Page 1

Ga il M. Cav a n a gh AIA, Leed AP, NCARB, NCIDQ

A r c h i t ectura l P o r t f olio


MZECH 6th October City, Cairo, Egypt

Senior Project Architect for 40 West, 6th October City. A 6-building, 119 Unit, Multi-Family, high-end residential compound in a suburb of downtown Cairo. Project Architect with responsibility for extensive client, contractor and consultant interface. Supervision respo nsibilities for office staff of fifteen. Construction, Progress as of June, 2012

Spa

Terrace to Living Room

Page 2


In dependent Arch i t ect Foertsch Renovation

Canaryville, Chicago, IL. Using REVIT, gutrenovation to existing 4-unit residential building. Revision of all unit layouts, sustainable replacement of kitchen and bath fixtures and exterior facade.

North Elevation

Aeriel Perspective South Elevation

SUB FASCIA EXIST. BSMT. SLAB -6'-10"

EXISTING SLAB

0'-8"

SLAB DEPRESSION -7'-11"

NEW 4" THICK SLAB, UPTURNED TO MEET EXISTING SLAB VAPOR BARRIER STONE DRAINAGE COURSE

INTERIOR CEILING ASSEMBLY 1 LAYER GYP. BD. ON METAL STUDS FOR INTERIOR CEILING, TYP. CEILING TO BE RATED 1 HR. AT FIRST, SECOND AND BASEMENT FLOORS. PROVIDE ACOUSTICAL INSULATION, AS REQ'D.

A2

7

ROOF ASSEMBLY METAL ROOF CAP, TURNED UNDER SIDING FLASHING AS REQ'D. ICE & WATER SHIELD 3/8" ORIENTED STRAND BOARD, R30 INSULATION

THIRD FLOOR 21'-0" LEDGER STRIP, THRUBOLTED TO STRUCTURE JOIST HANGER ANGLE

2X4 FRAMING

1 LAYER 5/8" GYP.BD FOR 1 HR. RATED WALL CONSTRUCTION

Detail - New Basement Slab 3/4" = 1'-0"

4

2X6 FRAMING NEW WINDOW, SEE SCHEDULE FOR SIZE. TYPE BY OWNER

Detail - Porch Roof @ Building 1" = 1'-0"

SECOND FLOOR 11'-0" ROOF ASSEMBLY: ASPHALT SHINGLES ICE & WATER BARRIER 3/8" EXTERIOR SHEATHING 12" WOOD RAFTERS, R30 INSULATION

WINDOW ASSEMBLY: FOLLOW WINDOW MANUFACTURERS DIRECTIONS FOR AIR AND WATER TIGHT INSTALLATION, TYP. ALL WINDOWS

EXISTING STRUCTURE AND WINDOW HEADER TO REMAIN, PROVIDE NEW R19 INSULATION

Detail - Window/Roof Assembly 3/4" = 1'-0"

FOLLOW WINDOW MANUFACTURERS INSTRUCTION FOR PROPER AIR AND WATER RESISTANT INSTALLATION

HinsdaleEngineering 514S.Grant Hinsdale,IL60521 630.323.7757

3/8" ORIENTED STRAND BOARD THIRD FLOOR 21'-0" 1X3" TRIM AROUND WINDOWS

METAL GUTTER CLERESTORY WINDOW, SEE SCHEDULE FOR DETAILS

2x12" WOOD RAFTER HARDIBOARD SIDING W/1" "H" BATTEN

2-2x12" WOOD TIMBERS, THRU BOLTED METAL CONNECTION ANGLES

EXTERIOR WALL ASSEMBLY

6

www.axiszarch.com

SunnysideDesignGroup,Inc. 909RidgewayCourt Schaumburg,IL60194 847.884.9870

ASPHALT SHINGLES ICE & WATER SHIELD

P1 INSULATION EXTENDED INTO EAVES, TYP.

R19 INSULATION AT EXTERIOR WALLS

8

EXISTING STRUCTURE SHOWN HATCHED

PORCH ROOF ASSEMBLY 12" WOOD RAFTER, 2 LAYERS 1/2" SHEATHING, ICE & WATER SHEILD, ASPHALT SHINGLES

9'-7 1/2"

EXTERIOR WALL ASSEMBLY 1/2" EXTERIOR SHEATHING OVER EXISTING 6" STUDS, VAPOR BARRIER, SIDING OR HARDIBOARD PANELS, AS SHOWN ON ELEVATIONS

THIRD FLOOR 21'-0"

2x6" ADDITIONAL SUPPORT FRAMING

WATERPROOF BACKER ROD & SEALANT @ JOINT, TYP.

ROOF 30'-10"

Front Perspective

EXTERIOR SIDING, VAPOR BARRIER & 1/2" EXTERIOR SHEATHING. VAPOR BARRIER AND ICE & WATER SHIELD TO OVERLAP

NEW WALL ALONG STAIR

1 X 5" FASCIA BOARD SOFFIT ROOF ASSEMBLY: ASPHALT SHINGLES ICE & WATER BARRIER 1/2" EXTERIOR SHEATHING EXISTING 4" ROOF JOISTS R30 INSULATION

A2

R19 INSULATED GYP. BD. PARTITION

1X5 TRIM AROUND POSTS, TYP. 6" STRUCTURAL POST

Detail - New Entry Roof 3/4" = 1'-0"

A2

3

SECOND FLOOR 11'-0"

Detail - Porch Roof 1" = 1'-0"

EXISTING STAIRCASE TO REMAIN IN PLACE R19 INSULATION

No.

2X12" WOOD SUPPORT FRAME

FIRST FLOOR 0'-0"

Description

Date

R30 INSULATION BELOW FLOOR SHEATHTING 2 LAYERS 1/2" SHEATHING W/VAPOR BARRIER BETWEEN SHEETS, TIGHT TO BOTTOM OF FLOOR DECK

FIRST FLOOR 0'-0"

NEW CEILING TIGHT TO STRUCTURE, 2 LAYERS GYP.BD.

9'-2"

6" STRUCTURAL POST EXIST. CONC. PAD AT EXTERIOR STREET GRADE -4'-4"

3'-6"

2'-0"

R19 INSULATED GYP. BD. PARTITION

Foertsch Renovation

12" SONOTUBE CONCRETE COLUMN

71547thPlace,Chicago

Details

1'-4"

EXIST. BSMT. SLAB -6'-10"

SLAB DEPRESSION -7'-11"

1'-0"

1x5 WOOD SLATS FOR FLOORING OVER FRAME 2x4" STUD FRAMING FOR INFILL AT BOTTOM OF EXISTING STAIR OVER NEW SLAB DEPRESSION

CONCRETE FOOTING ProjectNumber

2

Detail - Concrete Footing @ Porch 1/2" = 1'-0"

SLAB DEPRESSION. PROVIDE WATERPROOF SEALANT & BACKER ROD AT ALL JOINTS. PROVIDE 4" STONE BASE AND 6 MIL WATERPROOF MEMBRANE/VAPOR BARRIER.

Building Section

5

Detail - Entry Foundation & New Slab Depression 3/4" = 1'-0"

0102

Date DrawnBy

GMC GMC

CheckedBy

1

Detail - Front Bay Section 1" = 1'-0"

AǦ400 Scale

Asindicated

6/15/20125:09:58AM

STREET GRADE -4'-4"

4X4 PORCH POST, SET IN SONOTUBE FOOTING. CONCRETE 6" ABOVE GROUND LEVEL. EXIST. FOUNDATION WALL & FOOTING

0'-6"

0'-6"

0'-8"

Detail Sheet

Page 3


In dependent Arch i t ect Chic ago, Illinois

A

X1

XC

B

XD

XE

XF

C

D

E

F

G

1

2

J’Renee Career Facilitation Facility, Elgin, IL. Renovation and addition to existing corporate park structure. Adaptive reuse project from a restaurant to a school for LPN level nursing skills.

3

X2

4 5 6

7 X3 8 X4 9 10 11

X5

12 13

X6

J'Renee Career Facilitation, Inc. 415 Airport Road Elgin, Illinois

X7

X8

14

15

DUMPSTER AREA

X9

16

FLOOR PLAN

A-100

Construction Document Floor Plan

3

SKYLIGHT @ ENTRY LOBBY 1 1/2"=1'-0"

J'Renee Career Facilitation, Inc. 415 Airport Road Elgin, Illinois

J’Renee Persp ectives

DETAILS

VENEER BASE @ WINDOW SILL 1 1/2"=1'-0"

2

PARAPET @ NEW ADDITION 1 1/2"=1'-0"

1

BLDG. ENCLOSURE @ STONE VENEER 1 1/2"=1'-0"

A-411

Construction Document Detail Sheet

Page 4


In dependent Arch i t ect Ka|Se Study - ECO Homes Competition

In 2007, Greensburg, KS was hit by a tornado which devastated the entire town. While no structure can be designed to completely withstand a tornado, Ka|Se Study was designed to greatly reduce t he amount o f damage and capitalize on the opportunity to design in a sustainable manner. This compact, three bedroom home utilizes simple materials and a common sense approach and passive sustainable technologies to outperform traditional residential buildings both structural ly and in overall energy consumption. This design project was a competition submittal in May, 2009.

Page 5


GREC St u di o Chic ago, Illinois

Senior Project Architect for the Abu Dhabi Golf Academy and Hotel, Abu Dhabi, UAE. Contract Position, h ired for Coordination of consultant drawings (Interior Designer, HVAC, Structural, Kitchen Consultant, etc.) and produce contract documents for 5-star hotel. Direct supervision responsibities for production staff of twelve. Facade from 18th Hole

Lobby Waiting Area

Main Lobby

Guest Room

Restaurant

Site with Golf Course

Page 6


Solomo n Co rdw ell Bu en z Chicago, Illinois

Senior Project Architect for Mandarin Oriental Hotel (Unbuilt), a 5-Star Hotel with Private and Hotel Residences. Extensive coordination with Mandarin hotel representatives throughout the United States and Hong Kong. Extensive coordination with US and overseas consultants including ABA (Las Vegas), Magnusson Klemencic Associates (Seattle), JB&B (New York) and Deckelmann Wellness (Germany/Hong Kong).

Library Tower Lobby

Library Tower, Chicago, Illinois. Redesign CD package at roof, entry lobby and retail area. Lewis Tower, Loyola University, Chicago, Illinois. Project Architect/Designer for tenant fit out and renovation of the 16th and 17th floors. Coordinated consultants and scheduled project. 20-24 Chicago Avenue, Loyola University, contract documents for retail & classroom addition.

20-24 Chicago Avenue, Loyola University

Page 7


Shepley B u l fi n ch Boston, Massachusetts

Senior Job Captain on Children’s Hospital and Health System, Wauwatosa, WI. 450,000 sq. ft. new hospital wing. Contract documents and design of med/ surg and ICU rooms.

Children’s Hospital Exterior

Children’s Med/Surg

Children’s Hospital ICU Floor

Page 8


Shepley B u l fi n ch Boston, Massachusetts

Smilow Cancer Hospital at Yale-New Haven, Connecticut is a 500,000 sq. ft. new hospital wing. Job captain responsibilities include oordination of architectural and interior teams in contract document phase. Also, coordination with consultants and client.

Main Entry w/Mast

MRI Room

Main Entry Interior Exterior Elevation

Entry Mast Contract Document Details

Page 9


Shepley B u l fi n ch Boston, Massachusetts

Job captain on Lahey Clinic, Burlington, Massachusetts. Involved with programming, schematic design, design development, construction documents, specifications and engineering coordination for 250,000 sq. ft. addition including two 10,000 sq. ft. med/surg floors.

Med/Surg Suite

Main Entry Interior

Main Entry

Nurse Station and Corridor

Med/Surg View to Nurse Station

Page 10


Elk us-Ma nfredi , LLC Boston, Massachusetts

Job Captain on 500 Atlantic Street Hotel, Boston, MA. Design development and contract documents for 200,000 s.f. 5-star hotel. Job Captain for Residences at the Colonnade, Boston, MA. Contract documents and contract administration for 80,000 s.f. hotel residence tower.

Colonnade Hotel Exterior

500 Atlantic Street Hotel

Colonnade Penthouse Floor Apartments - Floor Plans

Page 11


Pe r ry De a n R oge rs & Part ners Boston, Massachusetts

Job Captain for the Brookline Public Library Renovati on and Addition. Original building constructed in 1909, Brookline, MA. Involved in design and contract documentation, including client, structural and MEP coordination.

BPL New Interior Staircase

BPL New Children’s Library

BPL Old/New Exterior Transitions

Page 12


Th e SLAM Co lla bor a t i v e Glastonbury, Connecticut

Lego Corporate Cafeteria, Principal client contact and senior interior designer. New Britain Courthouse, Principal interior designer of entire courthouse building.

Lego Exterior - Before and After

New Britain Courthouse

Lego Dining Hall - Be fore & After

NBC Lobby Second Floor

Marche Serving Area Page 13


Th e SLAM Co lla bor a t i v e Glastonbury, Connecticut

University Of Connecticut Dorms and Dining Halls, Senior interior designer Housatonic Community College, Principal interior designer of library and science labs.

Housatonic Community College Main Entry University of CT Marche Serving Area

HCC Chemistry and Biology Labs

Page 14


Ga il M. Cav a n a gh AIA, Leed AP, NCARB, NCIDQ

Education Boston Architectural College, Boston, Massachusetts Bachelor of Architecture, October 2003, NCARB Certification, 2009 Paier College of Art, Hamden, Connecticut Associate Degree Interior Design, May 1980, NCIDQ Certification, 1990. Computer Skills CAD Programs: Autocad, 2011, Microstation, Revit 2010 Rendering Programs: InDesign, Illustrator, Photoshop, Sketch-Up Microsoft Programs: Outlook, Word, Excel, MS Project Black Spectacles.com,online CAD software tutoring site, 2012 Revit Online Training Program Participant, 2010,2012 Affiliations/Competitions/Volunteering Volunteer for Obama for America Re-election Campaign - GOTV, Chicago Women in Architecture - 2nd Vice President, Fiscal Year May 2012, Corporate Sponsorship Chair Organizer/Leader of discussion Panel, October 24, 2012, “Practicing Overseas: Women, Culture & Architecture” Editor of Chicago Women in Architecture Newsletter, 2008 - 2010 Chain of Eco Homes Competition - 2009 Entrant for Sustainable H ousing Competition United States Green Building Council, Chicago Chapter Member – 2009, 2012 Licensing and Accreditations Licensed in Commonwealth of Massachusetts, January 2009 Licensed in State of Illinois, August 2010 LEED AP Accredited, May 2010 Additional Skills Code analysis, Specifications, Submittals, Budgeting, Scheduling, AIA Contracts Page 15

Cavanaghportfolio  
Read more
Read more
Similar to
Popular now
Just for you