Issuu on Google+

Atlas of emulations of the Informal II: From Planimetric to Holographic

EDUARDO NAVARRO MARTÍNEZ - TEAM 14

TV AND MOVIES RECORDING STUDIO

PROYECTOS 7 - UNIDAD FEDERICO SORIANO


A

individual profile (01-86)

B

team 14 profile contract negotiations previous program

C

(87-92) (93-96) (97-172)

final version plan drawings section drawings complementary images

short memory

(173-184) (185-194) (195-200) (201-200)


0

table of contents


A

individual profile


7


EFECTOS

placer memoria falta de concentraci贸n movimiento descoordinaci贸n tiempo

20% Air's transparecy 5 - 30 潞C Winter's air temperature (12h) 0,01 users/m2 Theoric density 0,02 users/hour Pedestrian flow 02 - 06 am Occupation schedule 95% Hermeticism

01_ programa olvidado / ad

01. Forgotten Program - Marihuana Addiction

8


LUZ LUNAR

RECORRIDO - TRA

MATERIAL: ESPEJO

m2

MATERIAL: HORMIGÓN SIN TRATAR MATERIAL: HORMIGÓN SIN TRATAR RUINA RUINA

placerplacer memoria memoria RECORRIDO - TRANSPARENCIA DEL AIRE falta de concentración falta de concentración movimiento movimiento descoordinación VARIACIÓN DE TEMPERATURAS A LO LARGO DEL DÍA descoordinación tiempo tiempo 20% Transparencia del Aire

del aire en invierno (12h) 5ºC //Transparencia 30ºC Temperatura del Aire 20% 2 Densidad teórica / densidad real 0,01 usuarios/m 5ºC // 30ºC Temperatura del aire en invierno (12h) Flujo Peatonal 0,02 usuarios/hora 2 Densidad ción teórica / densidad real 0,01 usuarios/m 02-06 am Ocupación horaria / adicción marihuana 0,02 usuarios/hora Flujo Peatonal 95% Hermeticidad 02-06 am Ocupación horaria marihuana 95% Hermeticidad

Aire 9 e en invierno (12h)

RECORRIDO - TRAN

MATERIAL: ESPEJO

m2

EFECTOS

RMIGÓN SIN TRATAR

LUZ LUNAR

EFECTOS

PEJO

ESCALA 1/75

01. Forgotten Program - Explanatory diagrams

V


20% Air's transparency 5 - 30 ยบC Winter's air temperature (12h) 0,01 users/m2 Theoretical density 0,02 users/hour Pedestrian flow 02 - 06 am Occupation schedule 95% Hermeticism

01. Forgotten Program - Plan

10


3,50

ESCALA 1/75

LUZ LUNAR

RECORRIDO - TRANSPARENCIA DEL AIRE

MATERIAL: ESPEJO

m2

MATERIAL: HORMIGÓN SIN TRATAR

VARIACIÓN DE TEMPERATURAS A LO LARGO DEL DÍA

EFECTOS

RUINA

ado / adicción marihuana

11

placer memoria falta de concentración movimiento descoordinación tiempo

20% Transparencia del Aire 5ºC // 30ºC Temperatura del aire en invierno (12h) 0,01 usuarios/m2 Densidad teórica / densidad real 0,02 usuarios/hora Flujo Peatonal horaria Program - Section 02-06 am 01.Ocupación Forgotten 95% Hermeticidad

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


3,50

ESCALA 1/75

01. Forgotten Program - Plan

LUZ LUNAR

MATERIAL: ESPEJO

RECORRIDO - TRANSPARENCIA DEL AIRE

12


20% 30潞C s/m2 /hora 6 am 95%

Transparencia del Aire Temperatura del aire en invierno (12h) Densidad te贸rica / densidad real 01. Forgotten Program - 1/50 Model Flujo Peatonal p UD. Soriano 2013/2014 Ocupaci贸n horaria Eduardo Navarro Mart铆nez (10293) Hermeticidad

7.

13


01. Forgotten Program - 1/50 Model

14


15


EFECTOS

euforia energía alerta a estímulos auditivos paranoia realización de tareas más rápidas inquietud alucinación auditivas

02_ programa sonido / adicción cocaina

02. Sound Program - Cocaine Addiction

16


3,50 ESCALA 1/100

VARIACIÓN APERTURAS

VARIACIÓN TRANSPARENCIA AIRE

SONIDOS

APERTURAS TRANSPARENCIA ALTA

euforia APERTURAS TRANSPARENCIA ALTA energía TRANSPARENCIA MEDIA alerta a estímulos auditivos HERMETICIDAD - NO TRANSP. paranoia PAVIMENTO DE HORMIGÓN realización de tareas másDErápidas PAVIMENTO MADERA inquietud alucinación auditivas

VARIACIÓ

HERMETICIDAD - NO TRANSP. PAVIMENTO DE HORMIGÓN PAVIMENTO DE MADERA VARIACIÓN APERTURAS

+ +

VARIACIÓ

FOCOS DE EXPANSIÓN DE SONIDOS

euforia

FOCOS DE EXPANSIÓN DE SONIDOS

17

7.

EFECTOS

Transparencia del Aire energía Temperatura del aire en invierno (12h) alerta a Densidad teórica / densidad02. realSound Program - Explanatory diagrams euforia Ocupación horaria p UD. Soriano 2013/2014parano energíaEduardo Navarro Martínez (10293) Hermeticidad

TOS

0% 5ºC m2 ños 0%

TRANSPARENCIA MEDIA

alerta a estímulos auditivos

realizac inquietu


10% Air's transparency 12 - 25 ยบC Winter's air temperature (12h) 0,2 / 4 users/m2 Theoretical density / real density 24/7 - 25 years Occupation schedule 95% Hermeticism

02. Sound Program - Cocaine Addiction

18


3,50 ESCALA 1/100

ERTURAS

ANSPARENCIA ALTA

ANSPARENCIA MEDIA VARIACIÓN APERTURAS

ERMETICIDAD - NO TRANSP.

VIMENTO DE HORMIGÓN

VIMENTO DE MADERA

VARIACIÓN TRANSPARENCIA AIRE

+

19

ECTOS

FOCOS DE EXPANSIÓN DE SONIDOS

euforia 02. Sound Program - Section energía alerta a estímulos auditivos paranoia realización de tareas más rápidas


3,50

02. Sound Program - Plan

ESCALA 1/100

19


02. Sound Program - 1/50 Model 10% 12ºC // 25ºC 0,2 // 4 usuarios/m2 24 horas 21 // 25 años 5 - 90%

Transparencia del Aire Temperatura del aire en invierno (12h) Densidad teórica / densidad real Ocupación horaria Hermeticidad

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


02. Sound Program - 1/50 Model

22

10% Transpar


23


EFECTOS

desinhibici贸n ataxia locomotrix irritabilidad desequilibrio somnolencia conducta impulsiva

movimiento l铆quido e interrumpido

03_ programa tesoro / adicci贸n alcohol

03. Treasure Program - Alcohol Addiction

24


VARIAC VARIACIÓN TRANSPARENCIA AIRE: 5 - 95%

ESCALA 1/75

MATERIAL: VIDRIO TRASLÚCIDO PANELES VARIABLES DE POSICIÓN PAVIMENTO ARENA RETARDANTE VARIACIÓN APERTURAS

POSIBLES RECORRIDOS

95%

03. Treasure Program - Explanatory diagrams

25


5 - 95% Air's transparency 2,88 - 1000€₏/m2 Rentability 0,1 users/m2 Theoretical density 24 hours Occupation schedule 5 - 90% Hermeticism

03. Treasure Program - Alcohol Addiction

26


desinhibición ataxia locomotrix irritabilidad desequilibrio somnolencia conducta impulsiva

ESCALA 1/75

MATERIAL: VIDRIO TRASLÚCIDO PANELES VARIABLES DE POSICIÓN PAVIMENTO ARENA RETARDANTE VARIACIÓN APERTURAS

POSIBLES RECORRIDOS

VARIACIÓN TRANSPARENCIA AIRE: 5 - 95%

3,50

movimiento líquido e interrumpido

grama tesoro

5 - 95% 2,88 - 1000 €/m2 0,1 usuarios/m2 24 horas 5 - 90%

Transparencia del Aire Rentabilidad Densidad teórica / densidad real Ocupación horaria Hermeticidad

03. Treasure Program - Section

27

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


a

oe do

ESCALA 1/75

MATERIAL: VIDRIO TRASLÚCIDO PANELES VARIABLES DE POSICIÓN PAVIMENTO ARENA RETARDANTE VARIACIÓN APERTURAS 03. Treasure Program - Plan VARIACIÓN TRANSPARENCIA AIRE: 5 - 95%

POSIBLES RECORRIDOS

28


03. Treasure Program - 1/50 Model

29


03. Treasure Program - 1/50 Model

30


31


EFECTOS

hipertermina reducci贸n del cansancio euforia convulsiones trastornos paranoides aumento de la atenci贸n

cristal - forma geom茅trica - cerrada

10_ programa inaccesible / adicci贸n metanfetamina

10. Inaccesible Program - Metanfetamine Addiction

32


LUCERNARIO

LUCERNARIO

ESCALA 1/100

MATERIAL: AGUA

33

ECTOS

PROYECTO ENTERRADO

TEMPERATURA - FRÍO TEMPERATURA - TEMPLADO TEMPERATURA - CALOR

hipertermina reducción delProgram cansancio 10. Inaccesible - Explanatory diagrams euforia convulsiones hipertermina


25% Air's transparency 5 - 30ºC Winter's air temperature (12h) -10 - 30ºC Winter's floor temperature (12h) 90% Relative winter's air humidity (12h) 1000€€/m2 Rentability 90% Hermeticism

10. Inaccesible Program - Metanfetamine Addiction

34


LUCERNARIO

ESCALA 1/100

TEMPERATURA - FRÍO MATERIAL: AGUA

TEMPERATURA - TEMPLADO TEMPERATURA - CALOR

EFECTOS

3,50

PROYECTO ENTERRADO

rama inaccesible / adicción metanfetamina

hipertermina reducción del cansancio euforia convulsiones trastornos paranoides aumento de la atención

25% 5ºC // 30ºC -10 ºC // 30ºC 90% 1000 €/m2 90%

Transparencia del Aire Temperatura del aire en invierno (12h) Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Rentabilidad Hermeticidad

10. Inaccesible Program - Section

35

cristal - forma geométrica - cerrada

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


LUCERNARIO

ESCALA 1/100

TEMPERATURA - FRÍO MATERIAL: AGUA

TEMPERATURA - TEMPLADO TEMPERATURA - CALOR

PROYECTO ENTERRADO

10. Inaccesible Program - Plan

36


10. Inaccesible Program - 1/50 Model

37


% ÂşC ÂşC % m2 %

Transparencia del Aire Temperatura del aire en invierno (12h) Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Rentabilidad Hermeticidad

p7. UD. Soriano 2013/2014 Eduardo Navarro MartĂ­nez (10293)

10. Inaccesible Program - 1/50 Model

38


39


EFECTOS

asociada al contacto orgasmo sexo molécula del amor / afrodisíaca neurotransmisor

15_ programa hedonista / adicción oxitocina

15. Hedonistic Program - Oxytocin Addiction

40


S

N

Cys

O

S

O H2N

N

O

O O

Gln

O

O

O

O N H

Gly

N H O

HN

H NH N

O

NH2

NH2

ESCALA 1/100

Leu

O H N

H2N

TRANSPARENCIA REDUCIDA DEL AIRE - POCA LUZ

TRANSPARENCIA ELEVADA DEL AIRE - LUZ

Gly

REFLEXIÓN DE LA LUZ E IMAGEN

O

OH Tyr O H2N

TRANSPARENCIA ALTA

O

N H

Cys

HEDONISMO

H HN

ller

S Cys

Pro

H N

N H

O

O

REFLEXIÓN - ESPEJO

Gln O

O

NH2

OPACIDAD ELEMENTOS DE ACCESO

O

NH2

EFECTOS

3,50

O N H

Gly

O

H N

N

FECTOS

HN

O

O H2 N

DE LA LUZ

OXITOCINA

S

Leu

15. Hedonistic Program - Explanatory diagrams asociada al contacto orgasmo sexo 41 molécula del amor / afrodisíaca

asociada al c orgasmo sexo molécula del neurotransm

1 - 90% Transparenc 25ºC Temperatur


1 - 90% Air's transparency 25ยบC Winter's floor temperature (12h) 25% Relative winter's air humidity (12h) 0,01 users/m2 Relative density 1 users/hour Pedestrian flow 1 - 99% Hermeticism

15. Hedonistic Program - Oxytocin Addiction

42


Cys

H HN

ller

S Cys

Pro

S

N

H N

N H O

N H

Gly

O

H N

O H2N

HN

O

Leu

Gln O

O

O

O

O

NH2

NH2

ESCALA 1/100

OH Tyr O H2N

TRANSPARENCIA ALTA

O

N H

Cys

HEDONISMO

H HN

ller

S Cys

Pro

H N

N H

REFLEXIÓN DE LA LUZ E IMAGEN

EFECTOS

TRANSPARENCIA ELEVADA DEL AIRE - LUZ

15_ programa hedonista / adicción sexo

O N H

Gly O

O

O

H N

N

TRANSPARENCIA REDUCIDA DEL AIRE - POCA LUZ

HN

O

O H2N

OXITOCINA

S

Leu

O

O

NH2

O

NH2

asociada al contacto orgasmo sexo molécula del amor / afrodisíaca neurotransmisor

1 - 90% 25ºC 25% 0,01 usuarios/m2 1 usuario / hora 1 - 99%

Transparencia del Aire Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Densidad relativa / densidad real Flujo peatonal Hermeticidad

15. Hedonistic Program - Section

43

OPACIDAD ELEMENTOS DE ACCESO REFLEXIÓN - ESPEJO

Gln

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


OH Tyr O H2N

O

N H

Cys

H HN

ller

S Cys

Pro

S

N

H N

N H O

N H

Gly

O

H N

O H2N

HN

O

Leu

Gln O

O

O

O

O

NH2

NH2

ESCALA 1/100

OH Tyr O H2N

TRANSPARENCIA ALTA

O

N H

Cys

HEDONISMO

H HN

ller

S Cys

Pro

N H

O H2N

REFLEXIÓN DE LA LUZ E IMAGEN

O N H

Gly O

O

NH2

OPACIDAD ELEMENTOS DE ACCESO REFLEXIÓN - ESPEJO

Gln O

O

O

NH2

3,50

TRANSPARENCIA ELEVADA DEL AIRE - LUZ

O

H N

N

TRANSPARENCIA REDUCIDA DEL AIRE - POCA LUZ

HN

O

Leu

H N

OXITOCINA

S

EFECTOS

15. Hedonistic Program - Plan asociada al contacto orgasmo sexo molécula del amor / afrodisíaca neurotransmisor

44


15. Hedonistic Program - 1/50 Model

45


15. Hedonistic Program - 1/50 Model

1 - 90% Transparencia del Aire 25ยบC Temperatura del suelo en invierno46 (12h) 25% Humedad relativa del aire en invierno 2


47


EFECTOS

estimulante bloqueante aumento de la presi贸n irritabilidad nerviosismo falta de concentraci贸n

16_ programa difuso / adicci贸n nicotina

16. Vague Program - Nicotine Addiction

48


HERMETICIDAD DEL 1% - FACILIDAD DE FLUJO PEATONAL

ESCALA 1/150

RECORRIDOS

TRANSPARENCIA ELEVADA DEL AIRE - LUZ POCA TRANSPARENCIA ELEVADA DEL AIRE - OSCURIDAD LÁMINA AGUA

49

EFECTOS

3,50

LUJO PEATONAL

estimulante bloqueante aumento de la presión 16. Vague Program - Explanatory diagram irritabilidad nerviosismo falta de concentración


10% Air's transparency 20ยบC Winter's air temperature (12h) 20ยบC Winter's floor temperature (12h) 40% Winter's air relative humidity 1 - 99% Hermeticism

16. Vague Program - Nicotine Addiction

50


ESCALA 1/150

TRANSPARENCIA ELEVADA DEL AIRE - LUZ

HERMETICIDAD DEL 1% - FACILIDAD DE FLUJO PEATONAL

LÁMINA AGUA

POCA TRANSPARENCIA ELEVADA DEL AIRE - OSCURIDAD

EFECTOS

3,50

RECORRIDOS

16_ programa difuso / adicción nicotina

estimulante bloqueante aumento de la presión irritabilidad nerviosismo falta de concentración

10% 20ºC 20ºC 40% 1 - 99%

Transparencia del Aire Temperatura del aire en invierno (12h) Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Hermeticidad

16. Vague Program - Section

51

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


ESCALA 1/150

TRANSPARENCIA ELEVADA DEL AIRE - LUZ

HERMETICIDAD DEL 1% - FACILIDAD DE FLUJO PEATONAL

LÁMINA AGUA

POCA TRANSPARENCIA ELEVADA DEL AIRE - OSCURIDAD

EFECTOS

3,50

RECORRIDOS

estimulante bloqueante aumento de la presión irritabilidad nerviosismo falta de concentración

16. Vague Program - Plan

16_ programa difuso / adicción nicotina

10% 20ºC 20ºC 40% 1 - 99%

Transparencia del Aire Temperatura del aire en invierno (12h) Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Hermeticidad

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)

52


16_ programa difuso / adicción nicotina

10% 20ºC 20ºC 40% 1 - 99%

Transparencia del Aire Temperatura del aire en invierno (12h) Temperatura del suelo en invierno (12h) Humedad relativa del aire en invierno Hermeticidad

16. Vague Program - 1/50 Model

53

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


16. Vague Program - 1/50 Model

54


55


EFECTOS

estimulante sistema nervioso insomnio nerviosismo excitaci贸n desvar铆os

25_ programa atractor / adicci贸n cafe铆na

25. Attractive Program - Caffeine Addiction

56


EFECTOS

estimulante sistema nervioso insomnio nerviosismo excitación desvaríos

ATRACCIÓN AL RECORRIDO PROLONGADO POR PUNTOS DISUASORIOS RECORRIDOS FOCOS DE ATENCIÓN Y ATRACCIÓN ELEMENTOS DE ATRACCIÓN ELEVADA TRANSPARENCIA

3,50

NO TRANSPARENCIA

25. Attractive Program - Explanatory diagrams

57

2 - 5% T


02 - 05% Air's transparency 120 users/hour Pedestrian flow 24/7 Occupation schedule 95 - 99% Hermeticism

25. Attractive Program - Caffeine Addiction

58


EFECTOS

estimulante sistema nervioso insomnio nerviosismo excitación desvaríos

ATRACCIÓN AL RECORRIDO PROLONGADO POR PUNTOS DISUASORIOS RECORRIDOS FOCOS DE ATENCIÓN Y ATRACCIÓN ELEMENTOS DE ATRACCIÓN

ESCALA 1/100

ELEVADA TRANSPARENCIA

3,50

NO TRANSPARENCIA

25_ programa atractor / adicción cafeina

2 - 5% 120 usuarios /hora 24 horas 95 - 99%

Transparencia del Aire Flujo Peatonal Ocupación horaria Hermeticidad

25. Attractive Program - Section

59

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


ATRACCIÓN

CIÓN

ESCALA 1/100

CIA

25. Attractive Program - Plan

60


2 - 5% 0 usuarios /hora 24 horas 95 - 99%

Transparencia del Aire Flujo Peatonal Ocupaci贸n horaria Hermeticidad

p7. UD. Soriano 2013/2014 Eduardo Navarro Mart铆nez (10293)

25. Attractive Program - 1/50 Model

61


25. Attractive Program - 1/50 Model

62


63


EFECTOS

euforia tensi贸n y ansia paranoia modificaci贸n qu铆mica del cerebro hostilidad

26_ programa transeunte / adicci贸n crack

26. Pedestrian Program - Crack Addiction

64


ESCALA 1/100

DRIO TRASLÚCIDO

VIDRIO TRASLÚCIDO

ECORRIDOS

RECORRIDOS

VISTA DIFUMINADA DE LOS TRANSEUNTES VISTA DIFU VISTA DIFUMINADA DE LOS TRANSEUNTES

3,50

EBOTE DE LA LUZ ENTRE LOS MÚLTIPLES REBOTE DEVIDRIOS LA LUZ ENTRE LOS MÚLTIPLES VIDRIOS NTRE LOS MÚLTIPLES VIDRIOS EMENTOS ALTERADORES DELELEMENTOS RECORRIDOALTERADORES DEL RECORRIDO DORES DEL RECORRIDO

EFECTOS

euforia euforia euforia 26. Pedestrian tensión y ansia tensiónProgram y ansia- Explanatory diagrams tensión y ansia paranoia paranoia paranoia modificación química modificación del cerebro química del cerebro modificación química del cerebro 65 hostilidad hostilidad hostilidad

EFECTOS

ESCALA 1/100


20 - 8.000 €₏/m2 Profitability 0,2 / 0,1 users/hour Theoretical density 80 users/hour Pedestrian flow 24/7 Occupation schedule 02 - 05% Hermeticism

26. Pedestrian Program - Crack Addiction

66


ESCALA 1/100

VIDRIO TRASLÚCIDO RECORRIDOS REBOTE DE LA LUZ ENTRE LOS MÚLTIPLES VIDRIOS VISTA DIFUMINADA DE LOS TRANSEUNTES

EFECTOS

3,50

ELEMENTOS ALTERADORES DEL RECORRIDO

dicción crack

euforia tensión y ansia paranoia modificación química del cerebro hostilidad

20 - 8.000 €/m2 0,2 // 0,1 usuarios/m2 80 usuarios/hora 24 horas 2 - 5%

Rentabilidad Densidad teórica / densidad real Flujo peatonal Ocupación horaria Hermeticidad

26. Pedestrian Program - Section

67

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


ESCALA 1/100

VIDRIO TRASLÚCIDO RECORRIDOS REBOTE DE LA LUZ ENTRE LOS MÚLTIPLES VIDRIOS

3,50

ELEMENTOS ALTERADORES DEL RECORRIDO

VISTA DIFUMINADA DE LOS TRANSEUNTES

26. Pedestrian Program - Plan

68


26. Pedestrian Program - 1/50 Model

69


26_ programa transeunte / adicción crack

ntabilidad nsidad teórica / densidad real jo peatonal

20 - 8.000 €/m2 0,2 // 0,1 usuarios/m2 80 usuarios/hora 24 horas 2 - 5%

Rentabili Densida Flujo pea Ocupac Hermetic

26. Pedestrian Program - 1/50 Model

70


71


EFECTOS

analgésico hipnótico sedante apatía dism. tensión arterial

31_ programa trágico / adicción heroína

31. Tragic Program - Heroine Addiction

72


ESCALA 1/100

MATERIAL OPACO - HERMETICIDAD RECORRIDOS MAYOR TRANSPARENCIA DEL AIRE - ILUMINACIÓN TENUE

31. Tragic Program - Explanatory diagrams

73


15 - 20% Air's transparency 30 / 5ยบC Winter's air temperature (12h) 3 - 5 users/hour Pedestrian flow 01 hour Occupation schedule 90 - 95% Hermeticism

31. Tragic Program - Heroine Addiction

74


ESCALA 1/100

MATERIAL OPACO - HERMETICIDAD RECORRIDOS

EFECTOS

3,50

MAYOR TRANSPARENCIA DEL AIRE - ILUMINACIÓN TENUE

15 - 20% 30ºC // 5ºC 3 - 5 usuarios / hora 01 hora 90 - 95%

analgésico hipnótico sedante apatía dism. tensión arterial

Transparencia del aire Temperatura del aire en invierno (12h) Flujo peatonal Ocupación horaria Hermeticidad

31. Tragic Program - Section

75

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


ESCALA 1/100

MATERIAL OPACO - HERMETICIDAD 31. Tragic Program - Plan RECORRIDOS MAYOR TRANSPARENCIA DEL AIRE - ILUMINACIÓN TENUE

76


31. Tragic Program - 1/50 Model

% Transparencia del aire ยบC Temperatura del aire en invierno (12h) 77 ra Flujo peatonal


31. Tragic Program - 1/50 Model

78


79


EFECTOS

aumento de la percepción sensorial euforia inquietud confusión agobio trastornos psicóticos

35_ programa paranoico / adicción éxtasis MDMA

35. Paranoiac Program - MDMA Addiction

80


ESCALA 1/100

ESCALAESCA 1/100

VIDRIO TRANSPARENTE VIDRIO TRANSPARENTE VIDRIO TRANS VID ESPEJO

3,50

3,50

EFECTOS

aumento de aumento la percepción aumento de aumento la de sensorial percepción la percepción de la percepción sensorial sensorial sensorial euforia euforia euforiaeuforia inquietud inquietud inquietud inquietud confusión confusión confusión confusión agobio agobio agobio agobio 35. Paranoiac Program - Explanatory diagrams trastornos psicóticos trastornos trastornos psicóticos trastornos psicóticos psicóticos

EFECTOS EFECTOS

EFECTOS

3,50

PARANOIA - MULTIPLICACIÓN PARANOIA PARANOIA - DESORIENTACIÓN - MULTIPLICACIÓN PARANOIA - MULTIPLICACIÓN --MULTIPLICACIÓN DESORIENTACIÓN - DESORIENTACIÓN - DESORIENTACIÓN

81 92 - 98% Transparencia 92 - 98% 92 del - Transparencia 98% 92 -Transparencia 98% Transparencia aire del airedel aire del aire

ESPEJO ESPEJO

ESP

RECORRIDOS

RECORRIDOS RECORRIDOS REC

REBOTE DE LA LUZ Y LA IMAGEN

REBOTE DE REBOTE LA LUZ DE REB LA Y LA IMAGEN Y LA IMAGEN Y LA


92 - 98% Air's transparency 0 €₏/m2 Profitability 0,1 / 4 users/m2 Theoretical density / Real density 20 users/hour Pedestrian flow 24 hour Occupation schedule 02 - 10% Hermeticism

35. Paranoiac Program - MDMA Addiction

82


ESCALA 1/100

VIDRIO TRANSPARENTE ESPEJO

PARANOIA - MULTIPLICACIÓN - DESORIENTACIÓN

RECORRIDOS

EFECTOS

3,50

REBOTE DE LA LUZ Y LA IMAGEN

aumento de la percepción sensorial euforia inquietud confusión agobio trastornos psicóticos

92 - 98% 0 €/m2 0,1 // 4 usuarios/m2 20 usuarios/hora 24 horas 2 - 10%

Transparencia del aire Rentabilidad Densidad teórica / densidad real Flujo peatonal Ocupación horaria Hermeticidad

35. Paranoiac Program - Section

83

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)


ESCALA 1/100

VIDRIO TRANSPARENTE ESPEJO

PARANOIA - MULTIPLICACIÓN - DESORIENTACIÓN

35. Paranoiac Program - Plan

RECORRIDOS REBOTE DE LA LUZ Y LA IMAGEN

84


35_ programa paranoico 35. Paranoiac Program - 1/50 Model

85

92 - 98% 0 â‚Ź/m2 0,1 // 4 usuarios/m2 20 usuarios/hora 24 horas 2 - 10%

Transparenc Rentabilidad Densidad te Flujo peaton OcupaciĂłn Hermeticida


35. Paranoiac Program - 1/50 Model 92 - 98% 0 €/m2 0,1 // 4 usuarios/m2 20 usuarios/hora 24 horas

Transparencia del aire Rentabilidad Densidad teórica / densidad real Flujo peatonal Ocupación horaria

p7. UD. Soriano 2013/2014 Eduardo Navarro Martínez (10293)

86


B

team profile


1 contract


CONTRACT!

! !

BETWEEN! EDUARDO NAVARRO MARTÍNEZ student from ETSAM (Universidad Politécnica de Madrid) - Madrid, Spain! HEON JEE KIM student from Soongsil University!

!

!

WHEREAS!

I.- This document sets forth the terms of agreement between EDUARDO NAVARRO and KIM collaboration! II.- In consideration of the premises and the mutual covenants and agreements here contained, the parties, having legal and contractual capacity, enter into this collaboration agreement according to the following!

!

!

STIPULATIONS!

FIRST.- WORK! The Parties intend to promote and exploit the following work:! Title: “Atlas of emulations of the informal II: from Planimetric to Holograpic”! University Faculty: “Architecture”! Duration: since mid-march 2014 until end-may! Year of production: 2014!

!

SECOND.- GRANT OF RIGHTS! Therefore, the Parties do hereby grant licenses to their respective universities, the exclusive right to reproduce, distribute, echibit, advertise, market and exploit the project in the languages set out here.! To this end, the Parties shall be entitled to negotiate and conclude license and/or distribution agreements with third parties for the exploitation of the project. The universities shall respect the integrity of the project.!

!

THIRD.- THE QUESTION OF AUTHORSHIP! The Parties are granted the right to insert or have inserted their logo, trademark or trade name before the beginning or at the end of the project, or in any produced materials.!

!

FORTH.- WORKING METHOD! All works must be edited and delivered in one of the following extensions: .JPG, .PDF, .PSD, .DWG, .PPT, .PNG, .AVI, .MOV, .3DM! Also, hand drawing or sketches must be scanned or photographed.! In relation to Dropbox Folder Organization:! - Folder of Suggestions like images, websites, ideas, videos, articles from magazines or newspapers, TV programs, etc.! - Folder for made documents (not only the final documents, also proceed documents always editable and non-editable documents! - Optional text document as a project diary!

! ! !

FIFTH.- WORK LANGUAGE! The language used for the workflow of the present agreement should be English.! SIXTH.- COMMUNICATION! Communication will be made through Facebook, email, Skype and KakaoTalk.! SEVENTH.- TIMETABLE! The Parties agree to share their work and talk about it at least every two days via email or Facebook if they are both online.!

!

EIGHTH.- METHODOLOGY! The Parties undertake to contribute ideas of different sorts for the achievement of the goals governing the subject of this contract.! On the one hand, HEON JEE KIM will be responsible for making models that will help understand the project better and on the other hand, EDUARDO NAVARRO MARTINEZ will be responsible for the elaboration of renders using the required software. Both Parties will do CAD drawings and diagrams to explain the project.!

!

NINTH.- BREACH OF CONTRACT! Whenever any Party breaches the provisions of the present agreement, the defaulting party, aT the other party’s written request, shall fulfill its obligation in the term of seven days maximum. The non-fulfillment of their respective contractual obligations by any of the Parties, shall entitle the non-defaulting party, at its sole decision, to terminate this agreement.!

!! 91

Contract


TENTH.- OTHER AGREEMENTS! - Revise any new document daily and try to comment constructively as well as give suggestions and directions as of how the project should evolve! - Revise together the teachers corrections trying to find ways to better the project! - Always try to help the other team member whenever one of them asks for help!

!! !! !

In witness whereof, the Parties here have executed this agreement in two copies, March 15th 2014.!

Signatures:!

Eduardo Navarro MartĂ­nez!

!

!

!

!

!

Heon Jee Kim

Contract

92


2 negotiations


NEGOTIATIONS

10

11

12

the coinciding spaces were divided in half to facilitate the entry of light from the exterior 13

14

15

16

17

18

19

20

21 22

13

14

15

18

19

20

21

13

14

15

16

17

18

the coinciding spaces were divided in half and some possible communications in the future were discussed and arranged

16

17

19

20

21 22

23

24

25

13

26

14

15

16

17

18

19

20

21 22

23

24

team 20 gave up most of its coinciding space as long as we, team 14, gave him some exterior light coming through our program

25

team 19 gave up most of its coinciding space with the condition to have access to our program in the indicated area and collaborate together in the structure

26

Negotiations 13

14

15 17

16

95 18

20

19 21

team 20 will have the right to the facades and some spaces to communicate with the indicate area as well as create communications

PLANTA 8


NEGOTIATIONS NEGOTIATIONS

10 12

10

12

13 15

18

11

13

11

14 10

11

15

18

12

10

12

10 13

20

20

12 15

14

20

18

18

14

13

20

15

16

16

17 22

17

1621 22

19

19

16 21

14

20

16

22

17

22

14

17

14 19

17

16

21

1621

15

20

15

18

17

13

1820 15

20

23

24

23

24

23 13

1315 13

14

17 17

20

20

20

18

22

24

23

24

23

23

24

23

23

24 13 15

13 15

18

15

14 19

18

13

19

17

22

14

14

22

18

20

1917

18

20

19

16 16

17

17

1621 22

16

16 21

22 21

19

22

22

21

26

26

17

19

21 21 26

22

17

14 19

16

1621

21

22

25

14

13

16

22

25

25

20

20

16

17 17

19

25

18 15

20

16

17

19

25

26

26

14 14

19

21 26 26

14

13

15

26

25 14

14

20

24

21

1621

22

25 25

20

18

18

16

17 2222

17

18

16

21 22

16

21

25

13

18 15

17

19

25

13

15

16

14 19 19

20

23 24 23

15

19

20

18

15

19

20

18

24

21

14

13

15

24

21

14 19

14

13 15

18

19

20

13

21 16

17 18

13 18

22

the coinciding spaces were divided in half to facilitate the entry of light from the exterior the coinciding spaces were divided in half to facilitate the entry of light from the exterior the coinciding spaces were divided in half to facilitate the entry of light from the exterior

16

17 17

21

21 19

13

18 15

22

14 19

20 13

20

16

17

11 14

14 19

20

15

18

19

13

13

18

15

19

13

15

15

17 11

21

18 15

13

thethe coinciding coinciding spaces spaces were were divided divided in half in half to facilitate to facilitate thethe entry entry of light of light from from thethe exterior exterior

14

21

21

26

26

thethe coinciding coinciding spaces spaces were were divided divided in half in half andand some some possible possible communications communications in the in the future future were were discussed discussed andand arranged thearranged coinciding spaces were divided in half and some possible communications in the future were discussed and the coinciding spaces were divided in half and some arranged possible communications in the future were discussed and the coinciding spaces were divided in half and some arranged possible communications in the future were discussed and arranged

team team 20 20 gave gave up up most most of20itsof its up team gave most of its space coinciding coinciding space as as team 20 gave up as coinciding space long long asofwe, as we, team team mostas its team long we, team 20 gave up assome 14, 14, gave gave him him some coinciding space 14, gave him some most oflight its light exterior exterior coming coming long as we, team exterior light coming coinciding space as 14, gaveour him some through through our through our long as light we, coming team exterior program program program 14, gave him some

PLANTA PLANTA 8 8 PLANTA 8 PLANTA 8 PLANTA 8

through our exterior programlight coming through our program

team 19 gave up most of its team team 19 19 gave gave up up team 19 gave up coinciding most most ofof its ofspace its most its with the condition team 19 gave up coinciding coinciding space space coinciding space to have access to most ofthe its with with the condition condition with the condition our program in the coinciding spaceto to have access indicated area andto to towith have to have access access the condition our program ininthe collaborate together our our program program the in the to have access to indicated area and in the structure indicated indicated area andand our program inarea the collaborate together indicated area and collaborate together together in collaborate the structure collaborate together in the in the structure structure

in the 20 structure team will have the right to the facades team 20 willspaces have the and some to right to the facades communicate with team 20 20 willspaces have the team 20 will will have have and some tothe the theteam indicate area as right to the facades right right to to the facades facades communicate with well as the create and some spaces the indicate areaspaces astoto to communications and and some some spaces communicate with well as create between the two communicate thecommunicate indicate areawith aswith communications programs the the indicate areaarea as as well asindicate create between the two communications well well as create as create programs between the two communications communications programs

between between the the twotwo programs programs

Negotiations

96


3 previous program


99


25% Air's transparency 5 - 30ºC Winter's air temperature (12h) -10 - 30ºC Winter's floor temperature (12h) 90% Relative winter's air humidity (12h) 1000€€/m2 Rentability 90% Hermeticism

10. Inaccesible Program

100


10. Inaccesible Program

101


10. Inaccesible Program

102


10. Inaccesible Program

103


25% Air's transparency 5 - 30ºC Winter's air temperature (12h) -10 - 30ºC Winter's floor temperature (12h) 90% Relative winter's air humidity (12h) 1000€€/m2 Rentability 90% Hermeticism

10. Inaccesible Program

104


10. Inaccesible Program - Diagram

105


TEAM 14 - EDUARDO NAVARRO - P7- -Assigned 3 MINUTEarea PRESENTATION 10. Inaccesible Program

1

106


02

01

03

04 05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21 22

24

23

25

26 27

28

29

31

30

32

TEAM - EDUARDO NAVARRO - P7 - 3of MINUTE PRESENTATION 10.14 Inaccesible Program - Elevation the assigned area

1 107


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - First plan 1

108


TEAM 14 - EDUARDO NAVARRO - P7- -First 3 MINUTE PRESENTATION 10. Inaccesible Program intentions

1 109


TEAM 14 - EDUARDO NAVARRO - P7- -First 3 MINUTE PRESENTATION 10. Inaccesible Program intentions

1

110


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - First intentions (8th floor) 1

111


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - First intentions (9th floor) 1

112


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION 10. Inaccesible Program - First intentions (10th floor) 1

113


10. Inaccesible Program - First intentions (transversal section) TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

114


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

115

10. Inaccesible Program - Conceptual model


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

10. Inaccesible Program - Conceptual model

116


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Conceptual model

1

117


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program 1

118


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Conceptual model

1

119


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Conceptual model

1

120


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

10. Inaccesible Program

121


TEAM 14 - EDUARD

O NAVARRO - P7 - 3

MINUTE PRESENTATI

ON

1

10. Inaccesible Program

122


TEAM 14 - EDUARDO - P7 - 3 MINUTE PRESENTATION 10.NAVARRO Inaccesible Program

1 123


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Image of the first idea 1

124


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - First 1/50 Model 1

125


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - First 1/50 Model 1

126


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Second proposal's plan 1

127


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Second proposal's plan 1

128


10. Inaccesible Program - Second proposal's transversal section

129


10. Inaccesible Program - Second proposal's transversal section

130


TEAM 14 - EDUARDO NAVARRO -

10. Inaccesible Program - Second proposal's longitudinal section

1 131


- P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Second proposal's longitudinal section

132


TEAM 14 - EDUARDO NAVARRO -

10. Inaccesible Program - Second proposal's longitudinal section

133


- P7 - 3 MINUTE PRESENTATION

10. Inaccesible Program - Second proposal's longitudinal section

134


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

135

10. Inaccesible Program - Second proposal's interior image


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

10. Inaccesible Program - Second proposal's interior image

136


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

137

10. Inaccesible Program - Second proposal's 1/50 model


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

10. Inaccesible Program - Second proposal's 1/50 model

138


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

139

10. Inaccesible Program - Second proposal's 1/50 model


TEAM 14 - EDUARDO NAVARRO - P7 - 3 MINUTE PRESENTATION

1

10. Inaccesible Program - Second proposal's 1/50 model

140


10. Inaccesible Program - Third proposal's plan

141


10. Inaccesible Program - Third proposal's plan

EDUARDO NAVARRO MARTĂ?NEZ - P7

142


10. Inaccesible Program - Third proposal's plan (zoom)

143


10. Inaccesible Program - Third proposal's plan (zoom)

144


10. Inaccesible Program - Third proposal's plan (zoom)

145


10. Inaccesible Program - Third proposal's plan (zoom)

146


10. Inaccesible Program - Third proposal's plan (zoom)

147


10. Inaccesible Program - Third proposal's plan (zoom)

148


10. Inaccesible Program - Third proposal's section

149


EDUARDO NAVARRO MARTĂ?NEZ - P7

10. Inaccesible Program - Third proposal's section

150


10. Inaccesible Program - Third proposal's section (zoom)

151


10. Inaccesible Program - Third proposal's section (zoom)

152


10. Inaccesible Program - Third proposal's section (zoom)

153


10. Inaccesible Program - Third proposal's section (zoom)

154


10. Inaccesible Program - Third proposal's section (zoom)

155


10. Inaccesible Program - Third proposal's section (zoom)

156


10. Inaccesible Program - Fourth proposal's plan

157


10. Inaccesible Program - Fourth proposal's plan

EDUARDO NAVARRO MARTĂ?NEZ - P7

158


10. Inaccesible Program - Fourth proposal's plan

159


10. Inaccesible Program - Fourth proposal's plan

160


10. Inaccesible Program - Fourth proposal's plan

161


10. Inaccesible Program - Fourth proposal's plan

162


10. Inaccesible Program - Fourth proposal's plan

163


10. Inaccesible Program - Fourth proposal's plan

164


10. Inaccesible Program - Fourth proposal's section

165


EDUARDO NAVARRO MARTĂ?NEZ - P7

10. Inaccesible Program - Fourth proposal's section

166


10. Inaccesible Program - Fourth proposal's section (zoom)

167


10. Inaccesible Program - Fourth proposal's section (zoom)

168


10. Inaccesible Program - Fourth proposal's section (zoom)

169


10. Inaccesible Program - Fourth proposal's section (zoom)

170


10. Inaccesible Program - Fourth proposal's section (zoom)

171


10. Inaccesible Program - Fourth proposal's section (zoom)

172


C

final version


1 plan drawings


CONTROL AND EDITING ROOM

STRUCTURAL CONCRETE PILAR

PROJECTED WALL IN AN INFERIOR LEVEL

GROUND FLOOR VERSATILE MULTIPURPOSE SPACE

RESTROOM AND SHOWERS

ELEVATED PROJECTED STAINLESS STEEL PILAR FOR THE CELL WALL STAINLESS STEEL PILAR FOR THE CELL WALL

LOCKER AND DRESSING ROOM

UPPER FLOOR

177

SHORT MEMORY

10. Inaccesible Program - FINAL PLAN INTERMEDIATE FLOOR

VEGETATION OF THE CELL WALL

THIS TV AND MOVIES RECORDING STUDIO IS FORMED BY A POLIGONAL GREEN CELL WALL THAT CONFIGURATES THE VARIABLE RECORDING STAGES AND THE SERVING SPACES SUCH AS THE LOCKER AND CH SLABS ARE MOVED BY A HYDRAULIC PISTON SYSTEM WHICH CAN CREATE MULTIPLE DIFFERENT STAGES DEPENDING ON WHAT THE NEEDS OF EACH RECORDING SESSION IS. A SECONDARY STRUCTURE IN THE THROUGHOUT ALL THE SPACE TO ACCOMMODATE TO THE VARYING RECORDING SPACES, ALSO HOLDING ALL THE NECESSARY ATREZZO. AT THE LOWER PART OF THIS SPACE THERE IS A VERSATILE MULTIPURPOSE SPACE IN WHICH WE HAVE A MORE OPEN SPACE WITH MOVING PLATFORMS THAT CAN CREATE A WIDE RANGE OF SCENERIES. DIFFERENT SPACES CREATING A GRADIENT OF LIGHT.


GREEN CELL WALL

SECONDARY STRUCTURE

MOVING STEEL TRAMEX SLABS

GRAPHIC SCALE

CHANGING ROOMS, RESTROOMS AND THE CONTROL AND EDITING ROOM. THE MOVING STEEL TRAMEX HE CEILING CARRIES ALL THE LIGHTING AND RECORDING EQUIPMENT WHICH HAS TO BE ABLE TO MOVE

. WITH THE LIGHT COMING FROM THE TOP, THE GREEN CELL WALL HELPS DISTRIBUTE IT TO ALL THE

PLANIMETRIC PLAN 10. Inaccesible Program - FINAL PLAN N

TV AND MOVIE RECORDING STUDIO

0

1

2

3

4

ATLAS OF EMULATIONS OF THE INFORMAL II: FROM PLANIMETRIC TO HOLOGRAPHIC (2013-2014)

EDUARDO NAVARRO MARTÍNEZ - 10293

PROYECTOS 7 - UNIDAD FEDERICO SORIANO

5 m

178


CONTROL AND EDITING ROOM

STRUCTURAL CONCRETE PILAR

10. Inaccesible Program - FINAL PLAN (ZOOM) RESTROOM AND SHOWERS

179


ONCRETE PILAR

PROJECTED WALL IN AN INFERIOR LEVEL

GROUND FLOOR VERSATILE MULTIPUR

10. Inaccesible Program - FINAL PLAN (ZOOM) LOCKER AND

180


GROUND FLOOR VERSATILE MULTIPURPOSE SPACE

10. Inaccesible Program - FINAL PLAN (ZOOM) LOCKER AND DRESSING ROOM

181


GREEN CELL WALL

10. Inaccesible Program - FINAL PLAN (ZOOM) SECONDARY STRUCTURE

M

182


10. Inaccesible Program - FINAL PLAN (ZOOM) MOVING STEEL TRAMEX SLABS

183


10. Inaccesible Program - FINAL PLAN (ZOOM)

184


2

section drawings


CONTROL AND EDITING ROOM

LOCKER AND DRESSING ROOM

RESTROOM AND SHOWERS

VERSATILE MULTIPURPOSE SPACE

ARMADURA DE NEGATIVOS VIGETA SEMIRRESISTENTE RELLENO DE HA-30/B/20/IIa ARM. REPARTO Ø5#15X15

MOVING POSSIBILITIES OF THE HYDRAULIC PISTON

BOVEDILLA DE HORMIGÓN 5 cm

30 cm

SHORT MEMORY

3,2 cm

COMBINATION OF THE MOVING SLABS OF THE BIGGEST POSSIBLESTAGE

VEGETATION OF THE CELL WALL

60 cm

187

THIS TV AND MOVIES RECORDING STUDIO IS FORMED BY A POLIGONAL GREEN CELL WALL THAT CONFIGURATES THE VARIABLE RECORDING STAGES AND THE SERVING SPACES SUCH AS THE LOCKER AND CHA SLABS ARE MOVED BY A HYDRAULIC PISTON SYSTEM WHICH CAN CREATE MULTIPLE DIFFERENT STAGES DEPENDING ON WHAT THE NEEDS OF EACH RECORDING SESSION IS. A SECONDARY STRUCTURE IN THE C THROUGHOUT ALL THE SPACE TO ACCOMMODATE TO THE VARYING RECORDING SPACES, ALSO HOLDING ALL THE NECESSARY ATREZZO.

10. Inaccesible Program - FINAL SECTION

AT THE LOWER PART OF THIS SPACE THERE IS A VERSATILE MULTIPURPOSE SPACE IN WHICH WE HAVE A MORE OPEN SPACE WITH MOVING PLATFORMS THAT CAN CREATE A WIDE RANGE OF SCENERIES. W DIFFERENT SPACES CREATING A GRADIENT OF LIGHT.


MOVING RAIL FOR ATREZZO SECONDARY STRUCTURE

GREEN CELL WALL

ATREZZO SECONDARY STRUCTURE

HYDRAULIC PISTON RAIL

STEEL TRAMEX MOVING SLAB

GRAPHIC SCALE

PLANIMETRIC SECTION

ANGING ROOMS, RESTROOMS AND THE CONTROL AND EDITING ROOM. THE MOVING STEEL TRAMEX CEILING CARRIES ALL THE LIGHTING AND RECORDING EQUIPMENT WHICH HAS TO BE ABLE TO MOVE

WITH THE LIGHT COMING FROM THE TOP, THE GREEN CELL WALL HELPS DISTRIBUTE IT TO ALL THE

HYDRAULIC PISTON

10. Inaccesible Program - FINAL SECTION

TV AND MOVIE RECORDING STUDIO

0

1

2

3

4

PISTON ROD FREE HYDRAULIC CYLINDER

ATLAS OF EMULATIONS OF THE INFORMAL II: FROM PLANIMETRIC TO HOLOGRAPHIC (2013-2014)

EDUARDO NAVARRO MARTÍNEZ - 10293

PROYECTOS 7 - UNIDAD FEDERICO SORIANO

5 m

188


CONTROL AND EDITING ROOM

10. Inaccesible Program - FINAL SECTION (ZOOM)

189

VE


LOCKER AND DRESSING ROOM

10.VERSATILE Inaccesible Program - FINAL SECTION (ZOOM) MULTIPURPOSE SPACE

190


RESTROOM AND SHOWERS

10. Inaccesible Program - FINAL SECTION (ZOOM) GREEN CELL WALL

191

MOVING RAIL FO


MOVING RAIL FOR ATREZZO SECONDARY STRUCTURE

10. Inaccesible Program FINAL STEEL TRAMEX-MOVING SLAB SECTION (ZOOM)

HYDRAULIC PISTON RAIL

192


ATREZZO SECONDARY STRUCTURE

10. Inaccesible Program - FINAL SECTION (ZOOM) HYDRAULIC PISTON

HYDRAULIC PISTON RAIL

193

PISTON ROD FREE HYDRAULIC CYLINDER


ATREZZO SECONDARY STRUCTURE

10. Inaccesible Program - FINALPISTON SECTION (ZOOM) ROD FREE HYDRAULIC CYLINDER

HYDRAULIC PISTON

194


3

complementary images


10. Inaccesible Program - GREEN CELL WALL IMAGE

197


10. Inaccesible Program - TRANSVERSAL SECTION

198


10. Inaccesible Program - IMAGE FROM THE GROUND FLOOR

199


10. Inaccesible Program - IMAGE OF THE RECORDING STAGES

200


4

short memory


203


This TV and movies recording studio if formed by a polygonal green cell wall that configures the variable recording stages and the serving spaces such as the locker and changing rooms, restrooms and the control and editing room. The moving steel tramez slabs are moved by a hydraulic piston system which can create multiple different stages depending on what the needs of each recording session is. A secondary structure in the ceiling carries all the lightning and recording equipment which has to be able to move throughout all the space to accommodate to the varying recording spaces, also holding al the necessary atrezzo. At the lower part of this spaces, there is a versatile multipurpose space in which we have a more open space with moving platforms that can create a wide range of sceneries. With the light coming from the top, the green cell wall helps distribute it to all the different spaces creating a gradient of light.

204



Booklet Final UD. Soriano - Eduardo Navarro P7