Page 75

AUSTRALIA

completed over 250 projects throughout Australia by means of complete turnkey solutions. These turnkey solutions include conceptual design to final commissioning through the critical orchestration of experienced engineers, designers, project managers and construction personnel. It is in this way that CPP takes full responsibility for the entire project, allowing their clients to optimise their operations

and focus on their highest incomeproducing activities. CPP’s clients are able to dominate their own individual markets by taking advantage of the company’s extensive experience and expertise in delivering projects that range from traditional electrical infrastructure for power utilities, industry and mining through to the latest electrical infrastructure requirements for the renewable energy sector. w w w. c o n p o w e r. c o m . a u

75

Profile for Energy Digital

Energy Digital - April 2015  

Without a doubt, one of the biggest issues monopolizing headlines in 2014 was the energy “crisis:” who was to blame; who had the (right) sol...

Energy Digital - April 2015  

Without a doubt, one of the biggest issues monopolizing headlines in 2014 was the energy “crisis:” who was to blame; who had the (right) sol...