Page 238

Infrastructure The infrastructure which is necessary for construction and operations of the ski center is estimated on the basis on the market prices for these types of work. The infrastructure comprises the accessible roads, parking spaces, distribution of electrical energy, as well as the basic communal infrastructure. Table no. 69 infrastructure expenses Description

Unit measure

Amount

Single price â‚Ź

Phase I â‚Ź

Phase II â‚Ź

Parking place

1300

700

490.000

420.000

Streets in the base settlement

m'

7.500

450

2.250.000

1.125.000

Mountain roads

m'

20.000

40

480.000

320.000

Other surfaces

m2

5.000

50

200.000

50.000

Distribution of electrical energy from the base settlement all chairlifts and objects on the stages

m'

15000

38

456.000

114.000

Necessary electrical equipement for the chairlifts and ski lifts (junction plates, transformators and other)

lump sum

1

600.000

450.000

150.000

Water supply

lump sum

1

2.500.000

2.000.000

500.000

Sewege and purifying station

lump sum

1

2.800.000

2.400.000

400.000

Managing the space

lump sum

1

1.800.000

1.400.000

400.000

10.126.000

3.479.000

Parking for daily visitors (cars, commercial vehicles and buses)

Total

Vehicles and equipment

Special vehicles for the preparation of the ski stages The expenses that are stated in the following table are estimation for the needs of financial means for procurement of appropriate vehicles for preparation of the stages, vehicles for transport of snow and vehicles necessary for functioning of 237

Fizibility studija carev vrv english translation  

Fizibility studija carev vrv english translation  

Advertisement