Distribution of Revenue Sharing Supply of Turbot to onshore plant for further processing – From 2001 – 2007 supplied with 1418t (1,985t of harvest weight) from BFCs 0A turbot allocations. Also supplied 316t of CSFL 0A and 0B allocations – As a result plant was able to lengthen its production season substantially, and provide more employment at the plant – Over this period turbot supplied to the plant cost BFC more than $3.9 million directly., plus cost to the harvesters of another $4.8 million.