Page 1


TYPOLOGY ATLAS

The types of the partments in the residential complex


Location

Binasco is located halfway alone the road connecting Milano to Pavia. Its position has always been considered strategic and this is the reason why Binasco has represented and still represent a reference point for the neighboring towns. Binasco is connected to both Milano and Pavia by mean of public transportation and it can be easily reached by car through the A7 highway. The Binasco Castle is located in the center of Binasco and together with the main church and with the porches of Via Matteotti, it represents the beating heart of the social, cultural and political life.

Binasco is located halfway alone the road connecting Milano to Pavia.

the NapoleonicIts age and has in 1869 byconsidered a ruinousstrategic fire. The aspect position alwayshit been andcurrent this is the reason is the result of subsequent restorations that gave back sense ofand the Two towers why Binasco hasthe represented stillancient representfortress. a reference point for are still visible along the south front. the neighboring towns. Binasco is connected to both Milano and Pavia by mean of public transportation and it can be easily reached by car through the A7 highway.

The castle originated from a stronghold built by the Visconti in the 14th century to take care of their land in the area. Probably between 1315 and 1319 the nearby church of Saint Stephan was founded and the castle built by Luchino Visconti, Lord of Milan. The first mention of a castle in Binasco dates back to 1329, when it was used by Azzone Visconti and his uncle Giovanni as a prison for their political opponents. In the 17th century the castle underwent transformations and restorations. At the end of the 19th century it was sacked during

The Binasco Castle is located in the centre of Binasco and together with the main church and with the porches of Via Matteotti, it represents the beating heart of the social, cultural and political life.

POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN�


Situation before and after. Via Dante Alighieri

uation before and after. Via Dante Alighieri

Situation before and after. Via G. Matteotti Situation before and after. Via Dante Alighieri POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

ARCHITECTURAL PRESERVATION STUD

Before and after Space infront of the castle. Adding some instalations making the space next to the castle intrance more friendly for kids and more sociable for people.

Situation before and after. Via G. Matteotti POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

Before and after Space in the western part of the castle. Adding pavement and dog park to make the place more alive, by people of different age using it. POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

ARCHITECTURAL PRESERVATION STUDIO - GROUP A

ARCHITECTURAL PRESERVATION STU


Floor

The new site plan of the castle and its surrounding showing all landscape interventions - the change of the pavement, adding Plan some socializing areas and kids area among the instullation infront of the main intance of the castle, and making the northern, eastern and southern areas of the castle more private by controling the car circulation and making it just for service and for the people living their.

Before and after Showing the street facades and the Castle before and after

First Floor Plan


step, the end of the first part of the stick is made by a male-female bolt joint (D) the first and only rigid phase of the whole stick that instead will be free to move according to heat extension through the whole stairacse thanks to the multiple stiff element that are just keeping the sticks close to the steps but not strictly ancoring them (E). The Sticks, due to economic and conctruction reason are assembled in the working site through a male-female passing joint (F). Ending free at the end (G) without any kind of constraints.

oor plan

e floor plan

Stair case details POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

Adding the staircase to make all floors of the castle reachable for all users.

POLITECNICO DI MILANO - SCUOLA DI ARCHITETTURA URBANISTICA INGEGNERIA DELLE COSTRUZIONI - MSC PROGRAM “ARCHITECTURE AND URBAN DESIGN”

ARCHITECTURAL P


Profile for Maya Ghannoum

Portfolio 2019  

Maya Ghannoum_Architectural Portfolio 2019

Portfolio 2019  

Maya Ghannoum_Architectural Portfolio 2019