEDI #4

14.28 m² 39.97 m³

GAP

11.01 m² 30.81 m³

05

10.71 m² 29.97 m³

CONLULTORIO

GAP

02 05

06

14.28 m² 39.97 m³

05

02

12.34 m² 35.85 m³

06

02

06

02

SALA DE TRATAMENTO

06

02

1

TOIL. F #2

10.71 m² 29.97 m³

A4001 05

11.01 m² 30.81 m³

---

A3002

05

1

328.82 m² 948.15 m³

06

TOI. - M #2

05

OPD CIRCULATION

-

CON DE MEDI #5

14.28 m² 39.97 m³

A2002

13.30 m² 37.24 m³

06

10.83 m² 30.31 m³

JENITOR RM

05

02

D

CON DE MEDI #3

2

01

TIME KEEPER

GAB. PARA O CHEFE

05

12.09 m² 35.11 m³

06

9.00 m² 21.95 m³

05

TOIL. -F #1

RAMP START 1

02

12.28 m² 34.38 m³

12.40 m² 34.72 m³

PTS LIFT #1

CON DE MEDI #2 06

ORTHO TRAUMA.

SALA DE MEDICO

CON DE MEDI #6

12.34 m² 35.85 m³

06

06

05

05 UP

12.09 m² 35.11 m³

05

ESTOMA CONSULTO

06

02

GAP

11.01 m² 30.81 m³

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

05

TOIL. A/C 2.51 m² 6.13 m³

05

SAFE

2.59 m² 6.31 m³

05

05

05

2

7000

01

D

24.80 m² 69.44 m³

RECEPTION 02 12.28 m² 34.38 m³

05

2

192.00 m² 468.17 m³

02 ACCOUNT/ HO. ADMIN.

05

SALA DE ESPERA 02

7000

02

ELECT. & TELE COMMUNICATION

QUE FOR REGISTRATION

02 PHARMACY

44.16 m² 107.68 m³

02

02

02

02

C

30.40 m² 85.12 m³

A3001

01

12.28 m² 34.38 m³

Rev

24 +0.989 SSL

01

U/G WATER TANK BELOW

Date

Authorized

Project :

01

PATIENT'S ENTRY 7000

Purpose of Revision

HOSPITAL BULIDING

1

1

A3001

+0.000 SSL

Client :

ENTRANCE FOYER

+0.869 SSL

+0.000 SSL

+0.304 SSL

+0.869 SSL

+0.610 SSL

+0.290 SSL

+0.596 SSL

+0.000 SSL

IGREJA EVANGELICA BAPTISTA DE ANGOLA

B

Project Manager

4600

E

14.14 m² 34.48 m³

05

05

10.83 m² 30.31 m³

06

05

06

STAFF TOILET-M STAFF TOILET-F

06

TOIL.-M #1 02

A3001

05

06

E

A3001

06

7.40 m² 20.73 m³

CONSULTORIO DE URGENCIA

A4021

---

06

GAP

28000

13.30 m² 37.24 m³

2

GAP

28300

05

7000

05

BANCO DE URGENCIA 7.40 m² SALA DE ENFERMAGEM/CHF DE ENF 20.73 m³ SALA DE SO #2

-

C

05

05

SALA DE SO #1 A2001

05

7000

7000

05

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

ELECTRICAL SHAFT

04

OPD CIRCULATION

+1.000 SSL

General Notes

08

3.52 m² 9.84 m³

ELECTRICAL SHAFT

A3003

44.95 m² 125.85 m³

06

SUB. ST #1

2

06

12.00 m² 29.26 m³

06

06 06

2

A4003

STAFF LIFT #1

MAJOR OT

UP

A3002

2

01

3.04 m² 8.51 m³

MINOR OT

2

01

SCRUB #2

20.36 m² 57.01 m³

46.91 m² 131.34 m³

B

01

3.00 m² 7.32 m³

OT CORRIDOR

F

01

7000

02

SCRUB #1

12.00 m² 29.26 m³

1

1

A3006

7000

SHAFT #2

3.00 m² 7.32 m³

PTS LIFT #2

A3003

01

7000

SHAFT #1

07

A3003

7000

01 2 A3005

01

A3005 02

2

01

7000

7000

3200

A

7000

2900

7000

Consultant :

A

HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

1

Project no :

A2001

1

2

A3004

F

1

A3004

LEVEL 01

N

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

1301120

Parcel number : Building Name : Drawing title :

FIRST LEVEL PLAN

1 : 100

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A1101 00


1

2

3

4

5

6

7

8

N

Key Plan

A2002

1

2

A

3

7000

4

7000

7000

1

2

A3004

5

2

49000

7000

7

7000

1

A3004

6

1

7000

2

A3005

8 7000

1

A3005

9 7000

7000

2

A3006

10 3

A3006

A3006

3

A4002

06

06

06

07

DR TOIL.#1

TOILET #1 18.13 m² 50.76 m³

2.70 m² 6.57 m³

06

11.20 m² 27.31 m³

11.20 m² 27.31 m³

09

SALA PARA MULHERES #1

1

DR. CONSULT #2

DR. CONSULT #1

3.24 m³

SALA PARA MULHERES #2

67.81 m² 189.86 m³

A3003

09

B

SALA PARA MULHERES #3

56.56 m² 158.37 m³

56.56 m² 158.37 m³

ELECTRICAL SHAFT

F 2

17.48 m² 42.62 m³

11.26 m² 27.46 m³

1

06

A3002

GAP

1.68 m² 4.10 m³

09

06

06

5.25 m² 12.80 m³

3.40 m² 8.29 m³

NRS PANTRY#3 4.20 m² 10.24 m³

TOI V#1 TOI V#2

TOI #2

TOI #1

VOI V#4

2.63 m² 6.42 m³

2.63 m² 6.42 m³

2.63 m² 7.37 m³

06

2.63 m² 7.37 m³

06

06

SALA SPL. #2 11.26 m² 31.53 m³

TOIL. #1 24.38 m² 68.26 m³

09

06

06

VIP #4

SALA SPL. #1

11.26 m² 31.53 m³

11.26 m² 31.53 m³

09

09

09

NRS STN.

2.63 m² 6.42 m³

06

TOI V#3

JENITOR #3 DR TOIL.#3

GAP

2.63 m² 7.37 m³

SALA PARA CRIANCAS

01

09

56.19 m² 157.33 m³

06

1.68 m² 4.10 m³

2.64 m² 6.44 m³

VIP #3

06

11.26 m² 31.53 m³

TOILET #3 24.38 m² 68.26 m³

09

01

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

01

JANITOR #4

06

2

06 06

JENITOR #5 EQPMT.#2

EQPMT #1

5.80 m² 14.14 m³

06

A3001

A3002

06

06

2.72 m² 6.62 m³

D

---

1

06

06

06

-

09

A4001

275.30 m² 786.68 m³

D

A2002

17.48 m² 42.62 m³

2

INDOOR PATIENT CIRCULATION

2

DR. CONSULT #3

06

TOI #4

01

56.19 m² 157.33 m³

06

EXAMI RM.#2 STOCK #3

11.26 m² 27.46 m³

TOI #3 2.63 m² 7.37 m³

SALA PARA HOMENS #3

06

VIP #2

11.26 m² 27.46 m³

09

2.63 m² 6.42 m³

2.64 m² 6.44 m³

VIP #1

7.40 m² 18.05 m³

5.25 m² 12.80 m³

09

06

DR TOI.#4 JENITOR #6

NRS #2

7.40 m² 18.05 m³

A3002

09

EXAMI. RM.

NRS STN.

09

09

NRS #1

2

01

09

SALA SPL. #4

11.26 m² 27.46 m³

06

---

C

ELECTRICAL SHAFT

02

SALA SPL #3

3.40 m² 8.29 m³

09

DR. CONSULT #1

-

STOCK #4

A3003

08

4.47 m² 10.89 m³

275.30 m² 786.68 m³

4.20 m² 10.24 m³

E

NRS PANTRY#2

4.37 m² 10.66 m³

09

1

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

06

INDOOR PATIENT CIRCULATION

NRS PANTRY#6

A2001

09

LENEN STOCK #2

09

2

3.24 m³

06

01

A3002

JENITOR#206 1.33 m²

67.21 m² 188.18 m³

4.14 m² 10.09 m³

02

18.13 m² 44.21 m³

SALA PARA MULHERES #4

LENEN STOCK#1

4.14 m² 10.09 m³

2

A3003

TOILET #2

2.70 m² 6.57 m³

09

NRS PANTRY#1

General Notes

06

09

UP 08

06

06

DR TOIL.#2 06

JENITOR#1 06 1.33 m²

09

06

7000

A3003

06

28000

06

7000

06

7000

06

5.80 m² 14.14 m³

09 GAP

06 09

SALA PARA HOMENS #1

DOUBLE HEIGHT SPACE

SALA PARA HOMENS #2 61.81 m² 150.71 m³

61.81 m² 150.71 m³

06

2.72 m² 6.62 m³

06

2

06

09 GAP

A3001

7000

2

G

A4003

06 09

Rev

06

09

TOILET #5

09

TOILET #4 NRS PANTRY #5

06

4.40 m² 10.73 m³

C

23.41 m² 57.08 m³

NRS PANTRY #4 4.40 m² 10.73 m³

Date

Authorized

Project :

06

23.41 m² 57.08 m³

Purpose of Revision

HOSPITAL BULIDING

06

Client :

1

1

A3001

7000

A3001

E

11600

2

IGREJA EVANGELICA BAPTISTA DE ANGOLA

A3006

Project Manager

B 4600

Consultant : HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

A

Parcel number : 1

2

A3004

F

1301120

1

A3004

LEVEL 02

N

1

A3005

2

A3005

1 A2001

1

A3006

3

A3006

Building Name : Drawing title :

SECOND LEVEL PLAN

1 : 100

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A1102 00


1

2

3

4

5

6

7

8

1

2

3

7000

7000 2

A3004

5

7000

1

A

4

3

6

1

63000

7000

7

7000

1

A3004

8

7000

2

A3005

7000

1

A3005

9 7000

7000

2

A3006

10 3

A3006

A3006

4

A4002

A4003 06

07

A3003

06

LAUNDRY

STAFF KITCHEN

11.35 m² 27.66 m³

03

19.91 m² 48.55 m³

9.31 m² 22.70 m³

GYM./ DR. REST 45.48 m² 110.90 m³

DRYING YARD CSSD

A3003

09

40.12 m² 97.83 m³

09

08

INCHARGE 6.04 m² 14.73 m³

04

ELECTRICAL SHAFT

IRONING SPACE

43.52 m² 106.12 m³

09

06

24.92 m² 60.76 m³

06

STOCK #1 5.92 m² 14.43 m³

1

A3003

STAFF DINING 85.44 m² 208.34 m³

UP

2

A3003

STAFF TOILET

09

1

F

06 06

10.73 m² 26.16 m³

EQP. STERILIZATION 16.84 m² 41.06 m³

B

06

STOCK

7000

2

G

N

Key Plan

A2002

06

KITCHEN STOCK

STOCK #2

6.65 m² 16.22 m³

6.04 m² 14.73 m³

08

02

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

ELECTRICAL SHAFT

02

CORRIDOR

01

STOCK MEDI TB 3.40 m² NRS PANTRY TB 8.29 m³ 4.20 m² 10.24 m³

09 2

17.48 m² 42.62 m³

---

E

49.18 m² 132.79 m³

NRS STN.

09

09

01

NRS REST ROOM 14.44 m² 35.21 m³

06 TOIL. ICU#1

06 TOI. ICU#2

2.97 m² 7.24 m³

STOCK

DR. REST ROOM

9.88 m² 24.09 m³

17.48 m² 42.62 m³

-

---

GAP

1.68 m² 4.10 m³

06

A3002

SALA PARA TB

09

56.19 m² 151.71 m³

06 06 06

GAP

ICU #2

01

49.18 m² 132.79 m³

09

27.13 m² 73.24 m³

8.74 m² 23.60 m³

UP

ADMIN DINING

TOILET INFE.

43.96 m² 118.69 m³

24.38 m² 65.83 m³

13.23 m² 32.26 m³

01

02 GAP

03

LIBRARY/PRAY

2

9.44 m² 23.02 m³

53.64 m² 130.80 m³

GAB.#7 15.83 m² 38.60 m³

09

09

09

09

09

GAB.#3

GAB.#6

10.14 m² 24.73 m³

10.14 m² 24.73 m³

GAB.#5

OPEN TERRACE

2

09 09

+9.400 SSL

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

GAB.#1

09

A3001

06

01

SALA DE ESPERA

9.44 m² 23.02 m³

06

09

06

D

06 06

A4001

107.13 m² 289.25 m³

A3002

06

ADMIN TOI.-M

3

ADMIN CORRIDOR

1

06

ADMIN TOI.-F

ISO. CIRCULATION

06

D

A2002

06

DR. TOI. TB JENITOR TB

1

2

2.97 m² 7.24 m³

06 2.64 m² 6.44 m³

C

Room

5.17 m² 12.61 m³

09

ICU #1

09

09

06

7.40 m² 18.05 m³

12.81 m² 31.23 m³

SALA DE TRATAMENTO TB

-

NRS ICU

01

01

DR ICU

A3002

39600

A2001

09

EXAMI. 5.25 m² 12.80 m³

2

01

7000

A3002

127.58 m² 311.09 m³

01

7000

01

GAB.#2

7000

2

+9.400 SSL

15.83 m² 38.60 m³

A3001

GAB.#4 9.63 m² 23.47 m³

9.63 m² 23.47 m³

OPEN TERRACE Rev

C

Purpose of Revision

Date

Authorized

03

Project : HOSPITAL BULIDING

SALA DE REUNIOES 84.48 m² 206.00 m³

1

1

7000

A3001

A3001

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

B

Project Manager

4600

E

Consultant : HAREN MANGUKIA

A 1

2

A3004

A3004

1

A3005

2

1

2

A3005

1

A2001

A3006

A3006

3

A3006

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F 1

LEVEL 03

N

THIRD LEVEL PLAN

1 : 100 Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A1103 00


1

2

3

4

5

6

7

8

N

Key Plan

2

1

A3003

2

A3003

G

-

A3002

1

---

F

2

A3002

1

A3001

E

D

A3001

C

A B

A +16.400 LEVEL 05

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

+12.900 LEVEL 04

+9.400 LEVEL 03

B

+5.200 LEVEL 02

+1.000 LEVEL 01 +0.000 LEVEL 00

C 2

LEFT ELEVATION

1

A3003

2

-

A3002

---

1

2

A3002

A3001

1

A3001

1 : 100

1

2

A3004

1

2

A3003

1

A3004

2

2

A3005

3

A3005

4

1

2

A3006

5

6

7

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

3

A3006

A3006

8

9

10 +16.400 LEVEL 05

D

Rev

Purpose of Revision

Date

Authorized

Project :

3500

+12.900 LEVEL 04

HOSPITAL BULIDING

Client :

+9.400 LEVEL 03

4200

E

IGREJA EVANGELICA BAPTISTA DE ANGOLA Project Manager +5.200 LEVEL 02

4200

Consultant : HAREN MANGUKIA

+1.000 LEVEL 01 +0.000 LEVEL 00

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F 1

A3004

2

A3004

1

A3005

2

A3005

1

A3006

2

A3006

ELEVATIONS 01

3

A3006 Original Scale

1

FRONT ELEVATION 1 : 100

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A2001 00


1

2

3

4

5

6

7

8

N

Key Plan 1

2

A3001

1

A3001

C

A

A

-

A3002

---

D

2

1

A3002

2

A3003

E

A3003

F

G

B +16.400 LEVEL 05

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

+12.900 LEVEL 04

+9.400 LEVEL 03

B

+5.200 LEVEL 02

+1.000 LEVEL 01 +0.000 LEVEL 00

C 2

1

RIGHT ELEVATION

2

A3001

1

A3001

-

A3002

---

2

1

A3002

2

A3003

A3003

1 : 100

3

2

A3006

10

1

A3006

9

8

A3006

7

2

1

A3005

6

2

A3005

5

4

1

A3004

3

A3004

2

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

1 +16.400 LEVEL 05

D Rev

+12.900 LEVEL 04

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client : +9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager +5.200 LEVEL 02

Consultant : HAREN MANGUKIA

+1.000 LEVEL 01 +0.000 LEVEL 00

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : 3

A3006

F

2

A3006

1

A3006

2

A3005

1

A3005

2

A3004

1

A3004

Drawing title :

ELEVATIONS 02

1

REAR ELEVATION 1 : 100

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Checker Date :

26-12-2013

Authorised

Approver Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A2002 00


1

2

3

4

5

6

7

8

N

Key Plan 1

2

A3004

1

A3004

1

2

2

A3005

A3005

3

4

1

2

A3006

5

3

A3006

6

7

A3006

8

9

10

A 3500

+16.400 LEVEL 05

3500

+12.900 LEVEL 04

B

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

4200

+9.400 LEVEL 03

General Notes

4200

+5.200 LEVEL 02

1000

+1.000 LEVEL 01

3200

3200

C

+0.000 LEVEL 00 U/G WATER TANK #1

BASEMENT PARKING

19.84 m² 48.38 m³

BASEMENT PARKING

1218.72 m² 4368.63 m³

U/G WATER TANK #3

1218.72 m² 4368.63 m³

44.88 m² 109.44 m³

-3.200 BASEMENT 1

2

A3001

SECTION 02 SCALE

1 : 100

1

2

A3004

1

A3004

1

2

A3004

1

2

A3004

2

A3005

A3005

1

3

A3005

2

4

5

A3005

1

2

A3006

1

A3006

3

A3006

2

6

7

A3006

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

A3006

3

8

9

A3006

10 +16.400 LEVEL 05

D

Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

+12.900 LEVEL 04

Client :

+9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager

+5.200 LEVEL 02

Consultant : HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

+1.000 LEVEL 01

Project no :

+0.000 LEVEL 00

Parcel number :

1301120

Building Name : Drawing title :

F

SECTIONS 01

-3.200 BASEMENT 1

1

A3001

SECTION 01 SCALE

1

A3004

1 : 100

Original Scale

Drawn

HVM

2

A3004

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

1 : 100

-6.200 BASEMENT 2

Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3001 00


1

2

1

3 2

A3004

1

A3004

1

4 2

A3005

2

5 1

A3005

3

4

6

8

2

A3006

5

7

A3006

6

N

Key Plan

3

A3006

7

8

9

10

A 3500

+16.400 LEVEL 05

General Notes

3500

+12.900 LEVEL 04

B

4200

+9.400 LEVEL 03

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

INDOOR PATIENT CIRCULATION 275.30 m² 786.68 m³

4200

+5.200 LEVEL 02

OPD CIRCULATION 328.82 m² 948.15 m³

+1.000 LEVEL 01

C

4200

+0.000 LEVEL 00

BASEMENT PARKING 1218.72 m² 4368.63 m³

-3.200 BASEMENT 1

2

A3002

SECTION 04 SCALE

1 : 100

1

2

A3004

1

1

A3004

1

2

2

A3004

2

A3005

3

A3004

1

4

A3005

5

1

A3005

A3006

A3005

A3006

2

1

2

6

3

A3006 2 A3006

7

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

8

9

3 A3006 A3006

10 +16.400 LEVEL 05

D

Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

+12.900 LEVEL 04

SALA PARA TB

ISO. CIRCULATION

56.19 m² 151.71 m³

TOILET INFE. 24.38 m² 65.83 m³

ICU #1

27.13 m² 73.24 m³

ICU #2

49.18 m² 132.79 m³

ADMIN CORRIDOR

49.18 m² 132.79 m³

ADMIN DINING

107.13 m² 289.25 m³

Client :

ADMIN TOI.-F

43.96 m² 118.69 m³

8.74 m² 23.60 m³

+9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

TOIL. #1

2

TOI #2

24.38 m² 68.26 m³

2.63 m² 7.37 m³

VIP #4

TOI #1

SALA PARA CRIANCAS

INDOOR PATIENT CIRCULATION

11.26 m² 31.53 m³

2.63 m² 7.37 m³

56.19 m² 157.33 m³

275.30 m² 786.68 m³

Project Manager

TOILET #3 24.38 m² 68.26 m³

A4021

+5.200 LEVEL 02

Consultant : TOIL.-M #1

DEPOSITO

12.34 m² 35.85 m³

10.83 m² 30.31 m³

CON DE MEDI #1 11.01 m² 30.81 m³

OPD CIRCULATION 328.82 m² 948.15 m³

CON DE MEDI #2 14.28 m² 39.97 m³

CON DE MEDI #4

CON DE MEDI #3

14.28 m² 39.97 m³

14.28 m² 39.97 m³

CON DE MEDI #6

CON DE MEDI #5

11.01 m² 30.81 m³

14.28 m² 39.97 m³

GAB. PARA O CHEFE 10.83 m² 30.31 m³

HAREN MANGUKIA

TOI. - M #2 12.34 m² 35.85 m³

+1.000 LEVEL 01 +0.000 LEVEL 00 BASEMENT PARKING

F

Project no :

1301120

Parcel number : Building Name :

BASEMENT PARKING

1218.72 m² 4368.63 m³

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

1218.72 m² 4368.63 m³

Drawing title :

PUMP ROOM #2 46.01 m² 101.23 m³

SECTIONS 02

-3.200 BASEMENT 1

1

A3002

SECTION 03 1 SCALE A3004

1 : 100

Original Scale

2

A3004

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3002 00


1

2

3

4

5

6

7

8

N

Key Plan 1 1A3004

2

2

A3004

3

4

1

A3005

5

2

A3005

1

A3006

6

7

2

A3006

8

9

3

A3006

10 +16.400 LEVEL 05

A

+12.900 LEVEL 04

+9.400 LEVEL 03

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

B +5.200 LEVEL 02

+1.000 LEVEL 01 +0.000 LEVEL 00

C

-3.200 BASEMENT 1

2

A3003

SECTION 06 SCALE

1 : 100

1

2

A3004

1

A3004

1 1A3004

2

2

A3004

2

A3005

3

A3005

4

1

A3005

5

2

A3005

2

1

A3006

1

A3006

3

A3006

6

7

2

A3006

-6.200 BASEMENT 2

A3006

8

9

3

A3006

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

10 +16.400 LEVEL 05

D 800

+12.900 LEVEL 04

Rev

Purpose of Revision

Authorized

Project :

2700

HOSPITAL BULIDING

Client :

1400

+9.400 LEVEL 03

FALSE CEILING

2800

IGREJA EVANGELICA BAPTISTA DE ANGOLA +5.200 LEVEL 02

1400

E

Date

Project Manager

2800

Consultant :

+1.000 LEVEL 01 +0.000 LEVEL 00

HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : -3.200 BASEMENT 1

F 1

A3003

Drawing title :

SECTIONS 03

SECTION 05 SCALE

1

A3004

1 : 100

2

A3004

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

-6.200 BASEMENT 2

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3003 00


1

2

3

4

5

6

7

8

N

Key Plan

G

F 2

1

A3003

E 2

A3003

A3002

-

D

C

1

---

B

2

A3002

A +16.400 LEVEL 05

1

A3001

A3001

A 3500

+12.900 LEVEL 04

General Notes

2800

4200

1400

+9.400 LEVEL 03

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

+5.200 LEVEL 02

4200

B

1000

+1.000 LEVEL 01 +0.000 LEVEL 00

-3.200 BASEMENT 1

C

2

A3003

2

A3004

1

2

A3003

A3002

-

1

---

2

A3002

1

A3001

A3001 -6.200 BASEMENT 2

SECTION 08 SCALE

1 : 100

2 GA3003

1

F

A3003

2

A3002

-

---

E

1

A3002

2

D

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

1

C

A3001

A3001

B

A +16.400 LEVEL 05

3500

D

+12.900 LEVEL 04

Rev

Purpose of Revision

Date

Authorized

Project :

3500

HOSPITAL BULIDING

Client :

4200

+9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E 4200

+5.200 LEVEL 02

Consultant : +1.000 LEVEL 01

4200

4200

+0.000 LEVEL 00

2

A4011 CENTRAL GAS 21.08 m² 47.19 m³

U/G WATER TANK #1

PUMP ROOM #1

19.84 m² 48.38 m³

23.44 m² 65.63 m³

21.08 m² 51.40 m³

1

A3004

SECTION 07 SCALE

1 : 100

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Building Name :

F A4002

HAREN MANGUKIA

Parcel number :

U/G WATER TANK #2

-3.200 BASEMENT 1

6

Project Manager

Drawing title :

SECTIONS 04

2

2

A3003

1

A3003

2

A3002

-

---

1

A3002

2

A3001

A4050

1

A3001 -6.200 BASEMENT 2

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3004 00


1

2

3

4

5

6

7

8

N

Key Plan

C 1

2

A3001

A

D

E 1

A3001

F -

A3002

---

5

A4001

2

G 1

A3002

A3003

2

A3003

B +16.400 LEVEL 05

A

+12.900 LEVEL 04

+9.400 LEVEL 03

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

B +5.200 LEVEL 02

+1.000 LEVEL 01 +0.000 LEVEL 00

C

-3.200 BASEMENT 1

2

A3005

1

SECTION 10 SCALE

2

A3001

1

A3001

-

A3002

---

2

1

A3002

A3003

2

A3003

1 : 100

1

A3001

A

C

2

A3001

D

1

A3002

E

-

---

2

A3002

F

1

A3003

2

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

G

A3003

B +16.400 LEVEL 05

D

Rev

+12.900 LEVEL 04

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client : +9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager +5.200 LEVEL 02

Consultant : HAREN MANGUKIA

+1.000 LEVEL 01 +0.000 LEVEL 00

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

-3.200 BASEMENT 1

1

1

A3005

SECTION 09 SCALE

1 : 100

A3001

2

A3001

1

A3002

-

---

2

A3002

1

A3003

2

SECTIONS 05 Original Scale

Drawn

HVM

A3003 -6.200 BASEMENT 2

1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3005 00


1 GA3003 2

2 1

A3003

F

2

A3002

3 -

---

E

1

A3002

4 D

2

A3001

5

6

7

8

N

Key Plan

C

2 GA3003

A

F

1

A3003

2

A3002

-

---

E

D

1

A3002

2

A3001

C

+16.400 LEVEL 05

+16.400 LEVEL 05

+12.900 LEVEL 04

+12.900 LEVEL 04

+9.400 LEVEL 03

+9.400 LEVEL 03

+5.200 LEVEL 02

+5.200 LEVEL 02

+1.000 LEVEL 01

+1.000 LEVEL 01

+0.000 LEVEL 00

+0.000 LEVEL 00

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

3200

B

C

U/G WATER TANK #3 44.88 m² 109.44 m³

-3.200 BASEMENT 1

-3.200 BASEMENT 1

4

2

1

A3003

2

A3006

2

A3003

A3002

-

1

---

A4050

2

A3002

A3001

SECTION 12 SCALE

G

6

A4003

1 : 100

2

1

A3003

A3003

F

2

A3002

-

---

E

1

A3002

D

2

A3001

C

3

A3006

SECTION 13 SCALE

2

A3003

1 : 100

-6.200 BASEMENT 2

1

2

A3003

A3002

-

---

1

A3002

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

2

A3001

1

A3001

B

A +16.400 LEVEL 05

D Rev

+12.900 LEVEL 04

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

Client : +9.400 LEVEL 03

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager +5.200 LEVEL 02

Consultant : HAREN MANGUKIA

+1.000 LEVEL 01 +0.000 LEVEL 00

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : -3.200 BASEMENT 1

F 2

1

A3003

1

A3006

A3003

SECTION 11 SCALE

1 : 100

2

A3002

-

---

1

A3002

2

A3001

1

A3001

Drawing title :

SECTIONS 06 Original Scale

-6.200 BASEMENT 2

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A3006 00


1

2 1

3 E

A3002

4

5

6

7

8

N

Key Plan

-

---

+16.400 LEVEL 05

3500

3500

A

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

2188

+12.900 LEVEL 04

1313

3500

B

4200

2700

+9.400 LEVEL 03

1500

C

+5.200 LEVEL 02

4200

2700

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

1500

D

Rev

+1.000 LEVEL 01

1 : 50

5

1

-

A3002

5

2660

1830

2

6

6

1

A3005

-

1500

-

---

---

5

6

2240

2660

A3005

-

2240

2520

1

A3002

-

---

E

1

A3005

-

---

7000

2

A3006

-

---

E

1

1

1500

1

Client :

A3006

2100

IGREJA EVANGELICA BAPTISTA DE ANGOLA -

2800

---

---

Project Manager

E Consultant :

2240

E

2

A3006

2520

E

2240

A3006

1

A3002A3002

1

A3002

1

A3002

1

A3002

HAREN MANGUKIA

1

A3002

A3002 Architecture, Interior Design, Masterplanning

Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

F

1301120

Parcel number :

2110

1500

2110

UP

1500

-

---

1500

1

7000

A3005

5

---

1500

2

6

+0.000 LEVEL 00

1500

SCALE

Authorized

Project :

1830

A4001

Date

HOSPITAL BULIDING

DETAIL SECTION STAIR #1 SECTION 10

5

Purpose of Revision

Building Name : Drawing title : +9.400 SSL

+1.000 SSL

2

A3005

1

A4001

DETAIL PLAN LEVEL 01 STAIR #1 SCALE

1 : 50

1

N

2

A3006

A3005

2

A4001

DETAIL PLAN LEVEL 02 STAIR #1 SCALE

1 : 50

STAIR #1 DETAILS

+12.900 SSL

+5.200 SSL

1

N

2

A3006

A3005

3

A4001

DETAIL PLAN LEVEL 03 STAIR #1 SCALE

1 : 50

1

N

2

A3006

A3005

4

A4001

DETAIL PLAN LEVEL 04 STAIR #1 SCALE

1 : 50

1

N

A3006

Original Scale

Drawn

HVM 1 : 50 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

24-12-2013

Size

A1 Rev

1301120 - 00 - HO - A4001 00


1

2

3

4

5

6

7

8

N

Key Plan

G

2

1

A3003

F

A3003

1100

A +16.400 LEVEL 05

3500

General Notes

2

1

2

7000 1

7000

1

A3004

A3004

2

A3003

2

STAIR #2

2

A3003

+9.400 LEVEL 03

A3003

1

A3003

1

4200

1

A3003

2100

1

A3003

7000

7000

2100

A3003

G

2042

G

2

3500

B

+12.900 LEVEL 04

1458

1

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

A3003

KEY PLAN STAIR #2

8

N

1 : 1000

2100

+5.200 LEVEL 02

+9.400 SSL

F

F

4200 1

1

2100

C

+1.000 SSL

A3004

A3004

N

N

SCALE

A4002

1 : 75

DETAIL PLAN LEVEL 03 STAIR #2 SCALE

1 : 75

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

+0.000 LEVEL 00

1900

4200

A4002

3

2100

DETAIL PLAN LEVEL 01 STAIR #2

1

+1.000 LEVEL 01

-3.200 BASEMENT 1

D

Rev

2

1

A3003

Purpose of Revision

Date

Authorized

Project :

A3003

HOSPITAL BULIDING

6

A4002

1

2

1

2

SCALE

1 : 75

Client :

1

2

7000

7000

1

DETAIL SECTION STAIR #2 SECTION 07

1

A3004

A3004

E

IGREJA EVANGELICA BAPTISTA DE ANGOLA

7000

1

A3004

Project Manager

G

2

2

A3003

A3003

G

2

G

2

A3003

A3003

2

2

A3003

A3003

A3003

A3003

1

1

A3003

1

A3003

1

A3003

7000

1

7000

1

7000

Consultant :

A3003

7

A4002

3D VIEW STAIR #2 SCALE

HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

+12.900 SSL

+5.200 SSL

F

F 1

5

A4002

A3004

DETAIL PLAN BASEMENT STAIR #2 SCALE

1 : 75

N

STAIR #2 DETAILS

F 1

A3004

2

A4002

DETAIL PLAN LEVEL 02 STAIR #2 SCALE

1 : 75

N

1

4

A4002

A3004

DETAIL PLAN LEVEL 04 STAIR #2 SCALE

1 : 75

N

Original Scale

Drawn

Author As indicated Drawing Number

Date :

03-01-2014

Checked

Checker Date :

03-01-2014

Authorised

Approver Date :

03-01-2014

Size

A1 Rev

1301120 - 00 - HO - A4002 00


1

2

3

4

5

6

7

8

N

Key Plan 2

1

A3003

2

A3003

A3002

G

F

1300

A +16.400 LEVEL 05

General Notes

3300

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

+12.900 LEVEL 04

3700

B

STAIR #3 +9.400 LEVEL 03

4200

3D VIEW STAIR #3 9

10

9

C G

1 : 1000

10 A3006

7000

7000

2

G

2

A3003

2

A3003

2

A3003

A3003

-

-

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

1

1

A3003

A3003

+0.000 LEVEL 00

1

4000

1

A3003

7000

7000

--- +1.000 --LEVEL 01

A3003

D

+9.400 SSL

-3.200 BASEMENT 1

F

F

3

3

A3006

A4003

SCALE

DETAIL PLAN LEVEL 03 STAIR #3

4

A4003

1 : 75

SCALE

3

2

7000

Authorized

Project :

1

A3003

A4003

10

10

A3006

Date

HOSPITAL BULIDING

1 : 75

9

Purpose of Revision

N

6

9

Rev

A3006

N

DETAIL PLAN LEVEL 01 STAIR #3

1700

+1.000 SSL

2

N

+5.200 LEVEL 02

3

3

A3006

KEY PLAN STAIR #3

8

4000

7

2

A3003

A3002

DETAIL SECTION STAIR #3 SECTION 13 SCALE 1 : 75 9 10

3

3

A3006

A3006

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

7000

E

Project Manager

G

2

2

A3003

G

2

A3003

2

A3003

G

A3003

2

2

A3003

A3003

Consultant :

1

A3003

1

1

A3003

1

A3003

7000

7000

HAREN MANGUKIA

1

A3003

A3003

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

1

Project no :

A3003

1301120

Parcel number : Building Name : Drawing title :

-3.000 SSL

F

+12.900 SSL

+5.200 SSL

F

F 3

1

A4003

A3006

DETAIL PLAN BASEMENT STAIR #3 SCALE

1 : 75

3

N

A3006

3

A4003

DETAIL PLAN LEVEL 02 STAIR #3 SCALE

1 : 75

STAIR #3 DETAILS

F

3

N

A3006

5

A4003

DETAIL PLAN LEVEL 04 STAIR #3 SCALE

1 : 75

N

Original Scale

Drawn

HVM As indicated Drawing Number

Date :

03-01-2014

Checked

Authorised

HVM Date :

03-01-2014

HVM Date :

03-01-2014

Size

A1 Rev

1301120 - 00 - HO - A4003 00


1

2

3

4

5

6

7

8

N

Key Plan

A

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

B

1

C

2

1

A3004

F

3200

EMERGENCY ENTRY

2

A3002

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

2

A3002

RAMP END +1.000 SSL

D 200

6100

900

3

3D VIEW RAMP Rev

Purpose of Revision

Date

Authorized

Project : A2001

HOSPITAL BULIDING

2

-

-

---

---

Client : 2

F

---

E

1

A3002

8000

E

-

A3002

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

1

Project Manager

1

A3002

A3002

+1.013 SSL

3200

8000

Consultant :

1000

+1.000 LEVEL 01

UP

+0.000 LEVEL 00

+0.000 SSL

HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number :

RAMP START 1

Building Name :

A3004

Drawing title :

F 2

1

A4011

DETAIL PLAN RAMP LEVEL 01 SCALE

1 : 50

N

A3002

2

A4011

DETAIL SECTION RAMP SECTION 07 SCALE

1 : 50

-

---

RAMP DETAILS

1

A3002 Original Scale

Drawn

HVM 1 : 50 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

24-12-2013

Size

A1 Rev

1301120 - 00 - HO - A4011 00


1

2

3

4

5

6

7

8

N

Key Plan

2

3800 200

A 600

E

1350

750

500

200

100 100 100

1200

02

06

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

GAP

1000

100

600

General Notes

100100

05

600

1

A3002

1000

B 02

1

06

A3002

1000

12.34 m² 35.85 m³

100

2400

100

06

02

1200

600

200

TOIL.-M #1

2300

500

100

2

+5.200 LEVEL 02

1000

1400

FALSE CEILING

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

06

2200

100 02

1100

600

D

100

100

700 02

500

600

7000

C

TOIL. -F #1

06

12.09 m² 35.11 m³

02

06

Purpose of Revision

Date

Authorized

Project :

2800

100

100

600

Rev

HOSPITAL BULIDING

TOIL.-M #1

05

12.34 m² 35.85 m³

1200

02

1200

600

Client :

GAP

IGREJA EVANGELICA BAPTISTA DE ANGOLA

D

Project Manager

600

+1.000 LEVEL 01

200

200

E

600

Consultant : 02

TOIL. A/C

625

1000

2.59 m² 6.31 m³

1500

2.51 m² 6.13 m³

200

HAREN MANGUKIA

SAFE

5010050

1000

675

+0.000 LEVEL 00

100

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

800

Parcel number : Building Name :

F

05

1

A4021

DETAIL PLAN TOILET #1 LEVEL 01 SCALE

1 : 20

05

N

100

Drawing title :

TOILET DETAILS #1

2

A4021

DETAIL SECTION TOIL. #1 SECTION 03 SCALE

1 : 20

Original Scale

Drawn

HVM 1 : 20 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

24-12-2013

Size

A1 Rev

1301120 - 00 - HO - A4021 00


1

2

3

4

5

6

7

8

1

2

1

2

A3004

A3004

A

3

4

1

A3005

5

1

2

1

A3005

6

7

A3006

2

A3006

8

9

3

10

A3006

4

5

A4002

2

N

Key Plan

A2002

A4003

G

2

A3003

A3003

1

1

A3003

A3003

UP

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

F

B 2

2

A3002

A3002

2 A2001

2

-

A2002

-

---

---

E 4

1

A3002

DN

C

1

A4001

A3002

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D

2

2

A3001

A3001

D

+12.900 SSL

LOWER TERRACE

LOWER TERRACE Rev

C

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

1

1

A3001

A3001

IGREJA EVANGELICA BAPTISTA DE ANGOLA

B

E

Client :

Project Manager

Consultant :

A

HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

1

Project no : A2001

1

2

A3004

F

1

LEVEL 04

A3004

N

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

1301120

Parcel number : Building Name : Drawing title :

TERRACE LEVEL PLAN

1 : 100

Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A4041 00


1

2

3

4

5

6

7

8

N

Key Plan

A 2

D

2

D

C

A3001

C

A3001

+0.000 LEVEL 00

3200

3200

+0.000 LEVEL 00

MS LADDER AS/DETAIL U/G WATER TANK #2

U/G WATER TANK #1

U/G WATER TANK #3 44.88 m² 109.44 m³

21.08 m² 51.40 m³

19.84 m² 48.38 m³

-3.200 BASEMENT 1

-3.200 BASEMENT 1

2

2

C

A3001

A3001

2

A4050

DETAIL SECTION U/G TANK#3 SECTION 13

4

DETAIL SECTION U/G TANK SECTION 07 SCALE

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

RCC SLAB AS/STR DETAILS

MANHOLE

B

General Notes

A4050

SCALE

1 : 50

1 : 50

1

1

2

A3004

3

9

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

10

A3006

7000

7000 7000

D

D

D Rev

Purpose of Revision

Date

Authorized

Project :

3200

HOSPITAL BULIDING U/G WATER TANK #1 19.84 m² 48.38 m³

Client : 2

2

2

A3001

A3001

7000

200

A3001

7200

2

A3001

U/G WATER TANK #3 44.88 m² 109.44 m³

IGREJA EVANGELICA BAPTISTA DE ANGOLA

MS LADDER AS/DETAIL

E 3400

Project Manager U/G WATER TANK #2 21.08 m² 51.40 m³

Consultant : HAREN MANGUKIA

C

200

C

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

1

A3004

3

U/G TANK DETAILS

A3006

1

A4050

DETAIL PLAN U/G TANK BASEMENT 1 SCALE

1 : 50

N

3

A4050

DETAIL PLAN U/G TANK #3 BASEMENT 1 SCALE

1 : 50

N Original Scale

Drawn

HVM 1 : 50 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

26-12-2013

Size

A1 Rev

1301120 - 00 - HO - A4050 00


1

2

3

4

5

6

7

8

N

Key Plan

C

900.000

2200.000

900X2200

5200.000

1500.000 1500.000 1500.000 750.000

2200.000 2200.000 2200.000 2200.000

1000X2100 1500X2200 1500X2200 750 x 1800 SERV DOOR

0.000 400.000 400.000 2000.000

1625.000 1800.000 1200.000 1000.000 750.000 750.000 1000.000 3763.205 1000.000

2200.000 2200.000 2200.000 2200.000 2200.000 2200.000 1400.000 2129.808 2200.000

1625X2200 1800X2200 1200X2200 1000X2200 WD 750 x 2200 750 x 1800 SERV DOOR 1000X1400 LD MAIN DOOR 1000 x 2200 OPENINGS

0.000 0.000 0.000 0.000 0.000 2100.000 1000.000

1625.000 1800.000 900.000 750.000 900.000 750.000 1000.000 1000.000

2200.000 2200.000 2200.000 2200.000 2200.000 2200.000 1400.000 2200.000

1625X2200 1800X2200 900X2200 750 x 2200 900X2200 750 x 1800 SERV DOOR 1000X1400 LD 1000 x 2200 OPENINGS

0.000 0.000 0.000 0.000 0.000 2100.000 800.000 0.000

1625.000 1800.000 1500.000 1200.000 750.000 750.000 1000.000 900.000 1625.000 1000.000

2200.000 2200.000 2200.000 2200.000 2200.000 2200.000 1400.000 2200.000 2200.000 2200.000

1625X2200 1800X2200 1200X2200 750 x 2200 750 x 1800 SERV DOOR 1000X1400 LD 900X2200 1625X2200 1000 x 2200 OPENINGS

0.000 0.000 0.000 0.000 0.000 2100.000 1000.000 0.000 0.000 0.000

1500.000

2200.000

1500X2200

0.000

1500

1200

1000

750

750

1000

900

Count 2 2 2 1 1 1 5 2 3 7 31 29 1 2 1 6 82 6 2 27 51 1 1 2 4 94 9 3 3 1 25 1 2 22 1 3 70 3 3 256

0.000

1400

:2 BASEMENT 1 03 BASEMENT 1 5 BASEMENT 1 6 BASEMENT 1 07 BASEMENT 1: 5 LEVEL 01 01 LEVEL 01 02 LEVEL 01 04 LEVEL 01 05 LEVEL 01 06 LEVEL 01 07 LEVEL 01 08 LEVEL 01 10 LEVEL 01 GAP LEVEL 01: 82 LEVEL 02 01 LEVEL 02 02 LEVEL 02 05 LEVEL 02 06 LEVEL 02 7 LEVEL 02 07 LEVEL 02 08 LEVEL 02 GAP LEVEL 02: 94 LEVEL 03 01 LEVEL 03 02 LEVEL 03 03 LEVEL 03 04 LEVEL 03 06 LEVEL 03 07 LEVEL 03 08 LEVEL 03 09 LEVEL 03 12 LEVEL 03 GAP LEVEL 03: 70 LEVEL 04 03 LEVEL 04: 3 Grand total: 256

Sill Height

1800

800

05

1625

General Notes

ELEVATION

PLAN

TYPE 01

TYPE 02

TYPE 03

TYPE 04

TYPE 05

TYPE 06

TYPE 07

TYPE 08

TYPE 09

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

DOOR LEGENDS SCALE

1 : 50

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

1800

1200

D

1000

B

Mark

Opening Width

2200

A

Level

SCHEDULE OF DOOR Opening Height Type

Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

LEVEL

Type Mark

SCHEDULE OF WINDOW Width Height Head Height

Sill Height

Count

E

1800.000 600.000

1200.000 1000.000

2200.000 2200.000

1000.000 1200.000

1800.000 600.000

1200.000 1000.000

2200.000 2200.000

1000.000 1200.000

1800.000 600.000

1200.000 1000.000

2200.000 2200.000

1000.000 1200.000

22 23 45 22 36 58 24 24 48 151

1000

LEVEL 01 01 LEVEL 01 02 LEVEL 01: 45 LEVEL 02 01 LEVEL 02 02 LEVEL 02: 58 LEVEL 03 01 LEVEL 03 02 LEVEL 03: 48 Grand total: 151

1200

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

ELEVATION

Project Manager

1798

Consultant :

PLAN

TYPE 01

TYPE 02 HAREN MANGUKIA Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

WINDOWS LEGENDS SCALE

1 : 20

Project no :

1301120

Parcel number : Building Name : Drawing title :

F

DOOR/WINDOW DETAILS Original Scale

Drawn

HVM As indicated Drawing Number

Date :

07-01-2014

Checked

Authorised

HVM Date :

07-01-2014

HVM Date :

07-01-2014

Size

A1 Rev

1301120 - 00 - HO - A5011 00


1

2

3

4

5

A2002

6

7

8

N

Key Plan

11

2

A3004

2

A3004

3

1

A3005

4

5

1

2

1

A3005

A3006

6

7

2

A3006

8

9

3

10

A3006

A G

2

2

A3003

A3003

General Notes

1

1

A3003

A3003

F

B

2

1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

2

A3002

A3002

2 2

A2001

-

A2002

-

---

---

E 1

1

A3002

A3002

C

D

2

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

2

A3001

A3001

D C

Rev

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING 1

1

A3001

A3001

Client :

IGREJA EVANGELICA BAPTISTA DE ANGOLA

B

E

Project Manager

Consultant :

A

HAREN MANGUKIA

1

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

A2001

Project no :

1301120

Parcel number : 1

2

A3004

F 1

RCP LEVEL 01 1 : 100

A3004

1

A3005

2

A3005

1

A3006

2

A3006

3

A3006

Building Name : Drawing title :

RCP LEVEL 01

N Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

23-12-2013

Size

A1 Rev

1301120 - 00 - HO - A6001 00


1

2

3

4

5

6

7

8

N

Key Plan A2002

1

2 1

A

2

A3004

2

3

A3004

4 1

A3005

5

6

1

2

1

A3005

A3006

7

8 2

A3006

9

10 3

A3006

G

2

A3003

A3003

1

1

A3003

B

A3003

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

F 2

2

A3002

A3002

2 A2001

2

-

A2002

-

---

---

E 1

C

1

A3002

A3002

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D

2

2

A3001

A3001

D Rev

C

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

1

1

A3001

Client :

A3001

2

IGREJA EVANGELICA BAPTISTA DE ANGOLA

A3006

E

B

Project Manager

Consultant : HAREN MANGUKIA

A 1

2

A3004

A3004

1

A3005

2

A3005

1 A2001

1

A3006

3

A3006

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F 1

RCP LEVEL 02 1 : 100

RCP LEVEL 02

N Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

23-12-2013

Size

A1 Rev

1301120 - 00 - HO - A6002 00


1

2

3

4

5

6

7

8

N

Key Plan A2002

1

2 1

A

2

A3004

2

3

A3004

4 1

A3005

5

6

1

2

1

A3005

A3006

7

8 2

A3006

9

10 3

A3006

G

2

A3003

A3003

1

1

A3003

B

A3003

General Notes 1.THIS DRAWING IS COPYRIGHT PROTECTED. 2.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE. 3.DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 4.ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL & SERVICES SHALL BE BROUGHT TO ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT SITE. 5.ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO THE SITE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 6.ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER WITH THE SPECIFICATION.

F 2

2

A3002

A3002

2 2

A2001

-

A2002

-

---

---

E 1

C

1

A3002

A3002

ION TION T INALY: RUC D OR ON NST O E O R CPOS R C O F UR FO P OT N

D

2

2

A3001

A3001

D Rev

C

Purpose of Revision

Date

Authorized

Project : HOSPITAL BULIDING

1

1

A3001

Client :

A3001

IGREJA EVANGELICA BAPTISTA DE ANGOLA

E

Project Manager

B

Consultant : HAREN MANGUKIA

A 1

2

A3004

A3004

1

A3005

2

1

2

A3005

1

A2001

A3006

A3006

3

A3006

Architecture, Interior Design, Masterplanning Sanzi Real Estates, Luanda, Angola cell : +244 928544174 email : haren.mangukia@gmail.com

Project no :

1301120

Parcel number : Building Name : Drawing title :

F 1

RCP LEVEL 03 1 : 100

RCP LEVEL 03

N Original Scale

Drawn

HVM 1 : 100 Drawing Number

Date :

26-12-2013

Checked

Authorised

HVM Date :

26-12-2013

HVM Date :

23-12-2013

Size

A1 Rev

1301120 - 00 - HO - A6003 00

1301120 ho ieba 20140107  

HOSPITAL BUILDING IEBA, Luanda, Angola