Issuu on Google+

The
Wear
Group
Ireland
Ltd
 
 
 Risk
Assessment
 FOR
 Diageo
Baileys,
 Nangor
Road,
 
Dublin
 
 To
carry
out
roof
repairs
over
Reception
and
carry
out
 repairs
on
Effluent
Plant
Roof
.
 
 Client:
Diageo
Site:
Diageo
Baileys
 Location:
Nangor
Road,
Dublin

 Issued
By:
Peter
Mc
Cartan
 
 Approved
By:
PMcC
 Date:
07/02/11
 
 The
Wear
Group
Ireland
Ltd
 Gay
Dawn
Offices
 Baltrasna
House
 Kells
 Co
Meath

 REP.
IRELAND
 Tel
046­9244066
 Fax
046­9244166
 Mobile
087­2414066
 
 
 
 
 



Risk
Assessment
CONTENTS
 
 Section
Title
 
 4.0
Risks
 4.1 Works Risk Assessments 4.3 Manual Handling Assessment 4.4 Protection of third parties 5.0
Personal
Protective
Equipment
 
 6.0
Emergency
Arrangements
 6.1 Accident Reporting 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 



4.0
RISK
ASSEMENT
 
 See Appendix A 5.
0
PERSONAL
PROTECTIVE
EQUIPMENT
(PPE)
 
 Site minimum PPE to be worn at all times – helmet, safety boots, safety gloves, High visibility vests and be in possession of hearing protection at all times. All persons have been trained in the use of Safety Harnesses. 6.0
EMERGENCY
ARRANGEMENTS
 
 6.1
Accident
Reporting
 
 All accidents, minor or major, dangerous occurrences or near misses must be reported to Peter Mc Cartan immediately 087-2414066 or John Mc Cartan 046-9244891. 
 
 
 
 
 
 
 
 
 
 
 
 



METHOD
STATEMENT
 
 Risk
Assessment

 
 The
Wear
Group
Ireland

 Appendix
A
 Site
/Contract:
Baileys
Dublin
 
 1.
Activity
and
/or
environment
to
be
assessed
 Contract
No:
Diageo
February
2011
 
 Activity:
 Use
of
Portable
Electrical
Equipment
 Assessment
by:

Peter
Mc
Cartan
 Assessment
Date:
07/02/2011
 Copy
to:
Baileys
Dublin

and
Wear
Group
Site
Employees

 Peter
Mc
Cartan
 Alan
Dawnay
 
 3.
Factors
Affecting
the
Risk:
if
none
state
“NONE”
 
 Risk
Control
Measure
 
 Risk
of
Fire
due
to
using
a
Hot
Air
Gun
 Machine
not
to
be
used
unless
Fire
extinguishers
and
Fire
 Blanket
are
on
site
and
in
position
 Fall
from
roof
 Ensure
that
Safety
Harnesses
and
Safety
Handlines
are
 attached
at
all
times
to
Eye
bolts
that
are
on
the
roof.
 Electric
Shock
Due
to
faulty
cable
or
plug
 Electrical
Connections
to
be
inspected
to
ensure
in
good
 condition.
 Risk
of
Damage
to
eyes
from
ejected
items
 Always
use
PPE
supplied
to
prevent
eye
damage.



Cherry
Picker
attach
safety
harnesses
when
using
the
machine.
 
 4.
Responsibility
­
who
does
what
 
 Employees
and
contractors
to
comply
with
standard
 procedure,
method
statements
and
terms
of
this
 Assessment.
 Employees
must
use
the
Personal
Protective
Equipment
(PPE)
 supplied
at
all
times
 Supervisor’s
/Manager
to
ensure
personnel
are
trained
and
 competent‐Ensure
company
procedures
are
complied
with.
 Manager
to
arrange
that
suitable
and
sufficient
materials
and
 equipment
are
available
for
use
 
 5.
Hazard
Rating:
Likelihood
of
Injury,
Severity
of
Injury
 Persons
Exposed,
Length
of
Exposure
 
 Risk
Rating
 1.
Low:
MAY
OCCUR
1.
Minor:
Up
to
Three
Days
 1.
Low
One
person
1.
Low
Monthly
and
Over
 Low:
1‐4
Points
 2
Medium:
Could
occur
2.
Moderate:
Off
more
than
3
days
 2.
Medium:
two
Persons
2.
Medium:
Weekly
Medium:
5‐7
 points
 3.
High:
Near
Certain
to
Occur
3.
Serious:
Notifiable

 3.
High:
more
than
two
People
 3.
Daily
High:
8+
Points
 
 6.
Hazards
Identified:
 
 Hazard
Identified
 
 Working
Practices/Environment.
 



√ If
present
X
is
absent/not
significant.

 Likelihood
of
injury:
Severity
of
Injury:

 Person
Exposed:
Length
of
Exposure
Risk
Rating
 (Scores
Added)
Control
Measure
in
Place
 
 Risk
of
Contact
with
Electric
cables
 1
2
1
1
MEDIUM
‐
Use
110v
in
place.
 Electric
Shock
1
2
1
1
LOW
‐
Cables
are
inspected
before
use
 Risk
of
Eye
Damage
1
2
1
1
Medium
‐

PPE
to
be
worn
at
all
 times
 Cherry
Picker
1
2
1
1
Medium
–
Only
persons
trained
are
 allowed
to
operate
Plant
 
 METHOD
STATEMENT
 Risk
Assessment

 The
Wear
Group
Ireland
Ltd
 Appendix
A
 Site
/Contract:
Baileys
Dublin
 1.
Activity
and
/or
environment
to
be
assessed
 Contract
No:
Diageo
February
2011
 
 Activity:
 Working
at
heights
 Assessment
by:




Peter
Mc
Cartan
 Assessment
Date:



07/02/2011
 Copy
to:
Baileys
Dublin
and
 Wear
Group
Site
Employees
Peter
Mc
Cartan
and
Alan
Dawnay
 
 3.
Factors
Affecting
the
Risk:
if
none
state
“NONE”
 
 Risk
Control
Measure
 
 Risk
of
Personnel
Injury
due
to
falling
off
roof
 Use
of
Cherry
Picker




Harnesses
are
used
at
all
times
attached
to
safety
rope
 attached
to
eye
bolts
on
the
steelwork
to
the
perimeter
of
the
 roof.
 Risk
of
personnel
injury
by
use
of
harnesses
Engineers
are
 trained
in
use
of
Safety
Harnesses.
 
 4.
Responsibility
­
who
does
what
 
 Employees
and
contractors
to
comply
with
standard
 procedure,
method
statements
and
terms
of
this
 Assessment.
 Employees
must
use
the
Personal
Protective
Equipment
(PPE)
 supplied
at
all
times
 Supervisor’s
/Manager
to
ensure
personnel
are
trained
and
 competent‐Ensure
company
procedures
are
 complied
with.
 Manager
to
arrange
that
suitable
and
sufficient
materials
and
 equipment
are
available
for
use
 Only
operative
with
training
are
allowed
to
operate
Plant.
 
 5.
Hazard
Rating:
 
 Likelihood
of
Injury
Severity
of
Injury
 Persons
Exposed
Length
of
Exposure
Risk
Rating
 
 1.
Low:
MAY
OCCUR
1.
Minor:
Up
to
Three
Days
 1.
Low
One
person
1.
Low
Monthly
and
Over
Low:
1‐4
Points
 2
Medium:
Could
occur
2.
Moderate:
Off
more
than
3
days
 2.
Medium:
two
Persons
2.
Medium:
Weekly
Medium:
5‐ 7points
 3.
High:
Near
Certain
to
Occur
3.
Serious:
Notifiable
3.
High:
 More
than
two
 person
 3.
Daily
High:
8+
Points



6.
Hazards
Identified:
 
 Hazard
Identified
 
 Working
Practices/Environment.
 √ If
present
X
is
absent
/
not
significant.
 Likelihood
of
injury:
 Severity
of
Injury:
Person
Exposed:
Length
of
Exposure
 Risk
Rating
(Scores
Added)
Control
Measure
in
Place
 
 Injury
to
Personnel
due
to
falling
from
roof
 
 1
3
1
1
MEDIUM
Harnesses
used
at
all
times
attached
to
safety
 hand
lines
attached
to
eyebolts
in
the
steelwork
to
the
 perimeter
of
the
roof.
 
 Injury
to
Personnel
due
to
harnesses
 
 1
2
1
1
MEDIUM
Engineers
are
trained
in
the
use
of
safety
 harnesses.
 
 
 
 
 
 
 
 
 
 
 
 
 



HEALTH
AND
SAFETY
CONFIRMATION
RECORD
 I confirm receipt of the Method Statement and related Risk Assessments for the Contract. (Revision status and No number as below). I confirm that the contents and requirements have been explained and that I have read and understand the Method Statement and the Risk Assessments and that I will work in accordance with the requirements detailed. 



Risk Assessment