Om mercado internacional ege haina finance 175mln

Page 62

Generation A generator's capacity is measured in terms of installed capacity, which refers to MW installed, and effective capacity. The table below sets forth installed and effective capacity for generation companies in the Dominican Republic that operate within the SENI as of December 31, 2006: Company

Installed Capacity (MW)

Effective Capacity (MW)

Technology

EGE Haina(1) ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ

663.4

598.8

Itabo ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ Empresa de Generacion π Hidroelectrica Dominicana ÏÏÏÏÏ AES Andres B.V ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ Compa¿nia de Electricidad San Pedro de Macorπ s S.A. ÏÏÏÏÏÏÏÏ Dominican Power Partners ÏÏÏÏÏÏÏ Generadora Palamara-La Vega, S.A. ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ Prysma Energy ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ Seaboard/Transcontinental Capital Corporation (Bermuda) Ltd. ÏÏÏ Monte Rio Power Corporation ÏÏÏÏ Compa¿nia de Electricidad de Puerto Plata S.A. ÏÏÏÏÏÏÏÏÏÏÏÏÏ Complejo Metalurgico π Dominicano, C. por AÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ LAESA ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ

432.5

377.3

Steam Turbine, Gas Turbine and Diesel Engine Steam Turbine and Gas Turbine

469.3 319.0

452.3 281.3

Hydro Turbine Combined Cycle

300.0 236.0

294.3 236.0

Combined Cycle Gas Turbine

194.5 185.0

190.1 179.3

Diesel Engine Combined Cycle

116.3 100.0

109.5 96.6

Diesel Engine Diesel Engine

76.9

65.2

Diesel Engine

42.0 31.4

40.7 30.8

Diesel Engine Diesel Engine

3,166.3

2,952.1

Total ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ Source: OC.

(1) Does not include the installed capacity or effective capacity of the Pedernales plant which is not connected to the SENI.

54


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.