STREET AND UTILITY  RECONSTRUCTION PLAN  Village of Allouez  October 19, 2010


Street and Utility Reconstruction Plan  • Need for Street and Utility Reconstruction • Reconstruction Plan  • Financial Plan 


Need for Reconstruction  • Many streets in poor condition • Old cast iron water mains in poor condition • Sanitary sewer replacement needed 


Street Reconstruction Wisconsin DOT requires rating streets  with the Paser Rating System Allouez Paser Rating shown on map  Streets rated 3 or less (red) are  immediate replacement streets  Examples include: Mission Road  Green Avenue  Catharine St


Water Main  Replacement  Older cast iron water mains are  deteriorating (installed 1925‐1960) Map shows the cast iron water mains Water main leak repairs are shown  Cast iron mains experiencing many  breaks are the priority replacements Examples include:  South Webster Ave West Briar Lane 


Sewer Replacement  Sanitary Sewer System televised in  2001‐2002 Recommendations made for sewers to  replace in 1‐2 years and within 5 years High priority sewer replacement  included in plan for reconstruction  Examples include: West Briar Lane  Mission Road 


Reconstruction Plan  Highest Priority Replacements  incorporated into the plan  Prioritized the replacements into three  project phases Phase 1 is 2011 – 2013  $5M cost 


Phase 1 Plan  • Project 1 is Webster and West Briar water  main replacement (2011) • Project 2 is Greene and Mission (2011 after  Bellin Run) • Project 3 is Quincy/Catherine area (2012)


Phase 1 Funding  • Construction cost estimate is $4.9 M • Financial Analysis by Ehlers  • Debt service is estimated at $25 per year for  average home • Water and sewer costs included in utility rates • Storm Utility rate being evaluated due to  Heritage Hill project   


Summary  • Authorize proceeding with the Phase 1  reconstruction plan  • Approve utility rates during 2011 budget  process  • Proceed with design and bidding projects  • Complete bond issue by March 2011  • Complete construction in 2013  