Page 1

P O R T F O L I O


2


VALLEY VILLA Realization 2017; 415 skvm; Studio “arches”; Photo credits N.Tukaj Vilnius, Lithuania


My responsabilities included working drawings preparation, process coordination. Also I took a part of interior design creation. I attended meetings and communicated technical/ architectural content on the site and in the office.


Single family house surrounded by natural environment. Very close to Vilnius city center in the regional parck territory. Strict architectural regulations. The old farmplace. Natural lanscape slope and old trees. Forest around the site. Landscape, nature, human. All this was the main things ispire Valley Villa. Natural materials were selected for the facades. Wood and the stone. Big windows let the forest come inside the building.


LINEA SHOWROOM Realization 2015; 660 skvm; Studio “arches” Photo credits L. Garbačiaukas Vilnius, Lithuania


Linea - an office and the showroom for exclusive quality and interior decoration materials. Location - the part of Vilnius old town, a historical district Žvėrynas. Strict architectural and urban protection requirements. The most preserved historical small scale homsteads of the city. Ceramic plates and individual rectangular ceramic elements are used for the facade.

Responsabilities - technical/working drawings preparation, process coordination and practical completion. I attended meetings and communicated technical/architectural content on the site and in the office.


MOVING CUBES Realization 2018; 156 skvm; Studio “arches”; photo credits N.Tukaj Vilnius, Lithuania


1


A compact house for family of two. Human scale, one floor. Hidden from the streat and open to the private courtyard. The bas-relief of the cooper facades interpret the pine tree’s trunk verticals visible through the windows. Those cooper clads come to the interior, connecting outside and inside spaces.

My responsabilities included technical/ working drawings preparation, process coordination. I took a part of interior design creation. Communication with the client and contruction workers. Practical completion.


AMBERTON GREEN SPA DRUSKININKAI 5* Project 2016; Realisation 2020; 5680 skvm.; Studio “arches” Druskininkai, Lithuania


Responsabilities - technical/working drawings preparation, process coordination and practical completion. I attended meetings and communicated technical/architectural content on the site and in the office.


Sleep Wellness SPA Hotel 5*. Hotel facilities: SPA zone, indoor pool with sauna, fitness area, restaurant, 79 rooms. Location - Druskininkai, SPA town in Lithuania. Territory belongs to the old town urban territory, also has strict regulations according heritage rules. The main aim of architectural expression was to design a modest and an environmentally friendly solution. Searching for architectural laconity and quality factor. The building is designed in two volumes, which are connected by the glass roof. Rooms are designed in the II block on the west side of the plot. The main entrance and reception, a 100-seat restaurant, an universal hall office space are planned on the eastern part of the plot (I block), on the ground floor. Swimming pool with sauna are designed in the south side of this building.

Wooden panels and titanium zinc clads are used for the facade. These materials are suitable for the resort environment. The vertical elements of the building balcony ceilings are wooden as well. Wood was chosen for the interior of the rooms and main spaces.


SIX RECREATIONAL BUILDING COMPLEX Realization 2014; 1282skvm; Studio “arches”

Palanga, Lithuania


1


Location - Palanga, resort of Lithuania. The site is in the cultural heritage territory in Palanga. The technical design solutions have been prepared taking into account the above mentioned cultural property dossier, approved by the Council decision. Six recreational buildings with 14 rooms, administrative premises, changing rooms, sanitary facilities are designed on the ground floor of the VI’th building. Most of the rooms are two floors and have direct access from the outside (I, II, III, IV, V blocks). All rooms are equipped with kitchen facilities. Some rooms have balconies. Wood and cooper clads are used for the facades as materials suitable for the resort environment.

Responsabilities - technical/working drawings preparation, process coordination and practical completion. I attended meetings and communicated technical/architectural content on the site and in the office.


RESIDENTIAL BUIDLINGS Project 2018; Realisation 2020; 1500 skvm.; Studio “arches” Vilnius, Lithuania

Responsabilities - process coordination, technical/working drawings preparation for getting building permission


Two functionally linked residences, 3-storey housing blocks and underground car parking area. Common areas: children playgrounds, recreation areas, community gardens (“urban farming�) are designed on the ground floor. Binary structure is used for the facade decoration: dark clinker bricks are used for exterior perimeter facades, light clinker for interior yard facades. Roof clay tile color is identical to the dark clinker facades.


MODERN AND CONTEMPORARY ART CENTER IN VILNIUS Competition 2017 5600 skvm

Third place


The area is close to the city center, in the Valley of the river Neris slope. Preserved trees. The idea was to connect existing pedestrian flows and to form a laconic volume at their intersection. Open areas were created on the upper and lower terraces. Concrete was chosen as the main material of the building facades.


RECREATIONAL BUILDING COMPLEX Proposal 2014; 2000skvm; Studio “arches”

Palanga, Lithuania


2


The site is in the strictest monument protection regime. The idea was to preserve all the pinetrees in the site. Buidings had to be two stores maximum. Wood, with small columns as the trees outside was chousen as the main material for the facade decoration.

Responsabilities: participated from the beggining till the end of the process; Possible buidings arrangement analyses on the site, Preparation of all graphic material.


BLUE SOLUTION OFFICE INTERIOR together with architect A.BrazauskaitÄ— Realization 2019 Kaunas, Lithuania

Responsabilities: participated from the beggining till the end of the process.


The main idea was to higliht different functions by colors. All windows come to the river side, so all spaces were created as much open as possible. Engineering equipment and concrete ceilings are unhidden. The main office space with a kitchen can be connected with the space next to itby transformable glass partition. Materials - concrete, carpet on the floor and walls, PVC.


E N R I K A G E S TA U TA I T E a r c h i t e c t e n r i k a i t e @ g m a i l . c o m + 3 7 0 6 9 9 9 5 7 9 8

Profile for Enrika Gestautaite

ARCHITECT PORTFOLIO  

ARCHITECT PORTFOLIO  

Advertisement