Simplcity Shrewsbury Instructions

Page 24

Attach upper door track 10 to the two bolts left ready in section 2 with nuts (position 10 vertically and push it through the central section between the two glaze bars. Twist 10 so that the slots in the mounting bar are facing upwards). Slide doors into upper track (10) and lower track (184), adjust the height of 10 until the door is running smoothly leaving enough room for the pane of glass above.

10

2530

1

167

380

2

300

n/a

2

Two brackets are supplied to help support each end of the door track ‘10’ when the doors are in the open position. A hole is prepunched into the rear face of ‘10’ at each end. A correspondent hole is located in each roof corner bars to accommodate the bracket ‘300’.

10

Carefully remove 2 nuts from door rear and attach door stop/ handles (see diagrams below). Re attach the nuts!

184


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.