Page 17

Phase 4

Structural Assessment EXPOSED TO

FEEDBACK

ADJUSTMENTS

Jon Anderson

• Assessing structural members individually removes the need for over engineering. • Complex projects will become viable when architects can state confidently how much more than a standard approach geometrically complex solutions will cost. • Massive time savings are possible by using visualization models for structural evaluation.

• Structural members were bunched to minimize ribbon deflection. • Steel profiles were assigned to structural elements.

HIVE Engineering

Local Optioneering Slideshow  

Illustrates how the hypothetical project, Ripple was developed through a series of stakeholder consultations.

Read more
Read more
Similar to
Popular now
Just for you