Arts Centre Construction Sequence
Place timber slab on upper floor. Install glass shelter on the canopy structure.
Roof slabs lifted using crane bridge and a crane vehicle onto external walls and structural columns.
⑨
⑪
Timber structural wall bolted to upper slab.
Coating water-poof dressed over roof. Glazed Units fitted. Clear the site.
⑩
⑫ 40