New Holland D180C BD Crawler Dozer Service Repair Manual

Page 28

Engine - Turbocharger and lines

Turbocharger - Remove LA

D180C

1. Park the machine on a firm level surface. Lower all of the equipment to the ground. 2. Engage the parking brake and shut the engine off. 3. Relieve the hydraulic system of hydraulic pressure by actuating all of the hydraulic functions. Remove the ignition key when complete. 4. Open the battery access door.

RAIL14DOZ0182AA

1

NOTICE: Wait 90 seconds after engine shutdown before turning master battery disconnect switch OFF. After engine shutdown, the Selective Catalytic Reduction (SCR) system module continues to run and conducts a purge cycle. 5. Turn the master battery disconnect switch (1) to the OFF position.

RAIL12DOZ0927BA

6. Disconnect the negative ( - ) battery cable (2) from the battery negative terminal (3).

71114549 16/03/2015

10.4 [10.250] / 3

2


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.