Issuu on Google+


CHELSEA 1500 BC

STAINES 1400 AD

TEDDINGTON current (lock)


AD 1

AD 100

125

AD 60

150

NATURAL RIVERBANK

270

270

1000

1150

AD 120

1250

1350

1400

RIVERSIDE WALL

AD 1

AD 60

AD 60 AD 60

AD 120 AD 120

AD 60

AD 120

1450

1980 THAMES


AD 1

AD 100 NATURAL RIVERBANK

125

AD 60

150

270

270

RIVERSIDE WALL

1000

1150

AD 120

1250

1350

1400

1450

1980 THAMES


LONDON DOCKS 1799-1815

LONDON DOCKS 1799-1815

WEST INDIA DOCKS 1802

WEST INDIA DOCKS 1802


REGENT’S CANAL DOCK 1820

ST KATHARINE DOCK 1828

SURREY DOCKS 1802-1820

REGENT’S CANAL DOCK 1820

ST KATHARINE DOCK 1828

SURREY DOCKS 1802-1820


OCK

VICTORIA DOCK 1855

VICTORIA DOCK 1855


ROYAL ALBERT DOCK 1880 ROYAL ALBERT DOCK 1880

KING GEORGE V DOCK 1921 SOUTH INDIA DOCK & MILWALL 1860-1868

KING GEORGE V DOCK 1921

ROYAL ALBERT DOCK 1880

KING GEORGE V DOCK 1921 SOUTH INDIA DOCK & MILWALL 1860-1868


ROYAL ALBERT DOCK 1880

KING GEORGE V DOCK 1921 SOUTH INDIA DOCK & MILWALL 1860-1868


0

1983

2010

2010

2009

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

1998

1997

1994

1995

1996

2008

1993

2007

2009

1991

1992

2005

1990

2006

1989

2003

2004

1988

1987

2001

2002

1985

1986

2000

1984

2

1998

1997

0

1999

20

15

10

5


0

1983

2010

2010

2009

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

1998

1997

1994

1995

1996

2008

1993

2007

2009

1991

1992

2005

1990

2003

2006

1988

1989

2002

1987

2001

2004

1985

1986

2000

1984

2

1998

1997

0

1999

20

15

10

5


NORTH

SOUTH m 150

100

50 THAMES 0

-50

-100 ORIGINAL WATER LEVEL WATER LEVEL IN AQUIFER 2007 WATER LEVEL IN AQUIFER 1965 LIMIT

NORTH

SOUTH m 150

m -20 -30

100

CLAY

50

CLAYS & SANDS

-40 -50

THAMES 0

BASAL SANDS

-60 -70

-50 -80 -100

1900

ORIGINAL WATER LEVEL WATER LEVEL IN AQUIFER 2007 WATER LEVEL IN AQUIFER 1965 LIMIT

m -20 -30

CLAY

-40 CLAYS & SANDS

-50

BASAL SANDS

-60 -70 -80

CHALK 1900

-90 1910

1920

1930

1940

CHALK

1950

1960

1970

1980

1990

2000

2010

-90 1910

1920

1930

1940

1950

1960

1970

1980

1990

2000

2010


RICHMOND LOCK -0.6 m / +5.4 m RICHMOND LOCK -0.6 m / +5.4 m TEDDINGTON +/- 2 hrs at high tide TEDDINGTON +/- 2 hrs at high tide

LONDON BRIDGE +0.3 m / +7.4 m LONDON BRIDGE CHELSEA BRIDGE +0.3 m / +7.4 m -0.4 m / +6.9 m CHELSEA BRIDGE -0.4 m / +6.9 m

CORYTON +0.3 m / +6.6 m CORYTON +0.3 m / +6.6 m

NORTH WOOLWICH +0.2 m / +7.5 m NORTH WOOLWICH +0.2 m / +7.5 m TILBURY +0.2 m / +6.9 m TILBURY +0.2 m / +6.9 m


OLYMPICS & LEGACY

CENTRAL LONDON

ROYAL DOCKS CANARY WHARF O2 ARENA


JOBS

HOMES


300 50k

600 10k

20k

900

15k

40k

20k 60k

1200 25k

80k

30k 100k

1500 35k 120k

1446 ha 32.000 50.000

AREA HOMES EMPLOYMENT

300 50k 20k

600 10k 40k

900

15k

20k 60k

AREA HOMES EMPLOYMENT 300 50k 20k

600 10k 40k

900

15k

20k 60k

AREA HOMES EMPLOYMENT

1200 25k

80k

30k 100k

363 ha 10.000 110.000

1500 35k 120k

1200 25k

80k

30k 100k

636 ha 14.000 5.500

1500 35k 120k


PER HECTARE ISLE OF DOGS 303 JOBS 27,5 HOMES

300 50k

600 10k

20k

900

15k

40k

20k 60k

1200 25k

80k

LOWER LEA 34,6 JOBS 22,1 HOMES

1500

30k

35k

100k

120k

ROYAL DOCKS 8,6 JOBS 22,0 HOMES

1446 ha 32.000 50.000

AREA HOMES EMPLOYMENT

300 50k 20k

600 10k 40k

900

15k

20k 60k

AREA HOMES EMPLOYMENT 300 50k 20k

600 10k 40k

900

15k

20k 60k

AREA HOMES EMPLOYMENT

1200 25k

80k

1500

30k

35k

100k

120k

363 ha 10.000 110.000

1200 25k

80k

1500

30k

35k

100k

120k

636 ha 14.000 5.500


2010

Levee

2020

Ownership

2030

Secondary levees

Primary levee West Primary levee East

Clear sites

Built

2

Wharfs

Fluvial plain West blocks, pier & levee

Inner-levee horizontal skyscrapers

Fluvial Plain East blocks, pier & levee

Silvertown Quays

West Silvertown Commercial centre

Infrastructure

Rail & Tunnel DLR West

West Silvertown DLR Station

Rail & tunnel DLR East

Resources

Barrier

Water & Solar Station roof

Need for upgrade Thames Barrier


2040

2050

2060

2070

apers

Bridge Thames Barrier

Tidal Power Thames Barrier Hydropower Generators Thames Hub Barrier

Hydropower Turbines Thames Hub

Project development Thames Hub - Barrier / Infrastructure / Airport

Insufficient Thames Barrier


Commercial Space

6150 m²

Tesco Express 300 m² Shop / Counter / Staff / Stock Boots 800 m² Shop / Counter / Staff / Stock

Station

2210 m²

Passenger Concourse Check-in / Traffic

550 m²

Platform Arrival / Departure

1400 m²

Square Sainsbury’s 2000 m² Shop / Counter / Staff / Stock

Corridor

Staff

Restaurant 1600 m² Dining / Bar / Kitchen / Restrooms / Stock / Staff

Bar & Café 1000 m² Bar & Seating / Counter / Restrooms / Small kitchen / Stock / Staff

Florist

100 m²

Post Office

100 m²

Hair Salon

150 m²

Kiosk

100 m²

Other

25200 m²

Dispatch Supply / Storage

500 m²

Building Services HVAC / Energy / Water

200 m²

Parking

20000 m²

150 m²

Ticket Machines

30 m²

Passenger Services

40 m²

Public Toilets

40 m²


CITY

PUBLIC DOMAIN WATER TRIBUTARIES CONNECTIVITY


West Silve

Docklands Light Ra Plans & Sections Jochem Ermboud Hamoen Delta Interventions P5 - 31-01-2013

D

C’

B

A

D’ 0 1:500

AA’ 1:500


1. 2. 3. 4.

lvertown

ht Railway Station

s

Platform Concourse Tickets Staff

5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Restaurant Kitchen Cafe Florist Post office Salon Kiosk Boots Sainsbury’s Tesco Express

15. 16. 17.

Expedition Parking Building services

E

Platform Concourse Tickets Staff

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Restaurant Kitchen Cafe Florist Post office Salon Kiosk Boots Sainsbury’s Tesco Express

15. 16. 17.

Expedition Parking Building services

16. 5.

15.

12.

16. 15.

10.

15500

5.

34500

9. 6.

10300

8.

15.

C

16. 14.

13.

17.

15.

4.

C’

12000

11.

33200

15.

81000

12.

3.

13.

C’

C

B’

B

34500

16. 14. 7.

B’

B

A’

A

29500

2.

2.

E’

+1 1:500 7750

15200 45950

21450 36950

24450 8950

82569

13700

9000 104900

51800 252631

+15400 +13000 +12400

+1 1:500

+11000

+8000 +5600

BB’ 1:500


ervices

0

C’

7200 10800

C

C’

33200

81000

12600

11.

7200

10.

19500

33200

5.

20500

12.

9.

33200

8.

7100

E

B

B’

B

A

A’

A

1. 2. 3. 4.

29500

1.

16. +1 1:500

Platform Concourse Tickets Staff

5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Restaurant Kitchen Cafe Florist Post office Salon Kiosk Boots Sainsbury’s Tesco Express

15. 16. 17.

Expedition Parking Building services

E’

TOP

12.

1:50 5.

15. 15800

7450

17000

38037

36600

0 00 20

15.

+11000

16.

BB’ 1:500

14.

2.

CC’ 1:50

13.

C’

C

B’

B


C’

C

B West Silvertown Urban Plan 1:2000

B’

A

A’

124000

6000

32500

33200

81000

12600

19500

45500

33200

20500

E

81000

D 1

E’ TOP 1:500

E 1 146000

00 60 14

140000

124000

CC’ 1:500

DD’ 1:500

EE’ 1:500

EE’ alternative 1:500

E 1


Square’s roof

Railway tube

Floor slabs

Columns & beams

Floor slabs

Foundation

Structural Design


TOP Detail specification

1

Roof construction Growing medium 10 mm filter sheet 80 mm drainage layer Concrete curb Protection mat Root barrier Bituminous layer 50 mm top floor 260 mm hollow-core slab 20 mm bearing layer 320 mm precast concrete supporting beam 100 mm mineral wool thermal insulation 18 mm pine wood ceiling

2

Slab 200 mm in situ concrete facade 600 mm precast reinforced concrete slab 200 mm in situ concrete facade facade cast with formliners - vertical line surface profile

3

Slats 400 mm * 50 mm laminated pine 200 mm steel T-frame

2

1

3

4

4

Floor construction 20 mm troweled concrete floor 50 mm top floor sealing layer 80 mm mineral-fibre impact sound insulation 260 mm hollow-core slab 20 mm bearing layer 320 mm precast concrete supporting beam 100 mm wool thermal insulation 18 mm pine wood ceiling

5

Foundation 20 mm troweled concrete floor 50 mm top floor sealing layer 40 mm impact sound insulation 200 mm in situ concrete foundation

6

B 1:20

Concrete curb Raster Gravel

5

6


E

TOP Detail specification 9

7

10

11

7

Double glazing 8 mm toughened glass 12 mm cavity 2 * 8 mm laminated safety glass 80 mm steel I-beam

8

Levee wall 200 mm precast concrete wall bituminous undercoat 600 mm reinforced precast load-bearing concrete wall 10 mm cavity 100 mm foamed-glass insulation 100 mm in situ concrete wall

8

West Silvertown Docklands Light Railway Station

A

Details & Construction

B

C

Jochem Ermboud Hamoen Delta Interventions P5 - 31-01-2013

E

TOP Detail specification

A 1:20

1 2

Roof construction Growing medium 10 mm filter sheet 80 mm drainage layer

E 1:20


9 9

Roof construction 800 * 800 mm concrete paving slabs neoprene bearing layer Bituminous layer 40 mm mineral-fibre impact sound insulation Bituminous layer 260 mm hollow-core slab Installation cavity Plasterboard

10

Wall construction 200 mm in situ concrete facade facade cast with formliners - vertical line surface profile 600 mm load-bearing wall Installation cavity Raster

11

Ceiling light IPE180 steel I-beam 8 mm toughened glass in steel frame

10

11

E 1:20

C 1:20



West Silvertown