Realizing Open Interoperability Owner (Dow Chemical) Perspective

2009 CURT National Conference Surviving and Thriving In Today’s Construction Industry Jerry N. Gipson, Jr. Director, Engineering Solutions Technology Center The Dow Chemical Company


The Storm Is Here Are We Prepared?  Design Basis  Process Definition Competency Execution

November 2009

Copyright © 2009 The Dow Chemical Company


Sustainability – Our Shared Vision

Perform Design, Build, Operate, and Maintain all contribute to achieving sustainable results.

Elevate

Collaborate

The extended enterprise and complete life-cycle duration are ‘in scope’

Key stakeholders working through strategic relationships will deliver the optimal solution

Innovate New technologies and ways of working together enable sustainable life-cycle solutions. November 2009

Copyright © 2009 The Dow Chemical Company


Asset Life-Cycle – Driving The Aggregate

Competitive Technology: • Relative Performance • Cost • Reliability

Projected Project Performance: • Cost, Schedule, Operability • Risk/Reward, NPV Final Project Performance: • Safety/EH&S • Cost, Schedule, Operability, IRR

Project Initiation Project Development

Start-Up

Design / Build

Technology Acquisition Project Performance: • Safety • Compliance to Plan

Operate / Maintain / Improve Operational Performance: • Safety/EH&S • Reliability/Asset Utilization • Meet Quality/Capacity Commits • Value Delivery

Business and Design Intent Information Management November 2009

Copyright © 2009 The Dow Chemical Company


Macro Enterprise Information Flows Document & Business Process Oriented

Services HR

Procurement Admin

EPC’s

eMarket Non-Strategic Indirect

MRO & Supplies

Surplus Equipment

Freight

External Enterprise Integration Layer Fire Wall

Fire Wall Transaction Focused

Enterprise Core Applications

Enterprise Portal

Configured by work process

Domain Integration

Domain Integration

Application

Application Application

Build

Domain Integration

Configured by Business or Plant Application

Data Focused

Application

Maintain

XML Application Domain Integration

MOS Application Data Focused

November 2009

Configured by Site or Plant

XML

XML

Configured by Plant

XML Application

Process Control

Copyright Š 2009 The Dow Chemical Company

Data Focused


Evolving Engineering Collaboration Model

Internal:

P&ID’s Others …

Equipment Data Sheets

Engineering Data/Workflow (integration) Instrument 3D Design Design

2D Design

Electrical Design

Secure Standard Interfaces November 2009

Copyright © 2009 The Dow Chemical Company

Engineering Operations Maintenance Purchasing

(collaboration) External:

EPC Leveraged Production Center Service Provider Supplier


Innovate to Succeed

November 2009

Copyright Š 2009 The Dow Chemical Company


The Storm Is Passing (for now) What is the aftermath? Where were the flaws? What is the path to recovery? Asset Life-Cycle Management is a balance  Perform  Elevate  Innovate  Collaborate November 2009

Copyright © 2009 The Dow Chemical Company