1. Which statement is true about the HP Insight Dynamics-VSE 5-star rating system? A. Physical servers with high workloads are qualified for workload stacking. B. Physical servers with low headroom ratings are automatically converted to virtual machines. C. Servers can be provisioned and redeployed based on best-fit algorithms. D. Servers with higher ratings use more server resources than servers with lower ratings. Answer: C

2. Which HP Systems Insight Manager pull-down menu do you use to add licenses to the environment? A. Deploy B. Configure C. Options D. Tools Answer: A

3. In addition to a server deployment platform, what are other requirements for physical provisioning using Insight Dynamics infrastructure orchestration functionality? (Select two.) A. availability start and stop dates in the IO calendar B. operating system templates C. VC Domain groups on VCEM D. SAN-backed storage created E. Failsafe setting enabled on primary group Answer: CD

4. Which HP Insight product is included with most G6 and later ProLiant servers? A. Insight Dynamics B. Insight Control

Exam1pass Help You Pass Any IT Exam

http://www.exam1pass.com


Exam1pass

Easiest way to pass IT exams

C. Insight Foundation D. Insight Control for Linux Answer: C

5. Which interconnects come bundled with the BladeSystem Matrix Starter Kit? (Select two.) A. a single VC Flex-10 ethernet module B. a redundant pair of VC Flex-10 ethernet modules C. a single VC 8GB 24-Port FC module D. a redundant pair of VC 8GB 24-Port FC modules E. a single VC 4GB 24-Port FC module F. a redundant pair of VC 4GB 24-Port FC modules Answer: BD

6. What costs are represented in the Cost window in Insight Orchestration Designer? (Select three.) A. IP addresses B. administrative overhead C. storage D. servers E. applications F. power Answer: ACD

7. How many c-Class blade enclosures are manageable when running HP Virtual Connect Enterprise Manager 2.0 or later? A. 250 B. 1000 C. 2000 D. 4096

Exam1pass Help You Pass Any IT Exam

http://www.exam1pass.com


Exam1pass

Easiest way to pass IT exams

Answer: B

8. What does the customer gain by using Virtual Connect Flex-10 in combination with G6 blades? A. N_Port ID Virtualization functionality B. eight FlexNIC connections of 10Gb/s each C. four FlexNIC sharing each 10Gb connection D. server network and storage connection migration across enclosures Answer: C