Tariffs for the period from 1 October 2002 until 30 March 2003 Tariffs in application from October 2002 until 30 March 2003 include

Tariffs for grid use ! Handling charges ! Tariffs for power subscription and additional power. ! Tariff for system management. Tariffs for ancillary services ! Tariff for primary frequency regulation, secondary equilibrium of the Belgian zone and black-start service. ! Tariff for voltage support and reactive power. ! Tariff for congestion management. ! Tariff for compensation of active losses (applicable only for off takes in the 70 kV or lower grid in Flanders). Levies ! Levy for financing public service obligations (federal level). ! Federal contribution (federal level). ! Levy for financing measures for promotion of rational energy use (applicable only for off takes in the 70 kV or lower grid in Flanders). ! Levy for financing measures for the use of renewable energy sources (applicable only for off takes in the 70 kV or lower grid in Flanders). ! Levy for occupying public domain in the Walloon Region

The tariffs do not include VAT.


Tariffs for grid use Handling charges (in application from 1 October 2002 until 31 March 2003) The handling charges for concluding an access contract amount to 1000 euros per contract. The charges are invoiced at the conclusion of a new contract or at the renewal of an existing contract. The handling charges for an Access Responsibility Contract amount to 2500 euros per contract.

Tariff for power subscription and additional power (in application from 1 October until 31 March 2003) !

Tariff for power subscription for a period of one year This scheme consists of a power subscription for each of the off take points. A single subscription is valid for one full year.


!

Tariff for power subscription for a period of one month The scale of tariffs draws a distinction between peak hours, off-peak hours and weekends as defined in the following table.

Day

Hour

Monday-Friday

0 until 7 h

Monday-Friday

7 until 22 h

Monday-Friday

22 until 24 h

Saturday

0 until 7 h

Saturday

7 until 24 h

Sunday

0 until 22 h

Sunday

22 until 24 h

Peak hours

Periods Off-peak hours

Week-end

This scheme allows the user to subscribe to three different power levels for each off take point depending on the period. The user can subscribe for example to different power levels during the weekend and during the week.


The tariffs differ according to the seasons. Winter covers the months from January until March and from October to December. Summer covers the months from April to September. !

Tariff for additional power For additional power that is registered by Elia ex-post, the prices equal 115% of the price for power subscription at the same point, according to the monthly scheme, during the corresponding period.

!

Local production For off take covered by local production, the price for the subscribed power is reduced with 30%. For these configurations, only the scheme for yearly subscription is valid.


This contractual formula is applicable to the off takes covered by a local production unit of which the injection point coincides with the off take point of the considered off take. The amount of the off take that can benefit from this tariff may not exceed 75 MW. The valid period of this type of subscription is limited to 1000 hours per year.

Tariff for system management !

in application from 1 October 2002 until 31 December 2002 (Euro/MWh)

on the 380/220/150-kV network

0,6812

at transformer output to the 70/36/30-kV network

0,9328

on the 70/36/30-kV network

1,3836

at transformer output to medium voltage

1,6652


!

in application from 1 January 2003 until 31 March 2003 (Euro/MWh)

on the 380/220/150-kV network

0,6052

at transformer output to the 70/36/30-kV network

0,8288

on the 70/36/30-kV network

1,2293

at transformer output to medium voltage

1,4795


Tariffs for ancillary services Tariff for primary frequency regulation, secondary equilibrium of the Belgian zone and black-start service (in application from 1 October 2002 until 31 March 2003) (Euro/MWh)

on the 380/220/150-kV network

1,5583

at transformer output to the 70/36/30-kV network

1,5583

on the 70/36/30-kV network

1,5583

at transformer output to medium voltage

1,5583


Tariff for voltage support and reactive power (in application from 1 October 2002 until 31 March 2003) (Euro/MWh)

! !

on the 380/220/150-kV network

0,2018

at transformer output to the 70/36/30-kV network

0,2018

on the 70/36/30-kV network

0,2018

at transformer output to medium voltage

0,2610

Elia System Operator makes quarter-hourly deliveries of reactive power that exceed tg Ď•=0.329 per off take point at a unit price of â‚Ź6/MVArh. In the event that the off taken active power does not exceed, on a quarterly basis, 10% of the valid subscriptions at any given point, the additional delivery of reactive power will be defined as the excess in respect of 32.9% of the 10% of the valid subscriptions at that point. Graphical presentation


Tariff for congestion management (in application from 1 October 2002 until 31 March 2003) (Euro/MWh)

on the 380/220/150-kV network

0,0646

at transformer output to the 70/36/30-kV network

0,0804

on the 70/36/30-kV network

0,0804

at transformer output to medium voltage

0,0804

Tariff for compensation of active losses (in application from 1 January 2002 until 31 March 2003

- applicable only for off takes in 70 kV

or lower grid in Flanders).

Active losses on the Elia system are compensated in kind by the Access Responsible Party in question, with exception of active losses on the nets of which the tension is lower than or equal to 70 kV, and assigned to off takes situated in the Flemish Region. The tariffs for compensation of active losses, applicable to such off takes, are mentioned in the table below. They are expressed in â‚Ź/MWh.


Peak hours

on the 380/220/150-kV network

Winter Off-peak hours

Weekend

Peak hours

Summer Off-peak hours

Weekend

---

---

---

---

---

---

at transformer output to the 70/36/30-kV network

0,1716

0,0883

0,1030

0,1477

0,0883

0,0979

on the 70/36/30-kV network

0,2869

0,1476

0,1721

0,2469

0,1476

0,1637

at transformer output to medium voltage

0,3566

0,1834

0,2140

0,3069

0,1834

0,2035


Levies For the execution of obligations following federal and regional laws Elia charges following levies for the period of 1 January 2003 till 31 March 2003:

The levies that were imposed before the period of 1 October 2002 till 31 December 2002 were not changed. A part from these levies other levies can be imposed on basis of decrees that are or will be in vigor, but of which the exact application modalities are not known at this moment. Levy for financing public service obligations (in application from 1 January 2002 until 31 March 2003 (Euro/MWh)

on the 380/220/150-kV network

0,3191

at transformer output to the 70/36/30-kV network

0,3191

on the 70/36/30-kV network

0,3191

at transformer output to medium voltage

0,3191

- federal level).


Federal contribution (from 10 January 2003 until 31 March 2003 - federal level). (Euro/MWh)

on the 380/220/150-kV network

1,0078

at transformer output to the 70/36/30-kV network

1,0078

on the 70/36/30-kV network

1,0078

at transformer output to medium voltage

1,0078

For the exemptions relating to the year 2003 provided for in Article 5 of the Decree of 24 March 2003, Elia will use the exemption claims validly submitted by the suppliers and certified by the regulator concerned. On this basis, Elia will pay the supplier in question the amount of â‚Ź 0,9029/MWh, which will be applicable to the quantities corresponding to the green certificates and cogeneration certificates mentioned in the exemption claims. During the period from 1 January 2003 to 9 January 2003, the surcharge for financing of the operating costs of the CREG is applicable. This amounts to â‚Ź 0,1049/MWh.


Levy for financing measures for promotion of rational energy use(in application from 1 January 2002 until 31 March 2003 applicable only for off takes in 70 kV or lower grid in Flanders).

(Euro/MWh)

on the 380/220/150-kV network

---

at transformer output to the 70/36/30-kV network

0,0777

on the 70/36/30-kV network

0,0777

at transformer output to medium voltage

0,0777


Levy for financing measures for the use of renewable energy sources

(applicable only for off takes in 70 kV or lower grid in Flanders).

(Euro/MWh)

on the 380/220/150-kV network

---

at transformer output to the 70/36/30-kV network

0,0850

on the 70/36/30-kV network

0,0850

at transformer output to medium voltage

0,0850


Levy for occupying public domain in the Walloon Region (Euro/MWh)

on the 380/220/150 kV network

---

at transformer output to 70/36/30 kV

0,2956

on the 70/36/30 kV networks

0,2956

at transformer output to medium voltage

0,2956

/Aansluit  

http://www.elia.be/en/products-and-services/access/~/media/files/Elia/Products-and-services/Aansluiting2/Access_tariffs_20022003.pdf

Advertisement