PUBLIC IMPACTS: (NOTE: Dates are subject to change based on potential weather impacts.)

CONSTRUCTION HOT SPOTS

4

21ST AVE

December 12, 2011 December 18, 2011

E. 20TH AVE.

1. There will be added construction traffic at the south end of the Mother-Baby entrance to prepare for the relocation of the Pet CT Scan 12/12 through 12/21. 2. Debris removal at Midtown II will continue through Mid-December. 3. Med Park Garage is closed. The sidewalk on the west side of Lafayette, south side of 20th Ave, and east side of Downing will be closed. See map. 4. 20th Ave east of new Downing and 21st Ave east of new Downing will be reopened on 12/12. 5. Traffic will be flagged in both directions of traffic on 12/14 to set the signal mast arms. 6. Striping and crack fill of the asphalt will take place on 12/12-12/13 in the Humboldt Circle. Traffic will be flagged around operations. 7. Water crews will be in Lafayette Street on 12/16 for water tie-ins. Access to Russell Pavilion will be from 20th Ave. Access to Marian Plaza will be from Lafayette. See Map 8. Lafayette Street will be vacated at 7:00 am on 12/17. Access to Russell Pavilion will be from 20th Ave. See map

4

6

8

DOWNING ST.

NEW MIDTOWN

E. 20TH AVE.

MED-PARK GARAGE

3

2

5 E. 19TH AVE. OW

7

1

FRANKLIN ST.

LAFAYETTE ST.

EXEMPLA SAINT JOSEPH HOSPITAL MARION ST.

OGDEN ST.

D

E. 18TH AVE.

Saint Joseph Heritage Project | Enabling Work


Construction Hot Spots for St Joseph  

We will identify the HOT SPOTS daily