Page 6

KRONPLATZ

NEW CONTROL SYSTEM WITH 116 KM OF SLOPES AND 32 STATE-OF-THE-ART LIFT SYSTEMS, THE SKI RESORT OF KRONPLATZ IS ONE OF THE TOP WINTER SPORTS DESTINATIONS IN THE NORTH OF ITALY. KRONPLATZ HAS BEEN A TECHNOALPIN CUSTOMER FOR YEARS. THE SKI RESORT HAS A NUMBER OF TECHNOALPIN SNOW GUNS WHICH HAD PREVIOUSLY BEEN LINKED INTO THE CUSTOMER‘S OWN CONTROL SYSTEM. Work began in the summer of 2015

and together, in September – and it all

TechnoAlpin data-control system. The

to integrate the whole system into the

went off without a hitch.

brief was also to extend the snow-mak-

ATASSplus data-control system. This in-

In addition, the existing company-owned

ing system therefore 9x TF10 were sup-

volved changing the control units in 13

control units in 28x M20, 19x M18 and

plied and integrated in the ATASS-plus

existing pumping stations and reprogram-

7 lances were replaced with an original

control system.

ming the existing control units in two oth-

TechnoAlpin control unit. The existing

The extension comprises the full da-

ers in order to link them into the ATASSplus

Siemens control unit was reprogrammed

ta-control package, including water

system. The challenge was then to put all

on 25x M90. All these snow guns could

management, energy limitation, update

15 pumping stations into operation in time

then be successfully linked into the

contracts and wind-tracking function.

06

Profile for TechnoAlpin AG

SnowExperts Magazine 01/2016 EN  

SnowExperts Magazine 01/2016 EN