Structure Portfolio

Page 40

Arts Centre Construction Sequence

Place timber slab on upper floor. Install glass shelter on the canopy structure.

Roof slabs lifted using crane bridge and a crane vehicle onto external walls and structural columns.

Timber structural wall bolted to upper slab.

Coating water-poof dressed over roof. Glazed Units fitted. Clear the site.

⑫ 40


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.