Work Progress as of May 2013 A. Early Industries

Picture 1-4: Construction Area of Township for Early Industrial Estate

Page | 1


B. Access Road Section 1 (KM 18+500 to KM 70+000 from Route No.8 to Myitta):

Picture 1: Temporary Bridge Construction at KM 21+300 is completed.

Picture 2: Temporary Bridge Construction at KM 24+000 is in progress.

Page | 2


Picture 3: Mess Room Construction at Tha Liang Ya Chaung Camp.

Picture 4: Staff House Construction at Tha Liang Ya Chaung Camp.

Page | 3


Picture 5: Main Office Construction at Tha Liang Ya Chaung Camp.

Picture 6: Labor House Construction at Tha Liang Ya Chaung Camp.

Page | 4


Picture 7: Engineer House Construction at Tha Liang Ya Chaung Camp.

Picture 8: Construction of Project Manager House at Thar Liang Ya Chaung Camp.

Page | 5


Picture 9: Overview Main Camp at Thar Liang Ya Chaung Camp.

Picture 10: Staff House Construction at Star Moo Camp is completed.

Page | 6


Picture 11: Engineer House Construction at Star Moo Camp.

Picture 12: Engineer House Construction at Star Moo Camp (Cont.)

Page | 7


Picture 13: Clearing ROW at KM 19+000.

Picture 14: Modification of Slope Protection on Access at KM 37+000 is completed.

Page | 8


Picture 15: Installation of RCP pipes culvert access at KM 36+150 be completed. Section 2 (KM 70+000 to KM 108+000 from Myitta to Sin Byu Daing):

Picture 16: Preparing of Temporary Bridge Construction at KM 71+000.

Page | 9


Picture 17: Abutment of Temporary Bridge is in Construction at KM 84+500.

Picture 18: Installation of RCP Pipes Culvert at KM 74+000 is completed.

Page | 10


Picture 19: Reinforce of Concrete Pavement Access Road at KM 95+000. Section 3 (KM 108+000 to KM 149+593 from Sin Byu Daing to Hti Khee):

Picture 20: Project Engineer House is under construction at Base 1 Camp

Page | 11


Picture 21: Engineer House is under construction at Base 1 Camp.

Picture 22: Warehouse Construction at Base 1 Camp is completed.

Page | 12


Picture 23: Construction of Gas Station at Base 1 Camp is completed.

Picture 24: Cutting and Backfilling Work from KM 140+000 to 145+800.

Page | 13


Picture 25: Experiment Crushing Limestone at KM 135+500

Page | 14


C. Reservoir

Picture 1: Embankment up to +17.73 m.MSL

Picture 2: D/S Part up to +17.63 m.MSL

Page | 15


Picture 3: U/S Riprap Placing up to EL +17.00 m.MSL

Picture 4: U/S Riprap Placing up to EL +17.00 m.MSL

Page | 16


Picture 5: D/S Riprap Placing up to EL +14.00 m.MSL

Picture 6: D/S View

Page | 17


Picture 7: Spillway Rock Excavation

Picture 8: Spillway Rock Excavation

Page | 18


Picture 9: Spillway Chute (1)

Picture 10: Spillway Chute (2)

Page | 19


Picture 11: Reservoir Zone 2 - Cleared

Picture 12: Reservoir Zone 3 – Under Clearing Process

Page | 20


D.

Relocation & Compensation

Picture 1-4: Compensation for Bawah Relocation Area

Picture 5-6: Compensation for Quarry and Quarry Yard

Page | 21


Picture 7-10: Compensation for Access Road to Quarry

Picture 11-14: Compensation for North-South Road (North Section) Page | 22


Picture 15: Compensation for Small Port Area

Picture 16-19: Compensation for ITD Camp Area

Page | 23


Picture 20-23: Compensation for Road Link to Thailand Section 1 (Alignment ROW) from KM 24+600 to 28+500

Picture 24-25: Compensation for Road Link to Thailand Section 1 (Access)

Page | 24


E. Corporate Social Responsibility (CSR) Social Development Program A. Public Health -

Malaria Control

-

Picture 1-6: Delegates from USAID and the US Embassy visited Htein Gyi Village and Pyat Ni Village.

Page | 25


Picture 7-9: the meeting among USAID, URC and CSR team at the Pavillion Hall -

An annual Health Check-up for ITD’s staffs

-

Picture 10-11: Health Check-up atmosphere

Page | 26


Picture 12-13: Blood testing for ITD’s staffs -

Medical treatment and hospitalization

Job Opportunity and Livelihood Development 

CST Training Programs -

Agricultural Training Program for its second session

Picture 14: Agricultural Training at Kyauk Whet Kon Monastery -

Page | 27


Picture 15: Agricultural Training at Ma Yin Gyi Village

Picture 16: Agricultural Training at Htein Gyi Village

Picture 17: Agricultural Training at Pa Ya Dat Village

Page | 28


-

The second session of Thai language Training Program

Picture 18-19: Thai Language Course at CSR Training Room -

Fresh Market for the locals

Picture 20-21: Views of the Fresh Market

Page | 29


-

The CSR Arts and Crafts Center

-

Picture 22-23: Views of CSR Arts and Crafts Center -

Picture 24-25: Coffee Shop Zone

Page | 30


Picture 26-27: Salon Area located in the CSR Arts and Crafts Center Public Relation and Public Hearing A. Site Visit

Picture 28: Japanese Delegates had a Meeting with ITD. B.

Page | 31


C.

Picture 29-30: CSR Representatives were briefing the CSR Activities to the Delegates. 

Public Consultation



Picture 31-32: Meeting with the Myanmar Authorities to discuss about SIA study

Picture 33-34: ESIA Meeting and Public Consultation in the Communities

Page | 32


Picture 35-36: Public Consultation at Mudu Village.

ENVIRONMENTAL RESTORATION PROJECT 

CSR Plant nursery plot III

Picture 37-38: The New Plant Nursery 

Products from Demonstration Plots

Picture 39-40: Nursery I and II

Page | 33


Picture 41: Gardeners are packing the Sprouts in the Bags to be ready to Distribute

Picture 42-44: Plants grown in Demonstration Plot

Page | 34


F. Bawah Resettlement Site

Picture 1-2: Road Work

Picture 3-4: Work Progress of Concrete Block

Picture 5-6: Work Progress of Door and Window

Page | 35


Picture 7-8: Work Progress

Picture 9-10: Work Progress

Picture 11-12: Work Progress of F Plot

Page | 36


Picture13-14: Work Progress

Picture 15-16: Work Progress of Primary School

Picture 17-18: Work Progress of Clinic

Page | 37


Picture 19-20: Work Progress of Staff House

Picture 21-22: Work Progress of Monastery

Picture 23-24: Work Progress of Local Market

Page | 38


Picture 25-26: Work Progress of Sanitary

Picture 27-28: Work Progress of Water Tank

Picture 29-30: Work Progress of Road

Page | 39


G. Site Work

Picture 1: Demonstation Plot

Picture 2-3: Finised Guard House

Page | 40


Picture 4: Improvement of Work Shop Area

Picture 5: Adding More Store Area

Page | 41


Picture 6: Village Head Man Office within ITD Camp

Page | 42


H. Quarry

Picture 1-3: Overview Quarry Area and Crushing Plant

Picture 4-5: Improvement of Road to Quarry KM 4+000 Page | 43


Picture 6-7: Improvement of Road to Quarry KM 3+000

Picture 8-9: Improvement of Road to Quarry KM 2+000 and KM 1+000

Picture 10-11: Improvement of Road to Quarry KM 0+000

Page | 44


Picture 12-17: Improvement of the Road to Top Quarry

Page | 45


O. Small Port

Picture 1: Loading Platform Seeing from the West

Picture 2: Small Port, seeing from the Northwest

Page | 46


Picture 3: Progress of the West Zone of Loading Platform, Seeing from the East

Picture 4: Progress of the West Zone of Loading Platform, Seeing from the North-East

Page | 47


Picture 5: Precast Slab for Loading Platform at the Casting Yard

Picture 6: Precast Slab being Relocated to Install at their Positions

Page | 48


Picture 7: The West Zone of Loading Platform, Seeing from the East

Picture 8: Concrete at Northeast Corner of Loading Platform

Page | 49


ITD Work Progress in May 2013