Page 1


ME DI C A LF A C I L I T I E S

H E A L T HC E N T E RL O SC R I S T I A N O S H E A L T HC E N T E RJ E R E ZS O U T HS E C T O R S E N I O RC I T I Z E N SS A N I T A R YC A R EC E N T E R A B UD H A B I C H I N E S EME D I C A LC L I N I C H E A L T HC E N T E RL A N Z A R O T E N I E F A N GD I S T R I C TH O S P I T A LR E H A B I L I T A T I O N


RAILWAYS DEPARTAMENT HIGH SPEED TITLE: PLATFORM FOR THE HIGH SPEED ROUTE ANTEQUERA - GRANADA. SECTION: PINOS PUENTE - GRANADA.

GENERAL INFORMATION: CLIENT: INFRAESTRUCTURAS FERROVIARIAS PROJECT START DATE:

JULY 2009 DURATION OF PROJECT:

12 MONTHS PROVINCE:

GRANADA VALUE OF SERVICES:

DESCRIPTION OF PROJECT: - CONSTRUCTION PROJECT OF A HIGH SPEED PLATFORM FIT FOR DOUBLE TRACK, IN A SECTION OF 12.06 KM ON THE PASSAGE OF THE HIGH SPEED ROUTE ANTEQUERA - GRANADA, UNDER THE MUNICIPAL TERMS OF PINOS PUENTE, ATARFE AND GRANADA. - INCLUDES THREE ALTERNATIVES TO THE CURRENT SINGLE TRACK ROUTE BOBADILLA - GRANADA.

MAIN CHARACTERISTICS: -DOUBLE TRACK, UIC (HIGH SPEED ROUTE) WIDE -SINGLE TRACK, IBERIAN (CURRENT ALTERNATIVE ROUTE) WIDE

-LENGTHS: 1,52 KM (HIGHWAYS), 12,04 KM (INTERSECTIONS) AND 2,53 KM (SERVICE ROADS) -WORK LENGTH: 32 MONTHS


RAILWAYS DEPARTAMENT METROPOLITAN TRAM TITLE: CONSTRUCTION PROJECT OF SEVILLE'S SUBWAY, ROUTE 2: TORRETRIANA TORREBLANCA (IN UTE)

GENERAL INFORMATION: CLIENT:

PROJECT START DATE

IN PROGRESS DURATION OF PROJECT:

24 MONTHS PROVINCE:

SEVILLA VALUE OF SERVICES:

TUNNEL SECTION

DESCRIPTION OF PROJECT: BUILDING PROJECT OF THE METRO LINE 2 OF SEVILLE, BETWEEN TORRETRIANA (ISLA DE LA CARTUJA) AND TORREBLANCA, WITH POSSIBLE EXTENSION FOR CONNECTING TO THE DOUBLE LINE. EXCHANGE WAY WITH 3 AND 4.

PROJECT LENGTH: 12,8 KM -3,8 km double track tunnelling. -2 km screens. -7 km surface. -17 stations: 7 subterranean y 10 on the surface.


ESESE Architects 2  

ESESE Architects 2