Watson Top - ACTION Uptown Proposal

Page 77

hard cost analysis Description

Implementation Documentation

Unit Cost

Quantity UM

Total Cost

Sidewalk Demolition

$0.14

3600 sq ft

$504

Fence Demolition

$2.13

280 ln ft

$597

$28.37

900 cu yd

$25,533

$0.10

2500 sq ft

$250

$6.60

3200 sq ft

$21,120

$18.00

80 ln ft

$1,440

$9.00

5414 sq ft

$48,727

$340.00

1 bump

$340

$20.00

1909 sq ft

$38,180

Demolition

Sidewalk Excavation Plant Clearance Site Prep Subsurface Construction Utility Connections Construction Road Surface Road Modifications Sidewalk Construction ADA Ramps

$100.00

15 matts

$1,500

Gabion Walls

$772.09

51 sections (4’)

$39,377

varies

22 units

$8,030

$200.00

25 planters

$5,000

Seating Modules Landscaping (Planting)

$30,000

Contingency Total

$220,598 Demolition Sidewalk Excavation Subsurface Construction Road Surface Sidewalk Construction Gabion Walls Seating Modules Landscaping Contingency Other

Watson Top ACTION Uptown Carnegie Mellon University School of Architecture 48_550

(includes utility connections, plant clearance, speed bump, and ADA ramps)

IMPLEMENTATION DOCUMENTATION: HARD COST ANALYSIS

IMP3.01