Page 9

T H A M E S T I D E W AY T U N N E L

nel route & key for the Thames Tideway Tunnel

‘By 2031, 8.6 million people will live in London. An estimated 600,000 new homes will be needed to absorb the growth. The sewerage network, already under severe pressure, needs an upgrade’

The TTT is very much a project with legs: three joint ventures have been selected as preferred bidders for the east, central and west contracts. BMB JV, a joint venture of BAM Nuttall Ltd., Morgan Sindall PLC and Balfour Beatty Group Ltd. has been named for the west contract; FLO JV brings together Ferrovial Agroman UK Ltd. and Laing O’Rourke Construction for the central contract; and CVB JV, made up of Costain, Vinci Construction 9

Profile for Energy Digital

Energy Digital - April 2015  

Without a doubt, one of the biggest issues monopolizing headlines in 2014 was the energy “crisis:” who was to blame; who had the (right) sol...

Energy Digital - April 2015  

Without a doubt, one of the biggest issues monopolizing headlines in 2014 was the energy “crisis:” who was to blame; who had the (right) sol...