Page 1

EDUARD KHAIMOV PORTFOLIO


NYC

-

CENTRAL PARK BIRD BLIND

AND VISITOR CENTER THE GOAL OF THE PROJECT WAS TO CREATE A SPACE ON THE EDGE OF THE RESERVOIR IN CENTRAL PARK TO GIVE THE PUBLIC A LEARNING CENTER AND BIRD OBSERVATORY. ALL THE DRAWINGS ARE DONE BY HAND, PENCIL ON VELUM,

MODEL WAS

CONSTRUCTED OUT OF BASSWOOD.


THE FLYING SCHOOL OF DANCE WITH GROUNDED PERFORMANCES

“FROM OUR ROOTS TO THE SKY WE PERFORM IN THE SPIRIT OF DANCE” THE GOAL FOR THE PROJECT WAS TO CREATE A SCHOOL OF DANCE IN SOHO NYC. WHAT I HAVE DONE IS TO PRESERVE THE PLAZA AT THE SITE BY ANGLING THE BUILDING INWARDS ON ITSELF. THE WHOLE BUILDING HAS SEVERAL ANGLES WHICH ENFORCE A CONCEPT TO BUILD A DYNAMIC LOOKING STRUCTURE. THE MAIN ENTRANCE IS ALSO A SECONDARY PUBLIC PERFORMANCE SPACE. ALL THE DRAWINGS ARE DONE IN AUTOCAD WITH ILLUSTRATOR, MODEL WAS RENDERED IN SKETCHUP.


LIGHT WELL

MECHANICAL ROOF

STEEL RAIN SCREEN

ENCLOSED ROOF TOP GARDEN

GREEN ROOF

FENESTRATED BRICK

SUSTAINABILITY DIAGRAM

GROUND FLOOR

CAFE FLOOR

STUDIO FLOOR

BLACK BOX

/ ROOF TOP LOUNGE


WEST CHEALSEA ARTIST HOUSING PROJECT: THE GOAL OF THE PROJECT WAS TO DESIGN AFFORDABLE HOUSING FOR A COMMUNITY OF ARTISTS ON A LOT DIRECTLY ADJACENT TO THE HIGHLINE AND THE GALLERY DISTRICT OF NYC. ALL THE DRAWINGS ARE DONE IN AUTOCAD, REVIT, RHINO, SKETCHUP, PHOTOSHOP, AND ILLUSTRATOR. MODELS WERE MADE FROM MUSEUM BOARD, CHIPBOARD, AND BASSWOOD.


EXPLODED AXONOMETRIC SHOWING ELEMENTS OF THE BUILDING

FIRST AND SECOND FLOOR PLAN

THIRD AND FIFTH FLOOR PLAN


INWOOD NATATORIUM: MY GOAL FOR THIS PROJECT WAS TO MAKE A MULTI PROGRAMMABLE PUBLIC ARENA ON THE SITE SUCH THAT THE LOCAL NEIGHBORHOOD MAY USE THE BUILDING FOR MANY YEARS TO COME, EVEN IF THEY NEED TO CHANGE THE PROGRAM OF THE BUILDING. ALL DRAWINGS AND RENDERINGS WERE PRODUCED USING AUTOCAD, RHINO, REVIT, SKETCHUP, PHOTOSHOP, AND ILLUSTRATOR.

EXIT


DETAILED SECTION / ELEVATION

SITE SECTION WEST / EAST

EXIT

SITE SECTION NORTH / SOUTH


LEIBNIZ INSTITUTE FOR AGRICULTURAL ENGINEERING POTSDAM-BORNIUM(ATB) international architectural competition, germany, potsdam : construction of a center for technology and knowledge transfer.

THE FACE AND THE HEART -

VILLAGE COMMUNICATION COMMUNITY

HOST SCHOOL:

THE FACE

FH POTSDAM

ORGANIZOR:

KARL-HEINZ WINKENS

PORFESSORS:

RODRIGO TAPIA-OBREQUE PAOLA PENNINGER

STUDENT PARTICIPANTS SARAH MÜLLER_ FH POTSDAM MICHA HOFFMANN_ FH POTSDAM FARHODJON YUSUPOV_ FH POTSDAM CARSTEN SCHETTERS_ FH POTSDAM CARL WILLKE_ FH POTSDAM DONG KIM_ HANYANG UNIVERSITY, SEOUL, KOREA KYONG-HO CHOI_ HANYANG UNIVERSITY, SEOUL, KOREA TY SPECHT_ NORTH DAKOTA STATE UNIVERSITY EDUARD KHAIMOV_ NY INSTITUTE OF TECHNOLOGY

SECOND FLOOR PLAN 1:200

FIRST FLOOR PLAN 1:200

GROUND FLOOR PLAN 1:200

HEART AND FACE FUTURE CHILD CARE CENTER

PROCESS WORK MASTER PLAN 1:500

SECTION 1:100

CROSS SECTION 1:100

SITE SECTION 1:500

PRESENT WORK HISTORICAL WORK FUTURE WORK

PRIVATE PUBLIC

SECOND FLOOR PLAN 1:200

HEART AND THE FACE COMMUNICATION WITH THE WHOLE SITE

PUBLIC CIRCULATION

PUBLIC AND PRIVATE COURTYARDS

COMMUNICATION OF THE INSTITUTES WORK ON THE SITE

VIEW OF THE HEART

FIRST FLOOR PLAN 1:200

VIEW OF THE FACE

SECTION 1:100

GROUND FLOOR PLAN 1:200


BATHROOM RENOVATION COMPLETED IN ASSOCIATION WITH WILLIAM ARCHITECT William J. Rockwell architect LLC

WILLIAM / ARCHITECT 504 Grand Street E12 NY, NY 10002

È­

1/4" EQ.

EQ.

5'-9 3/4"

3"

3'-0"

EQ.

EQ.

1'-0"

william@williamarchitect.com/www.williamarchitect.com p 646 342 8946 f 212 353 1993

4'-3 1/4"

2 3/4"

5 1/4"

11 5/8"

1'-1 5/8"

5 1/4"

MOVE NEW WC 2-3 INCHES TOWARDS VANITY AS WASTE LINE PERMITS (V.I.P.)

È­

10" +/-

4"

11 5/8"

EXISTING

2'-10 1/2"

11" 2'-7"

2'-11"

C

CLEAR

1'-7"

B

WC

1'-6"

FLUSH MOUNT CEILING FIXTURE: "SENTINEL" BY WATERWORKS SHOWN 11"DIAMETER

È­

INTEGRATED NICHE WITH CORIAN SURROUND AND TILE BACK

CEILING FIXTURE

3"

SIM

2'-8" 1'-7"

C

2'-8 1/2"

2'-11"

2'-7"

4'-1" +/-

3'-8 3/4"

MAY VARY WITH TILE LAYOUT

A

5'-0 1/2"

5'-10"

B RECESSED SHOWER LIGHTS TBD

4"

B

3x6 MARBLE FLOOR TILES REMOVE ALL EXISTING WALL, FLOORS, CEILING TILES LIGHTING ACCESSORIES AND PARTITIONS

PLAN

1 1/2" = 1'-0"

1 1/2" = 1'-0"

1

2

5'-10"

8'-5" 1'-10 1/2" 1'-2 5/8"

3X6 MARBLE WALL TILE, RUNNING BOND

TP HOLDER BY SAMUEL HEATH/GEORGE TAYLOR SPECIALTIES

1/2" THICK CORIAN EDGED NICHE TILE BACK

AUGUST 30, 2012

ISSUED FOR CONSTRUCTION

AUGUST 10, 2012

Revisions

JULY 30, 2012

Meeting at Site

NICHE

CUSTOM INTEGRATED SHOWER BASE IN CORIAN ("CAMEO WHITE"). TROUGH DRAIN BY INFINITY # AG65. 3/8" CLEAR TEMPERED GLASS SET INTO CURB AND CONCEALED CEILING TRACK..

RELOCATE AND REPLACE TOILET WITH EXETER BY WATERWORKS

RELOCATE AND REINSTALL DOUBLE SHOWER RODS

C

3'-5"

4'-2 1/2"

3'-3"

3'-5"

TOWEL BAR ANCHORS

4'-2 1/2" INTEGRATED CORIAN SINKS "CAMEO WHITE"

D

1/2" = 1'-0"

,668(')25&216758&7,21

No.

Description

FLOOR PLANS, ELEVATIONS AND DETAILS

1'-0"

Copyright c 2012 William J. Rockwell architect LLC All rights reserved

ELEVATIONS

B

A

Date

RELOCATE AND REINSTALL DOUBLE SHOWER RODS

1'-3"

EL. 0'-0"

3'-4"

HAND SHOWER SUPPLY

2'-8" 6"

FINISHED FL.

HANSGROHE SHOWER RAINDANCE S 120 AIR 3-JET SHOWERHEAD POLISHED CHROME

WALL SCONCES BY WATERWORKS: OPUS #OPLT01

REMOVE EXISTING CAB. REPLACE GYP. BOARD

5

INTEGRATED CORIAN COUNTER W/ LAVS

DEMO EXISTING LIGHTS

EXISTING SPRINKLER HEAD TO REMAIN RAISE FLUSH WITH NEW CEILING

REFLECTED CEILING PLAN

Bath Renovation: 53 North Moore Street Apt 5J 1HZ<RUN1<

DATE: 7/10/2012 SCALE: AS NOTED

A-100


BATHROOM RENOVATION COMPLETED IN ASSOCIATION WITH WILLIAM ARCHITECT WILLIAM / ARCHITECT 504 Grand Street E12 NY, NY 10002

2'-10 1/2"

2'-8 1/2"

3"

william@williamarchitect.com/www.williamarchitect.com p 646 342 8946 f 212 353 1993

TROUGH DRAIN BY INFINITY: "AG65" CUT LENGTH AS PER MFR'S INSTRUCTIONS.

DATUM: TOP OF CORIAN BASE AND BOTTOM OF TILE JOINT

APPROX. 1/8" PER FOOT MIN.

FIN. FL. 1/2" ABOVE STRUCT. SLAB

3 1/2"

SLOPE TO DRAIN

EXISTING STRUCTURAL SLAB (V.I.F.)

CONFIRM LOCATION OF EXISTING SHOWER WASTE LINE. VERIFY WITH ARCHITECT AND OR CORIAN FABRICATOR FOR COORDINATION OF SHOWER BASE WITH EXISTING WASTE CONNECTION

1

SECTION DETAIL - LONG SECTION AT SHOWER BASE 3" = 1'-0"

MARBLE TILE

EXISTING STRUCTURE OR BACKUP (V.I.F.) / APPROX. LINE OF DEMO (V.I.F.)

1/16"

TOP OF CUSTOM CORIAN BASE

5/8" CEMENT BOARD FOR NEW TILE

1/2" 1/2" ST. STEEL CHANNEL ANCHORED TO CEMENT BOARD 1/8" THIN SET

CORIAN EXTENDS THREE INCHES ABOVE SHOWER BASE

1/2" 1/2"

CUSTOM FABRICATED CORIAN ("CAMEO WHITE") SHOWER BASE WITH PREPARED ROUTED TRACK FOR 1 4" THICK SHOWER GLASS BY OTHERS

3"

3/8" MARBLE TILE WALL ONLY 1/4" RADIUS 6 1/2"

4" THICK TEMPERED GLASS PARTITION

1/8" RADIUS

CUSTOM FABRICATED CORIAN ("CAMEO WHITE") SHOWER BASE BLOCKING AS NECESSARY TO SUPPORT CORIAN SHOWER BASE

CREATE SOLID BASE WITH CORIAN OR SIMILAR TO SUPPORT LARGE SHOWER GLASS IN TRACK

1/4" TEMPERED LOW IRON GLASS INSTALLED WITH STRUCTURAL SILICONE AS PER GLASS FABR. COLOR: BLACK

3 1/2"

1

SHEETROCK FILLER STRIP EXISTING 5/8" GYP. BOARD WITH 1/8" SKIM COAT PLASTER

LINE OF FIN. FLOOR BEHIND

T.O. SLAB

EXISTING STRUCTURAL SLAB (V.I.F.)

EL. 0'-0"

1/8" THIN SET 3/8" MARBLE TILE

SECTION DETAIL AT SHOWER BASE

2

SECTION DETAIL AT PERIMETER WALLS

3

6" = 1'-0"

PLUMBING SCHEDULE

CORIAN SCHEDULE

MATERIAL

TOILET

FINISH

TYPE

STYLE

NUMBER

MFR/FABR

WHITE GLOSSY

ELONG.WC

EXWC36 - EXETER ELONGATED

717875

WATERWORKS

QUANTITY REMARKS 1

HANSGRROHE

2

NUMBER

FABRICATOR *

QUANTITY

CUSTOM COUNTERS

2

REMARKS *

SIMILAR TO 965

AUGUST 30, 2012

ISSUED FOR CONSTRUCTION

INTEGRATED COUNTER WITH CUSTOM LAVATORIES

AUGUST 10, 2012

Revisions

SHOWER BASE

"

"

3'-0" X 5'-10"

"

1

SEE DETAIL 2-3/A100

JULY 30, 2012

1

BASE BOARD

"

"

0'-6" X 0'-7.5"

"

1

HANSGRROHE

1

BASE BOARD

"

"

0'-6" X 4'-0"

"

1

28331000

HANSGRROHE

1

BASE BOARD

"

"

0'-6" X 5'-10"

"

1

27451001

HANSGRROHE

1

BASE BOARD

"

"

0'-6" X 0'-2"

"

1

HG S TRIM PRESSURE BALANCE W/DIVERTER

04447000

HANSGRROHE

1

HANDSHOWER HOSE 50" LONG

28112000

HANSGRROHE

1

POLISHED

SLOT TROUGH DRAIN

AG65 (2'-11")

INFINITY DRAIN

1

SHOWER STEM

CHROME

POLISHED

RAINDANCE S120 AIR 3-JET SHOWER

27457001

HANSGRROHE

HAND SHOWER

CHROME

POLISHED

04341000

HAND SHOWER HOLDER

CHROME

POLISHED

PORTER S HANDSHOWER HOLDER

HAND SHOWER SUPPLY

CHROME

POLISHED

AXOR WALL OUTLET

THERM. SUPPLY

CHROME

POLISHED

HAND SHOWER HOSE

CHROME

POLISHED

"

DN15

S100 AIR GREEN 3-JET HANDSHOWER

LIGHTING AND POWER SCHEDULE

CUSTOM CUT FOR CORIAN

Date

Meeting at Site

No.

Description

SCHEDULES

FINISH SCHEDULE

ITEM

LOCATION

MATERIAL

MAIN LIGHT (A)

M.SP. ABOVE DR.

BRASS CHR. PLATED

SCONCES

ABOVE VANITY

"

LINEAR FT.

1

CHROME

SEE RCP 1/A100

HONED OR STANDARD

"

DRAIN

SWITCHES

FINISH

CAMEO WHITE

2'-0" X 5'-10"

METRIS S

RECEPTACLES

COLOR

LAVATORIES

"

POLISHED

SHOWER

ITEM

"

CHROME

REC. CEILING FIXTURE (C)

HANDLE IN POLISHED CHROME/ "UNIVERSAL" SEAT WITH CHROME HINGE

VANITY TOP

FAUCET

(B)

1'-0" = 1'-0"

CEILING DETAIL SIMILAR

TYPE

" WHITE TRIM GL LENS DIMMER

FINISH

STYLE

NUMBER

FABRICATOR

QUANTITY

REMARKS

ITEM

COLOR

FINISH

MATERIAL

NUMBER

POLISHED CHROME

SELT72

254667

WATERWORKS

1

SENTINEL

WALL TILE

EASTERN WHITE

HONED

MARBLE

MT# AS11924-03 ANN SACKS

POLISHED CHROME

OPLTO1

102155

WATERWORKS

3

OPUS

FLOOR TILE

"

"

DL69ZP

LUCIFER

2

"

CEILING

"

FABRICATOR

"

QUANTITY

REMARKS

95 SQ. FT. 24 SQ. FT.

PENETRATING SEALER AT FLOOR REQUIRED

5/8 GYP. BD. WITH 1/8 SKIM COAT

PAINTED

TBD

EGGSHELL

PAINTED

TBD

SEMI-GLOSS

"

,668(')25&216758&7,21

Copyright c 2012 William J. Rockwell architect LLC All rights reserved

ITEM

PLAN DETAIL

4

6" = 1'-0"

Bath Renovation: 53 North Moore Street Apt 5J 1HZ<RUN1<

DATE: SCALE:

7/10/2012 AS NOTED

A-200


Eduard khaimov Work Portfolio  
Advertisement
Read more
Read more
Similar to
Popular now
Just for you