Construction Update March 2017

Page 51

March 2017

The treatment plant you choose should be around 95% efficient thus allowing long intervals before de-sludge is required. The waste water must be cleaned to a standard meeting the usual discharge level requirement, you must apply for either an exemption certificate or permit, before making a discharge we can assist with this and advise on the method of discharge, be it a ditch, stream, watercourse or soakaway. As the system breaks down and aerates the solids, the introduction of non-degradable items such as wipes, sanitary products etc. should be avoided at all times in any treatment plant, this will clog up the system and increase the

need to empty the unit, follow this instruction and typical emptying will be around 3-5 years, it is also recommended no medicines, or

harsh chemicals enter the unit, try to stick to Eco brands and stagger washing throughout the week.

A simple Schematic of a BioPure Treatment Plant A BioPure Treatment Plant

LEFT

ABOVE

The FlowPath Simple solution sewage system We Build it has developed its range of package sewage treatment plants utilising proven SAF (submerged aerated filter) technology for maximum performance and reliability, using the most reliable energy efficient aeration blowers with a prolonged integral FlowPath system to maximise effluent quality. All our Flowpath treatment plants are designed in accordance with the British Water Code of Practice for flows and loads, this range can be designed to meet your population and consent requirements, our standard range can accommodate up to 300 pe. This range of products can be designed for larger scale commercial applications such as camping sites, leisure facilities, schools, hotels, offices and industrial applications. Maintanance, Spares And Servicing The consumer needs easy to follow advice for their sewage treatment

needs especially when servicing their plant, maintaining any sewage treatment plant, is a very important part of ensuring the efficiency of the system and that you adhere to any operating and maintenance manual and annual servicing. We strongly advise servicing the system on an annual basis and this will take on average less than an hour to complete. It will also help you to meet your legal requirements with the Environment Agency. We Build It Ltd Service Contracts

t Emergency breakdown cover for 12 months. If you have any problem with your unit, call us and we will come out and fix it free of charge. t One service visit where all necessary checks are carried out. This includes assessing the aeration pattern, sludge levels and effluent quality. t All labour expenses for servicing and call outs are covered so there are no hidden costs. t The cost of all serviceable parts will be free of charge. This includes rebuilding the air pump, replacing the diaphragms and also the air filters. t Sludge return is carried out as required. This is the removal of settled sludge from the outer scum ring back into the centre chamber to be re digested and treated again. This helps to keep the emptying period low. t Emptying is NOT included in the agreement as the Bio-Pure does not require emptying for 3-5 years. t The service agreement lasts for 12 months and will also help

A simple Schematic of a BioPure Treatment Plant BOTTOM LEFT A simple Schematic of a BioPure Treatment Plant ABOVE LEFT & RIGHT

you meet your Environment Agency obligations regarding your Consent to Discharge. This includes keeping records of service, de-sludging and maintenance work for a minimum of 5 years.

Our Other Products include Mini SAF’s (for offices and outbuildings up to 4 persons) Pump Stations (standard and bespoke) Septic Tank Conversion Units (used as secondary treatment for underperforming septic tanks) For a full range of our products and servicing visit www.bio-pure.com www.webuildit-ltd.co.uk

49


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.