Issuu on Google+

Phase 4

Structural Assessment EXPOSED TO



Jon Anderson

• Assessing structural members individually removes the need for over engineering. • Complex projects will become viable when architects can state confidently how much more than a standard approach geometrically complex solutions will cost. • Massive time savings are possible by using visualization models for structural evaluation.

• Structural members were bunched to minimize ribbon deflection. • Steel profiles were assigned to structural elements.

HIVE Engineering

Local Optioneering Slideshow