Page 1

SAP C_TSCM62_65 SAP Certified Application Associate - Order Fulfillment with SAP ERP 6.0 EHP5 http://www.test4certification.com/C_TSCM62_65.html

Total Question

Demo

Get Complete Collection of SAP Exam's PDF.

1


Question: 1 Which of the following elements can directly influence whether an availability check will be performed? (Choose two) A. The schedule line category in the sales document B. The delivery type C. The check group in the material master D. The item category in the sales document

Answer: A, C Question: 2 Based on which of the following dates is the availability check (ATP) carried out? A. Requested delivery date B. Replenishment lead date C. Material availability date D. Goods issue date

Answer: C Question: 3 According to the system there is no stock available, but you still receive a confirmed schedule line in the sales order. What is the reason for this confirmation? A. The availability check that was carried out included a replenishment lead time in the scope of check. B. The system automatically searches other plants for inventory and transfers this inventory to the plant with zero inventory in the sales order. C. The availability check was carried out, and on saving, the system immediately rescheduled the sales order according to the customer priority. D. Inventory Management creates a stock transfer when the sales order is saved.

Answer: A

Get Complete Collection of SAP Exam's PDF.

2


Question: 4 If the material entered in the sales order is not available, how is the user alerted to this situation? A. The incompletion log displays the unconfirmed schedule line as a missing field. B. The availability control screen is displayed. C. The schedule line is marked and highlighted by the system. D. An error message appears on the status bar alerting the user to the situation.

Answer: B Question: 5 As a member of the project team, you are asked to set up the system so that user has to enter an order reason when processing a sales order. It should be possible to save the incomplete order, but further processing should not be possible until the Order Reason field is filled. How do you implement this requirement? A. You define an incompletion procedure with the Order Reason field and mark it as mandatory. B. You define an incompletion procedure with the Order Reason field and assign a status group in which the fields General, Delivery, and Billing Document are selected. C. You define an incompletion procedure with the Order Reason field, assign it to the sales document type, and set the status to "released for further process steps". D. You define an incompletion procedure with the Order Reason field and assign it to a sales document type that has the "Incompletion Message" indicator set.

Answer: B Question: 6 Which of the following statements regarding material determination are correct? (Choose two) A. The definition of the substitution reason determines whether a manual or an automatic substitution process should be used. B. Condition tables must be defined in Customizing (IMG). C. The relevant substitution reason is specified in the access sequence. D. The material determination procedure is assigned to a combination of sales areas, customer pricing procedures, and document pricing procedures.

Answer: A, B Get Complete Collection of SAP Exam's PDF.

3


Question: 7 You want to restrict the materials a customer can order. What do you use to achieve this? A. Material listing B. Product hierarchy C. Material group D. Assortment module

Answer: A Question: 8 Which of the following statements regarding the free goods process is correct? A. Free goods with an exclusive bonus quantity must contain the same material for both the ordered goods and the free goods. B. Free goods with an inclusive bonus quantity will always be generated without a subitem. C. The free goods calculation rule only allows for whole unit free goods bonus increments. D. Free goods with an exclusive bonus quantity will always be generated with a subitem.

Answer: D

Get Complete Collection of SAP Exam's PDF.

4


Thank You for Using Our Product

SAP C_TSCM62_65 SAP Certified Application Associate - Order Fulfillment with SAP ERP 6.0 EHP5 http://www.test4certification.com/C_TSCM62_65.html

Test4certification provide latest certification material only.

Microsoft MCSE

Cisco

IBM

CCNA

MCSA 2003

CCVP

70-620 70-680

642-427 642-642

IBM Mastery 00M-646 00M-245 IBM Lotus 000-M64 000-M48 IBM Tivoli software 000-560 000-033 IBM Cloud Computing 000-032 000-280 IBM Storage 000-203 000-957

MCAS

CCDA

77-884 77-602

640-863 640-864

IBM WebSphere

70-281 70-282

640-760 640-816

MCTS

CCNP

70-664 70-672

642-812 642-825

MCITP

CCDP

70-667 70-642

642-902 642-874

MBS

CCSP

MB6-872 MB2-876

642-627 642-545

000-172 000-216

HP

Apple

HP APC

ACMT

HP0-J47 HP0-S29

9L0-063 9L0-010

HP ASP

Mac OS X

HP3-C15 HP2-B44

9L0-407 9L0-510

HP ASC HP2-E34 HP2-K22

ACTC 9L0-062 9L0-624

HP Specialist

ACSP

HP3-X01 HP2-E44

9L0-402 9L0-410

Master ASE

ACMA

HP0-J44 HP0-M24

9L0-827 9L0-619

HP Sales HP2-E43 HP2-Z14

Get Complete Collection of SAP Exam's PDF.

Logic Pro 9 9L0-837 9L0-839

5

C tscm62 65 test4certification com  
Read more
Read more
Similar to
Popular now
Just for you