RWE Dea North Idku Project – Case History Dem Demetriou General Manager PDI Mediterranean LLC


Location


Platforms

NI P2 ~72 m WD Topsides: 385 t Jacket: 940 t Piles: 462 t NI P1 ~59 m WD Topsides: 466 t Jacket: 890 t Piles: 412 t


Pipelines • 10” NB x 7km interfield pipeline between NI-P2 and NI-P1 • 16” NB x 34km export pipeline between NI-P1 and landfall at Meadia • 16” NB x 850m onshore pipeline between landfall and process plant • 4” NB x 1500m water disposal pipeline between process plant and offshore


Onshore Facilities Pipeline Landfall


Scope of Services 2004 • Review of Geophysical & Geotechnical Survey Scope • Review and Revision of FEED Scope of Work • Preparation of Scope of Work for Surveys • Pipeline Routing Studies • Preparation of Conceptual Development Options • CAPEX Cost Estimates • Contract Strategy Workshop


Scope of Services 2005 • Offshore Survey Field Support • Offshore Survey Technical Support • Preparation of Basis of Design • Preparation of Project Schedule • Preparation of Control & Instrumentation Philosophy • Preparation of FEED ITT • Preparation of FEED Bidders List • Preparation of FEED Evaluation Criteria • FEED Tender Review, Evaluation & Award


Scope of Services 2006 • FEED Contractor Management – 2 PDi Team Members resident in Genesis office in London • Technical Direction of FEED • FEED Document Reviews • Weekly & Monthly Reporting


Scope of Services 2007 • Post FEED Support • Preparation of RFQ’s for Long Lead Items • Preparation of ITT’s for Project Execution • Preparation of Project Bidders List • Contract and Procurement Advice • Contract Negotiation Support • Preparation of Project Manual • Preparation of Project Execution Plan • Preparation of Project Quality Plan • Preparation of Project HSE Plan


Scope of Services February 2008 • PDi requested to provide two to three personnel to be part of RWE Dea’s Project Management Team for the duration of the execution phase of the North Idku project.


Scope of Services August 2008 – Ongoing • PDi team of ten full time people in place managing the project for RWE Dea. Range of personnel is from Engineering Manager to Document Controller, both local and expatriate. • Three PDi team members have provided ad-hoc support when needed at critical stages during the project. • Back –up support from London and Aberdeen offices as and when required.


Performance “We would like to thank PDI for the excellent performance and commitment provided to us during the course of the North Idku Development. PDI has provided us with professional, flexible and adaptable engineers from the end of the concept selection phase, through the day-to-day management of the FEED in the Contractors offices and is now providing continued support in the execution phase of the project. In addition, we value the timely and responsive back-up support provided by the home office.�

Helmuth Buhr Project Manager, North Idku RWE Dea