Issuu on Google+


23


SCHEMATIC ONE


Relationship Diagram Terraces

Bike/Ped Paths

Pocket Gardens

Benches

Circulation Seat Walls

Bleachers

Ramps

Event Plaza

Recreational Areas

Accessibility Basketball Courts

Kids Playground

Moveable Seating

Perm Seating Emergency Exits

Active Play Areas

Public Bathrooms

Bridges

Active Gardens

Concept 1 46

This concept schematic focuses on the circulation and connection of both sides of the channel and existing community. Using design elements along the focused area along the channel.


Concept Diagram Schematic 1

Existing

Main Street Elevated Bike/Pedestrian Path

Proposed Circulation

Secondary Plaza Main Central Plaza

Proposed Open Plazas & Rec Areas

Open Rec Areas Soccer Field

47


Master Plan 1

11

4

2

5

6

81

7

9

3 1

12

Legend 1

Beverly Blvd

6

Secondary Plaza

11

City of Montebello

2

Primary Plaza

7

Garden

12

City of Pico Rivera

3

Parking

8

Basketball Courts

4

Open/Rec Area

9

5

Elevated 48 Ped/Bike Path

10

Open/Rec Area Soccer Field

10


Perspective 1

49


SCHEMATIC TWO


Relationship Diagram 2 Moveable Seating

Benches

Ramps

Recreation Areas

Terraces

Accessibility

Bike Racks Seat Walls

Event Plaza

Bleachers Bike/Ped Paths

Bridges

Basketball Courts

Active Play Areas

Circulation Bathrooms

Concept 2 52

Emergency Exits

Perm Seating

Active Gardens Kids Playground

Pocket Gardens

This concept schematic focuses on the open recreational spaces located along the redesigned Rio Hondo Channel. These open spaces are created to attract people for events and other ocassions throughtout the year.


Concept Diagram 2

Existing

Main Street Upper & Lower Bike/Pedestrian Path

Proposed Circulation

Soccer field/Basketball Main Central Plaza Secondary Plaza

Proposed Open Plazas & Rec Areas

Community Garden Small Open Open Rec Areas

53


Master Plan 2

LEGEND 1

Beverly Blvd

6

Secondary Parking Lot

11

Upper Bike/ped path

2

Exteded St bike path

7

Open/Rec Area

12

City of Montebello

3

Parking

8

Kids Playground

13

City of Pico Rivera

4

Soccer Field

9

Garden

14

5

Basketball Courts

10

Open Grass Area

54

Exteded bike path along Whittier Reservoir


Perspective 2

55


SCHEMATIC THREE


Relationship Diagram 3 Terraces

Public Bathrooms

Bridges

Accessibility

Event Plaza

Ramps

Emergency Exits Pocket Gardens

Moveable Seating

Basketball Courts

Bike/Ped Paths

Active Play Areas

Circulation

Picnic Areas

Perm Seating Bike Racks

Kids Playground

Bleachers

Benches Seat Walls

Active Gardens

Concept 3 58

This concept schematic focuses on both, accessibility and circulation throughout the site. The use of bridges, staircases and paths connecting all main areas of the site including soccer field, passive gardens and open areas.


Concept Diagram 3

Existing

Main Street Upper & Lower Bike/Pedestrian Path

Proposed Circulation

Lower paths

Skate park Smal Central Plaza/ Garden Secondary Open Rec Area

Proposed Open Plazas & Rec Areas

Community Garden Small Open area Kids Playground Open Rec Areas

59


Master Plan 3

LEGEND 1

Beverly Blvd

6

Skate Park

11

Upper Bike/ped path

2

Exteded St bike path

7

Open/Rec Area

12

City of Montebello

3

Parking

8

Kids Playground

13

City of Pico Rivera

4

Soccer Field

9

Garden

14

5

Basketball Courts

10

Lower paths

60

Exteded bike path along Whittier Reservoir


Perspective 3

61


Wo r k C i t e d

62 23


Rio Hondo Revitalization Senior Project